KYTC letting results, March 26, 2026
55 contracts let by Kentucky Transportation Cabinet on March 26, 2026, $167,167,305 in low bids, a median of 2 bidders per contract. On the 55 with an engineer's estimate, the low bid came in under it 47 times; median low bid -14% against the estimate.
- Owner
- Kentucky Transportation Cabinet
- Contracts
- 55
- Low bids, total
- $167,167,305
- Data through
- 22 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 26-1505 | GRADE & DRAIN WITH ASPHALT SURFACE KY 393 | 3 | Cleary Construction Inc | $66,800,000 | $68,900,000 | +3.0% | +4.0% | KYTC | |
| 26-1113 | ASPHALT SURFACE WITH GRADE & DRAIN BRANNON ROAD (KY 1980) | 2 | The Allen Company Inc | $28,532,686 | $35,486,848 | +24% | -22% | KYTC | |
| 26-1508 | GRADE & DRAIN WITH ASPHALT SURFACE BROWN RIDGE RD. (KY 32) | 4 | Frederick & May Construction Co | $9,558,706 | $10,151,122 | +6.0% | -24% | KYTC | |
| 26-2944 | BRIDGE REPAIRS I-64 RIVERSIDE EXPRESSWAY | 4 of 5 | $8,825,000 | $9,049,140 | +3.0% | -2.0% | KYTC | ||
| 26-1116 | GRADE & DRAIN WITH ASPHALT SURFACE KY 181 | 2 | Scotty'S Contracting & Stone LLC | $8,084,455 | $9,862,000 | +22% | -19% | KYTC | |
| 26-1506 | ASPHALT SURFACE WITH GRADE & DRAIN PEMBROKE OAK GROVE RD. (KY 115) | 2 | Scotty'S Contracting & Stone LLC | $7,446,834 | $7,623,145 | +2.0% | -4.0% | KYTC | |
| 26-1112 | ASPHALT REHAB WITH BRIDGE (S) I-64 | 1 | Walker Construction & Materials LLC | $6,064,000 | -14% | KYTC | |||
| 26-5408 | BRIDGE REPLACEMENT KY 79 | 2 of 3 | $2,540,000 | $2,557,471 | +1.0% | +6.0% | KYTC | ||
| 26-4503 | WIDENING WEST 2ND ST (KY 254) | 2 | Scotty'S Contracting & Stone LLC | $2,183,288 | $2,305,811 | +6.0% | -5.0% | KYTC | |
| 26-1117 | ASPHALT SURFACE WITH GRADE & DRAIN US 31W / KY 240 INTERSECTION | 2 | Scotty'S Contracting & Stone LLC | $2,090,409 | $2,250,000 | +8.0% | -25% | KYTC | |
| 26-4409 | SIGNS GENE SNYDER FREEWAY(I-265) | 1 | Eden Fence Inc | $1,927,799 | +5.0% | KYTC | |||
| 26-2154 | JPC PAVEMENT INTERSECTION OF US 127B, US 127 AND ALTON ROAD (US 127B) | 2 | Bluegrass Contracting Corporation | $1,743,550 | $1,859,566 | +7.0% | -7.0% | KYTC | |
| 26-5407 | BRIDGE REPLACEMENT VARIOUS ROUTES IN GRAVES COUNTY | 4 | Jim Smith Contracting Company LLC | $1,199,980 | $1,210,383 | +1.0% | -19% | KYTC | |
| 26-4100 | ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 8 (KY 8) | 3 | H G Mays Corporation | $1,123,619 | $1,191,603 | +6.0% | -31% | KYTC | |
| 26-2133 | ASPHALT RESURFACING MALONETON - SOUTH SHORE ROAD (KY 7) | 2 | Bti Contracting Inc DBA Blacktop Industries | $1,055,366 | $1,169,888 | +11% | -14% | KYTC | |
| 26-2090 | ASPHALT RESURFACING GREENUP - WARNOCK ROAD (KY 2) | 2 | Bti Contracting Inc DBA Blacktop Industries | $968,786 | $1,048,791 | +8.0% | -15% | KYTC | |
| 26-2070 | ASPHALT RESURFACING GUTHRIE ROAD (KY 181) | 1 | Scotty'S Contracting & Stone LLC | $932,928 | -12% | KYTC | |||
