KYTC contract 26-4100 bid tabulation
ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 8 (KY 8). Let by Kentucky Transportation Cabinet on March 26, 2026. 3 bids received; low bid $1,123,619 by H G Mays Corporation, -31% against the engineer's estimate of $1,635,317.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 26 MAR 2026
- Pay items
- 50
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | H G Mays Corporation | $1,123,619 | Low | -31% |
| 2 | Eaton Asphalt Paving Co Inc | $1,191,603 | +6.0% | -27% |
| 3 | Mountain Enterprises Inc | $1,443,690 | +28% | -12% |
Engineer's estimate: $1,635,317.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H G Mays Corporation | 2. Eaton Asphalt Paving Co Inc | 3. Mountain Enterprises Inc |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 1,165 | $65.00 | $52.00 | $74.50 |
| 0020 | Asphalt seal aggregate | TON A A | 491 | $115.00 | $70.00 | $132.50 |
| 0030 | Asphalt seal coat | TON A A | 59 | $500.00 | $765.00 | $832.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 2 | $110.00 | $1,250.00 | $129.50 |
| 0050 | CL2 asph surf 0.38D PG64-22 | TON A A | 3,275 | $110.00 | $105.00 | $129.50 |
| 0060 | Asphalt material for tack | TON A A | 16 | $1.00 | $1.00 | $810.00 |
| 0070 | Edge key | LF A A | 46 | $34.50 | $10.00 | $64.50 |
| 0080 | Joint adhesive | LF A A | 16,015 | $0.63 | $0.60 | $0.45 |
| 0090 | Embankment in place | CUYD A A | 964 | $51.75 | $84.00 | $61.85 |
| 0100 | Channel lining class II | TON A A | 3,275 | $47.15 | $72.00 | $65.70 |
| 0110 | Clearing and grubbing | LS A A | 1 | $9,027.50 | $7,850.00 | $29,800 |
| 0120 | Temporary signs | SQFT A A | 1,500 | $1.00 | $5.00 | $14.40 |
| 0130 | Fabric-geotextile class 1 | SQYD A A | 166 | $5.75 | $2.50 | $3.95 |
| 0140 | Maintain & control traffic | LS A A | 1 | $67,850 | $66,555 | $149,500 |
| 0150 | Portable changeable message sign | EACH A A | 2 | $1,725.00 | $3,800.00 | $5,500.00 |
| 0160 | Edgeline rumble strips | LF A A | 31,000 | $0.25 | $0.20 | $0.28 |
| 0170 | Temp silt fence | LF A A | 13,755 | $0.58 | $3.00 | $3.25 |
| 0180 | Silt trap type A | EACH A A | 5 | $230.00 | $275.00 | $455.00 |
| 0190 | Silt trap type B | EACH A A | 5 | $230.00 | $275.00 | $455.00 |
| 0200 | Silt trap type C | EACH A A | 5 | $230.00 | $275.00 | $585.75 |
| 0210 | Clean silt trap type A | EACH A A | 5 | $5.75 | $1.00 | $33.70 |
| 0220 | Clean silt trap type B | EACH A A | 5 | $5.75 | $1.00 | $33.70 |
| 0230 | Clean silt trap type C | EACH A A | 5 | $5.75 | $1.00 | $33.70 |
| 0240 | Staking | LS A A | 1 | $10,925 | $15,000 | $19,750 |
| 0250 | Temp mulch | SQYD A A | 3,499 | $0.47 | $0.45 | $0.41 |
| 0260 | Temp seeding and protection | SQYD A A | 2,624 | $0.48 | $0.45 | $0.42 |
| 0270 | Initial fertilizer | TON A A | 0.25 | $1,610.00 | $1,400.00 | $1,400.00 |
| 0280 | Seeding and protection | SQYD A A | 5,248 | $0.87 | $0.80 | $0.76 |
| 0285 | Pave striping-temp paint-6 in | LF A A | 5,000 | $0.14 | $0.12 | $0.12 |
| 0290 | Pave striping-thermo-6 in W | LF A A | 37,080 | $1.04 | $0.90 | $0.90 |
| 0300 | Pave striping-thermo-6 in Y | LF A A | 29,163 | $1.04 | $0.90 | $0.90 |
| 0310 | Pave marking-thermo stop bar-24IN | LF A A | 10 | $14.37 | $12.50 | $12.50 |
| 0320 | Fuel adjustment | DOLL A A | 5,006 | $1.00 | $1.00 | $1.00 |
| 0330 | Asphalt adjustment | DOLL A A | 12,573 | $1.00 | $1.00 | $1.00 |
| 0340 | Pavement marking-thermo letters | EACH A A | 108 | $115.00 | $100.00 | $100.00 |
| 0350 | Trim and remove trees and brush | ACRE A A | 0.18 | $44,563 | $38,750 | $38,750 |
| 0360 | Electronic delivery MGMT system - agg | LS A A | 1 | $575.00 | $0.01 | $1,500.00 |
| 0370 | SBM alum sheet signs .080 in | SQFT A A | 102 | $54.04 | $47.00 | $46.99 |
| 0380 | SBM alum sheet signs .125 in | SQFT A A | 6 | $55.94 | $48.65 | $48.64 |
| 0390 | Steel post type 1 | LF A A | 115 | $35.47 | $30.85 | $30.84 |
| 0400 | Remove sign | EACH A A | 1 | $2,409.53 | $95.25 | $95.24 |
| 0410 | Install sign post reflectors | EACH A A | 13 | $178.51 | $155.25 | $155.23 |
| 0420 | Barcode sign inventory | EACH A A | 27 | $54.76 | $47.65 | $47.62 |
| 0430 | Delineator for guardrail BI directional white | EACH A A | 34 | $17.85 | $15.50 | $15.52 |
| 0440 | Guardrail-steel W beam-S face | LF A A | 1,650 | $37.50 | $32.60 | $32.61 |
| 0450 | Guardrail end treatment type 1 | EACH A A | 3 | $4,084.19 | $3,551.00 | $3,551.47 |
| 0460 | Guardrail end treatment type 7 | EACH A A | 1 | $23,387 | $2,037.00 | $2,036.53 |
| 0470 | Remove guardrail | LF A A | 1,713 | $4.01 | $3.50 | $3.49 |
| 0475 | Extra length guardrail post | EACH A A | 264 | $70.02 | $61.00 | $60.89 |
| 0480 | Demobilization | LS A A | 1 | $16,676 | $17,615 | $21,600 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.