Eaton Asphalt Paving Co Inc: KYTC bid record
Eaton Asphalt Paving Co Inc submitted 250 bids on Kentucky Transportation Cabinet contracts in the data, from 24 MAR 2022 to 22 OCT 2026, and was the low bidder on 59 of them (24%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $233,760,153
- Latest bid
- 22 OCT 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 59 | 17 | 29% |
| 2023 | 56 | 14 | 25% |
| 2024 | 60 | 12 | 20% |
| 2025 | 54 | 12 | 22% |
| 2026 | 21 | 4 | 19% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 6 | 134 | 38 | 28% |
| District 9 | 54 | 7 | 13% |
| District 7 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Asphalt material for tack | TON | 107 | 107 (100%) | $1.00 | $10.00 | |
| Fuel adjustment | DOL | 85 | 85 (100%) | $1.00 | $1.00 | |
| Asphalt adjustment | DOL | 84 | 84 (100%) | $1.00 | $1.00 | |
| Temporary signs | SF | 137 | 60 (44%) | $5.30 | $6.50 | |
| Asphalt material for tack | TON A A | 50 | 50 (100%) | $1.00 | $1.05 | |
| Asphalt pave milling & texturing | TON | 143 | 40 (28%) | $35.00 | $36.50 | |
| Temporary signs | SQFT A A | 62 | 37 (60%) | $5.00 | $6.05 | |
| Asphalt adjustment | DOLL A A | 37 | 37 (100%) | $1.00 | $1.00 | |
| Fuel adjustment | DOLL A A | 36 | 36 (100%) | $1.00 | $1.00 | |
| Pave striping-temp paint-4 in | LF A A | 43 | 35 (81%) | $0.16 | $0.16 | |
| Pave marking-thermo stop bar-24IN | LF A A | 37 | 33 (89%) | $12.00 | $12.50 | |
| Arrow panel | EACH | 36 | 31 (86%) | $206.50 | $580.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Riegler Blacktop Inc | 115 | 68 of 115 |
| Mago Construction Company LLC | 81 | 76 of 81 |
| H G Mays Corporation | 78 | 71 of 78 |
| Hinkle Contracting Company LLC | 34 | 21 of 34 |
| Strawser Construction Inc | 18 | 6 of 18 |
| Louisville Paving Company Inc | 9 | 3 of 9 |
| Mac Construction & Excavating Inc | 7 | 5 of 7 |
| Lawrence Construction and Leasing Inc | 4 | 2 of 4 |
| Sunesis Construction Co | 4 | 0 of 4 |
| Lonkard Construction Company | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 OCT 2026 | 26-3046 | ASPHALT RESURFACING PERKINS RIDGE RD (KY 1011) | 3 of 3 | $249,910 | +14% | |
| 22 OCT 2026 | 26-3061 | ASPHALT RESURFACING EDEN SHALE RD (KY 845) | 5 of 5 | $323,669 | +20% | |
| 22 OCT 2026 | 26-3047 | ASPHALT RESURFACING LIGHTFOOT FORK (KY 1657) | 3 of 3 | $261,700 | +16% | |
| 22 OCT 2026 | 26-3048 | ASPHALT RESURFACING WOLF RUN RD (KY 616) | 2 of 2 | $92,459 | +13% | |
| 03 SEP 2026 | 26-2125 | ASPHALT RESURFACING KY 1120 & KY 17 IN KENTON COUNTY | 1 of 2 | $747,727 | Low, 9.0% under the second | |
| 03 SEP 2026 | 26-3030 | ASPHALT RESURFACING BUCKS RUN RD (KY 1112) | 4 of 4 | $428,497 | +14% | |
| 03 SEP 2026 | 26-2238 | ASPHALT RESURFACING KY 842 IN BOONE & KENTON COUNTY | 2 of 2 | $640,030 | +2.0% | |
| 20 AUG 2026 | 26-2229 | ASPHALT RESURFACING MADISON PIKE (KY 17) | 1 of 3 | $187,762 | Low, 1.0% under the second | |
| 20 AUG 2026 | 26-2126 | ASPHALT RESURFACING MADISON PIKE (KY 17X) | 3 of 3 | $539,131 | +1.0% | |
| 20 AUG 2026 | 26-2156 | ASPHALT RESURFACING EAST SECOND STREET (KY 2513) | 2 of 2 | $460,975 | +37% | |
| 20 AUG 2026 | 26-3026 | ASPHALT RESURFACING GLENCOE RD (KY 16) | 4 of 5 | $105,602 | +9.0% | |
| 20 AUG 2026 | 26-3025 | ASPHALT RESURFACING SWOPE NATLEE RD (KY 2018) | 3 of 3 | $297,540 | +20% | |
| 21 MAY 2026 | 26-1118 | ASPHALT REHAB INTERSTATE/PARKWAY I-71 | 1 of 4 | $3,497,183 | Low, 3.0% under the second | |
| 26 MAR 2026 | 26-4100 | ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 8 (KY 8) | 2 of 3 | $1,191,603 | +6.0% | |
| 26 MAR 2026 | 26-2080 | ASPHALT RESURFACING CHAMBERS ROAD (KY 2951) | 2 of 2 | $282,523 | +2.0% | |
| 26 MAR 2026 | 26-2160 | ASPHALT RESURFACING MARY INGLES HIGHWAY (KY 8) | 3 of 3 | $518,264 | +25% | |
| 26 MAR 2026 | 26-2127 | ASPHALT RESURFACING ALEXANDRIA PIKE (US 27) | 3 of 3 | $782,039 | +6.0% | |
| 26 MAR 2026 | 26-2059 | ASPHALT RESURFACING CORINTH ROAD (KY 330) | 3 of 3 | $175,703 | +40% | |
| 19 FEB 2026 | 26-2057 | ASPHALT RESURFACING BIG SUGAR ROAD (US 127) | 3 of 5 | $290,655 | +10% | |
| 19 FEB 2026 | 26-2103 | ASPHALT RESURFACING TURKEYFOOT ROAD (KY 1303) | 2 of 2 | $1,049,095 | +2.0% | |
| 29 JAN 2026 | 26-1001 | Fd04 035 0011 010-011 | 1 of 3 | $1,301,459 | Low, 9.0% under the second | |
| 11 DEC 2025 | 25-2413 | PAVEMENT (WITH ALTERNATES) KY 1072 & KY 1303 IN KENTON COUNTY | 2 of 3 | $613,174 | +2.0% | |
| 20 NOV 2025 | 25-2382 | PAVEMENT (WITH ALTERNATES) STEWARTSVILLE ROAD (KY 36) | 2 of 4 | $289,056 | +26% | |
| 20 NOV 2025 | 25-2384 | PAVEMENT (WITH ALTERNATES) AA HIGHWAY (KY 9) | 2 of 3 | $652,135 | +16% | |
| 20 NOV 2025 | 25-2393 | PAVEMENT (WITH ALTERNATES) AA HIGHWAY (KY 10) | 2 of 3 | $583,909 | +17% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.