Hinkle Construction Services LLC submitted 147 bids on Kentucky Transportation Cabinet contracts in the data, from 21 FEB 2020 to 24 SEP 2026, and was the low bidder on 23 of them (16%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $79,142,501
- Latest bid
- 24 SEP 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 13 | 1 | 8% |
| 2021 | 13 | 4 | 31% |
| 2022 | 16 | 1 | 6% |
| 2023 | 28 | 10 | 36% |
| 2024 | 33 | 6 | 18% |
| 2025 | 27 | 1 | 4% |
| 2026 | 17 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 12 | 22 | 2 | 9% |
| District 10 | 19 | 4 | 21% |
| District 7 | 14 | 6 | 43% |
| District 6 | 13 | 3 | 23% |
| District 5 | 9 | 0 | 0% |
| District 4 | 9 | 2 | 22% |
| District 8 | 8 | 2 | 25% |
| District 11 | 6 | 0 | 0% |
| District 3 | 4 | 0 | 0% |
| District 9 | 3 | 2 | 67% |
| District 2 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Steel reinforcement | LB | 89 | 34 (38%) | $1.65 | $1.85 | |
| Armored edge for concrete | LF | 79 | 34 (43%) | $87.60 | $120.00 | |
| Delineator for guardrail BI directional white | EACH | 69 | 29 (42%) | $15.00 | $14.19 | |
| Steel reinforcement-epoxy coated | LB | 84 | 28 (33%) | $2.11 | $2.00 | |
| Guardrail terminal section no 1 | EACH | 75 | 27 (36%) | $100.00 | $85.06 | |
| Concrete sealing | SF | 73 | 25 (34%) | $3.00 | $3.00 | |
| Seeding and protection | SY | 53 | 25 (47%) | $0.83 | $0.85 | |
| Fuel adjustment | DOL | 25 | 25 (100%) | $1.00 | $1.00 | |
| Maintenance fertilizer | TON | 58 | 24 (41%) | $1,500.00 | $1,248.00 | |
| Fabric-geotextile class 2 for pipe | SY | 23 | 23 (100%) | $2.00 | $2.00 | |
| Initial fertilizer | TON | 52 | 22 (42%) | $1,500.00 | $1,200.00 | |
| Structure excav-solid rock | CY | 51 | 22 (43%) | $89.00 | $125.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Frederick & May Construction Co | 59 | 38 of 59 |
| Jave LLC | 55 | 27 of 55 |
| M & M Services Co Inc | 49 | 28 of 49 |
| Bush & Burchett Inc | 38 | 18 of 38 |
| Walker Construction & Materials LLC | 37 | 27 of 37 |
| Central Bridge Co LLC | 29 | 18 of 29 |
| Kay & Kay Contracting LLC | 25 | 16 of 25 |
| Scott and Murphy Inc | 19 | 13 of 19 |
| Haydon Bridge Company Inc | 18 | 3 of 18 |
| Louisville Paving Company Inc | 15 | 10 of 15 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 SEP 2026 | 26-4533 | GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45) | 4 of 4 | $4,356,810 | +68% | |
| 20 AUG 2026 | 26-2948 | CULVERT REPLACEMENT KY 0002 | 3 of 3 | $1,648,910 | +43% | |
| 20 AUG 2026 | 26-5416 | BRIDGE SUPERSTRUCTURE REPLACEMENT KY 61 | 3 of 3 | $949,819 | +16% | |
| 20 AUG 2026 | 26-2233 | CULVERT REPLACEMENT CULVERT REPLACMENTS ON KY 40 IN MARTIN COUNTY | 5 of 5 | $588,987 | +72% | |
| 23 JUL 2026 | 26-1130 | CULVERT REPLACEMENT CULVERT REPLACEMENT ON KY 90 AT MP 10.09 | 2 of 4 | $849,658 | +26% | |
| 21 MAY 2026 | 26-1511 | SLIDE REPAIR KY 7 | 3 of 3 | $5,428,137 | +38% | |
| 21 MAY 2026 | 26-5414 | BRIDGE REPLACEMENT CR 1086 | 2 of 3 | $729,513 | +1.0% | |
| 21 MAY 2026 | 26-1122 | GRADE & DRAIN WITH ASPHALT SURFACE KY 32 | 2 of 2 | $50,481,163 | +15% | |
| 23 APR 2026 | 26-5410 | BRIDGE REPLACEMENT CR 1401 | 5 of 6 | $812,302 | +48% | |
| 23 APR 2026 | 26-5411 | BRIDGE REPLACEMENT CR 1464 | 3 of 8 | $799,517 | +17% | |
| 23 APR 2026 | 26-5413 | BRIDGE REPLACEMENT KY 1102 | 4 of 8 | $799,993 | +28% | |
| 26 MAR 2026 | 26-1508 | GRADE & DRAIN WITH ASPHALT SURFACE BROWN RIDGE RD. (KY 32) | 4 of 4 | $18,167,384 | +90% | |
| 19 FEB 2026 | 26-5405 | BRIDGE REPLACEMENT CR 1380 | 3 of 5 | $1,044,476 | +49% | |
| 19 FEB 2026 | 26-5404 | BRIDGE REPLACEMENT KY 32 | 3 of 7 | $2,562,557 | +25% | |
| 19 FEB 2026 | 26-5406 | BRIDGE REPLACEMENT VARIOUS BRIDGES IN DISTRICT 12 | 4 of 4 | $2,578,176 | +33% | |
| 29 JAN 2026 | 26-5403 | BRIDGE REPLACEMENT US 60 EB OVER CLEAR CREEK | 2 of 5 | $3,099,854 | +4.0% | |
| 29 JAN 2026 | 26-1001 | Fd04 035 0011 010-011 | 3 of 3 | $1,424,476 | +9.0% | |
| 11 DEC 2025 | 25-5399 | BRIDGE REPLACEMENT KY 292 | 5 of 5 | $3,780,331 | +19% | |
| 20 NOV 2025 | 25-1120 | GRADE & DRAIN WITH ASPHALT SURFACE KY 1 | 3 of 3 | $4,421,291 | +28% | |
| 20 NOV 2025 | 25-2341 | JPC PAVEMENT INLAY WINSTON AVE/DECOURSEY AVE (KY 16) | 3 of 3 | $396,052 | +59% | |
| 20 NOV 2025 | 25-1125 | GRADE & DRAIN WITH ASPHALT SURFACE KY 550 (COMBS ROAD) | 3 of 3 | $898,497 | +18% | |
| 20 NOV 2025 | 25-1123 | GRADE & DRAIN WITH ASPHALT SURFACE US 68 IMPROVEMENTS | 2 of 3 | $10,598,850 | +7.0% | |
| 23 OCT 2025 | 25-2343 | JPC PAVEMENT BLACKBURN AVENUE (KY 168) | 4 of 5 | $591,912 | +36% | |
| 23 OCT 2025 | 25-2349 | JPC PAVEMENT SEATON AVENUE (US 23) | 4 of 5 | $2,031,806 | +37% | |
| 23 OCT 2025 | 25-3123 | GRADE & DRAIN KY 466 (KY 466) | 3 of 7 | $346,972 | +19% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way