KYTC contract 26-1001 bid tabulation
Fd04 035 0011 010-011. Let by Kentucky Transportation Cabinet on January 29, 2026. 3 bids received; low bid $1,301,459 by Eaton Asphalt Paving Co Inc, -27% against the engineer's estimate of $1,792,758.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 29 JAN 2026
- Pay items
- 76
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eaton Asphalt Paving Co Inc | $1,301,459 | Low | -27% |
| 2 | Walker Construction & Materials LLC | $1,423,000 | +9.0% | -21% |
| 3 | Hinkle Construction Services LLC | $1,424,476 | +9.0% | -21% |
Engineer's estimate: $1,792,758.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eaton Asphalt Paving Co Inc | 2. Walker Construction & Materials LLC | 3. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 3,542 | $46.00 | $38.00 | $35.00 |
| 0020 | Crushed aggregate size no 2 | TON A A | 4,297 | $34.00 | $34.00 | $34.50 |
| 0030 | Asphalt seal aggregate | TON A A | 34 | $250.00 | $225.00 | $225.30 |
| 0040 | Asphalt seal coat | TON A A | 5 | $1,175.00 | $1.00 | $1,073.70 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 58 | $211.00 | $96.00 | $200.00 |
| 0060 | CL3 asph base 1.00D PG64-22 | TON A A | 2,221 | $90.00 | $86.00 | $95.00 |
| 0070 | Asphalt material for tack | TON A A | 8 | $1.00 | $1.00 | $1.05 |
| 0080 | CL3 asph surf 0.38B PG64-22 | TON A A | 882 | $108.00 | $96.00 | $114.00 |
| 0090 | Fabric-geotextile class 1 | SQYD A A | 5,612 | $2.00 | $2.25 | $1.50 |
| 0100 | Fabric-geotextile class 4A | SQYD A A | 5,612 | $3.00 | $3.50 | $2.70 |
| 0110 | Joint adhesive | LF A A | 6,216 | $0.65 | $1.00 | $0.55 |
| 0120 | Sawcut pavement | LF A A | 3,110 | $2.00 | $2.25 | $2.10 |
| 0130 | Longitudinal edge key | LF A A | 3,110 | $1.80 | $4.50 | $1.90 |
| 0140 | Asphalt milling and texturing | SQYD A A | 10,386 | $2.25 | $7.00 | $2.30 |
| 0150 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 | $590.00 | $1.00 |
| 0160 | Delineator for guardrail BI directional white | EACH A A | 16 | $13.04 | $13.04 | $13.75 |
| 0170 | Temp ditch | LF A A | 800 | $1.00 | $2.00 | $1.15 |
| 0180 | Clean temp ditch | LF A A | 400 | $0.50 | $1.00 | $0.01 |
| 0190 | Granular embankment | CUYD A A | 178 | $50.00 | $75.00 | $73.30 |
| 0200 | Embankment in place | CUYD A A | 10,081 | $19.00 | $19.00 | $16.25 |
| 0210 | Water | MGAL A A | 100 | $1.00 | $1.00 | $0.01 |
| 0220 | Guardrail-steel W beam-S face | LF A A | 1,500 | $28.69 | $28.69 | $30.20 |
| 0230 | Guardrail terminal section no 1 | EACH A A | 3 | $86.11 | $86.11 | $90.70 |
| 0240 | Remove guardrail | LF A A | 1,489 | $2.21 | $2.21 | $2.40 |
| 0250 | Guardrail end treatment type 4A | EACH A A | 1 | $3,748.19 | $3,748.19 | $3,945.50 |
| 0260 | Channel lining class II | TON A A | 10 | $50.00 | $90.00 | $95.00 |
| 0270 | Channel lining class III | TON A A | 426 | $55.00 | $49.00 | $70.50 |
| 0280 | Clearing and grubbing | LS A A | 1 | $20,000 | $75,000 | $72,610 |
| 0290 | Temporary signs | SQFT A A | 124 | $5.00 | $13.00 | $15.50 |
| 0300 | Fabric-geotextile class 2 | SQYD A A | 267 | $2.00 | $2.50 | $2.05 |
| 0310 | Fabric-geotextile class 2 for pipe | SQYD A A | 162 | $2.00 | $2.00 | $2.00 |
| 0320 | Maintain & control traffic | LS A A | 1 | $47,000 | $75,000 | $40,500 |
| 0330 | Portable changeable message sign | EACH A A | 2 | $3,900.00 | $3,000.00 | $3,866.00 |
| 0340 | Mobilization for mill & text | LS A A | 1 | $10,000 | $2,500.00 | $10,526 |
| 0350 | Edgeline rumble strips | LF A A | 2,887 | $0.75 | $1.31 | $1.40 |
| 0360 | Temp silt fence | LF A A | 800 | $3.00 | $3.00 | $8.10 |
| 0370 | Silt trap type A | EACH A A | 8 | $100.00 | $200.00 | $352.50 |
| 0380 | Silt trap type B | EACH A A | 8 | $100.00 | $200.00 | $372.50 |
| 0390 | Silt trap type C | EACH A A | 8 | $100.00 | $100.00 | $432.30 |
| 0400 | Clean silt trap type A | EACH A A | 8 | $50.00 | $20.00 | $30.50 |
| 0410 | Clean silt trap type B | EACH A A | 8 | $50.00 | $20.00 | $30.50 |
| 0420 | Clean silt trap type C | EACH A A | 8 | $50.00 | $10.00 | $30.50 |
| 0430 | Staking | LS A A | 1 | $10,000 | $12,500 | $20,037 |
| 0440 | Pole 30 FT MTG HT | EACH A A | 2 | $5,750.00 | $5,750.00 | $6,204.00 |
| 0450 | Pole base | EACH A A | 2 | $4,000.00 | $4,000.00 | $4,316.00 |
| 0460 | Transformer base | EACH A A | 2 | $3,500.00 | $3,500.00 | $3,776.00 |
| 0470 | Erosion control blanket | SQYD A A | 4,123 | $2.20 | $2.20 | $2.50 |
| 0480 | Temp mulch | SQYD A A | 24,200 | $0.34 | $0.34 | $0.35 |
| 0490 | Temp seeding and protection | SQYD A A | 18,150 | $0.36 | $0.36 | $0.40 |
| 0500 | Initial fertilizer | TON A A | 3.20 | $1,360.54 | $1,360.54 | $1,432.00 |
| 0510 | Maintenance fertilizer | TON A A | 1.60 | $1,360.54 | $1,360.54 | $1,432.00 |
| 0520 | Seeding and protection | SQYD A A | 26,620 | $0.62 | $0.62 | $0.65 |
| 0530 | Agricultural limestone | TON A A | 20 | $68.43 | $68.43 | $72.00 |
| 0540 | Pave striping-temp paint-6 in | LF A A | 19,736 | $0.18 | $0.18 | $0.20 |
| 0550 | Pave striping-thermo-6 in W | LF A A | 4,431 | $1.10 | $1.10 | $1.15 |
| 0560 | Pave striping-thermo-6 in Y | LF A A | 4,562 | $1.10 | $1.10 | $1.15 |
| 0570 | Pave striping-thermo-12 in Y | LF A A | 40 | $6.50 | $6.50 | $6.85 |
| 0580 | Pave marking-thermo stop bar-24IN | LF A A | 65 | $12.00 | $12.00 | $12.65 |
| 0590 | Pave marking-thermo cross-hatch | SQFT A A | 635 | $4.00 | $4.00 | $4.20 |
| 0600 | Pave marking-thermo curv arrow | EACH A A | 21 | $125.00 | $125.00 | $132.00 |
| 0610 | Inlaid pavement marker-MW | EACH A A | 10 | $55.00 | $55.00 | $58.00 |
| 0620 | Inlaid pavement marker-by | EACH A A | 51 | $55.00 | $55.00 | $58.00 |
| 0630 | Fuel adjustment | DOLL A A | 6,664 | $1.00 | $1.00 | $1.00 |
| 0640 | Asphalt adjustment | DOLL A A | 12,358 | $1.00 | $1.00 | $1.00 |
| 0650 | Object marker TY 3 | EACH A A | 1 | $28.37 | $28.37 | $40.00 |
| 0660 | Centerline rumble strips | LF A A | 1,354 | $1.61 | $1.50 | $1.60 |
| 0670 | Pipeline inspection | LF A A | 191 | $12.10 | $14.00 | $13.80 |
| 0680 | Remove | EACH A A | 2 | $1,000.00 | $950.00 | $1,843.00 |
| 0690 | Culvert pipe-15 in | LF A A | 115 | $90.00 | $135.00 | $80.00 |
| 0700 | Culvert pipe-72 in | LF A A | 28 | $600.00 | $825.00 | $539.00 |
| 0710 | Pipe culvert headwall-15 in | EACH A A | 2 | $1,500.00 | $2,100.00 | $2,505.00 |
| 0720 | Remove pipe | LF A A | 8 | $100.00 | $20.00 | $141.00 |
| 0730 | Remove headwall | EACH A A | 2 | $500.00 | $1,500.00 | $5,350.00 |
| 0740 | Concrete-class A | CUYD A A | 36.68 | $500.00 | $650.00 | $1,570.00 |
| 0750 | Pipe culvert headwall-72 in | EACH A A | 2 | $15,000 | $21,000 | $32,146 |
| 0760 | Demobilization | LS A A | 1 | $19,350 | $21,915 | $20,800 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of January 29, 2026. Compiled by Mirage Metrics.