| 26-2165 | ASPHALT RESURFACING LAGRANGE ROAD (KY 146) | 6 | Louisville Paving Company Inc | $911,500 | $927,000 | +2.0% | -24% | KYTC | |
| 26-2140 | ASPHALT RESURFACING US 25, US 25W, & KY 6259 IN LAUREL COUNTY | 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $804,582 | -13% | KYTC | |||
| 26-1111 | TRAFFIC COUNTING INDUCTANCE LOOPS VARIOUS STATEWIDE LOCATIONS | 1 | Davis H Elliot Construction Company Inc | $772,150 | -3.0% | KYTC | |||
| 26-2150 | ASPHALT RESURFACING PHELPS - FREEBORN ROAD (KY 194) | 1 | Mountain Enterprises Inc | $761,963 | -4.0% | KYTC | |||
| 26-2127 | ASPHALT RESURFACING ALEXANDRIA PIKE (US 27) | 3 | Riegler Blacktop Inc | $736,504 | $743,702 | +1.0% | -7.0% | KYTC | |
| 26-2145 | ASPHALT RESURFACING LANCASTER STREET (KY 39) | 1 | The Allen Company Inc | $672,697 | -5.0% | KYTC | |||
| 26-2149 | ASPHALT RESURFACING WEST LIBERTY - MOREHEAD ROAD (KY 519) | 2 | Strawser Construction Inc | $663,162 | $697,730 | +5.0% | -2.0% | KYTC | |
| 26-2135 | ASPHALT RESURFACING BIG HILL ROAD (KY 21) | 1 | The Allen Company Inc | $656,976 | -2.0% | KYTC | |||
| 26-2083 | PAVEMENT (WITH ALTERNATES) RICHMOND ROAD (US 25) | 2 | L-M Asphalt Partners LTD D/B/A Ats Construction | $645,976 | $932,616 | +44% | -19% | KYTC | |
| 26-2034 | ASPHALT RESURFACING HARDINSBURG TO FORDSVILLE ROAD (KY 261) | 4 | C & R Construction and Consulting LLC | $621,865 | $640,968 | +3.0% | -27% | KYTC | |
| 26-2168 | PAVEMENT (WITH ALTERNATES) OLD BURKESVILLE ROAD (KY 1590) | 3 | Gaddie-Shamrock LLC | $617,985 | $742,730 | +20% | -6.0% | KYTC | |
| 26-2035 | ASPHALT RESURFACING WEST MAPLE ST/BEAVER DAM ROAD (US 62) | 2 | Scotty'S Contracting & Stone LLC | $574,163 | $677,320 | +18% | -17% | KYTC | |
| 26-2124 | ASPHALT RESURFACING E GL SMITH ST/BEAVER DAM ROAD (US 231) | 2 | Scotty'S Contracting & Stone LLC | $560,290 | $631,750 | +13% | -16% | KYTC | |
| 26-2071 | ASPHALT RESURFACING N LORETTO ROAD (KY 49) | 1 | Haydon Materials LLC | $523,586 | -11% | KYTC | |||
| 26-2050 | ASPHALT RESURFACING BETHLEHEM ROAD (KY 22) | 6 | Mago Construction Company LLC | $512,492 | $537,000 | +5.0% | -20% | KYTC | |
| 26-2105 | ASPHALT RESURFACING EDDYVILLE TO PRINCETON ROAD (KY 293) | 2 | Jim Smith Contracting Company LLC | $424,720 | $483,552 | +14% | -12% | KYTC | |
| 26-2160 | ASPHALT RESURFACING MARY INGLES HIGHWAY (KY 8) | 3 | Mago Construction Company LLC | $414,455 | $436,568 | +5.0% | -16% | KYTC | |
| 26-2112 | ASPHALT RESURFACING BEATTYVILLE - JACKSON ROAD (KY 52) | 1 | Hinkle Contracting Company LLC | $405,685 | +3.0% | KYTC | |||
| 26-2060 | ASPHALT RESURFACING CYNTHIANA - BROOKSVILLE ROAD (KY 19) | 1 | Hinkle Contracting Company LLC | $398,647 | +1.0% | KYTC | |||
| 26-2076 | ASPHALT RESURFACING SHAWNEETOWN TO MORGANFIELD ROAD (KY 56) | 2 | Rogers Group Inc | $389,055 | $396,888 | +2.0% | +8.0% | KYTC | |
| 26-2122 | ASPHALT RESURFACING WELCHBURG ROAD (KY 3443) | 1 | The Allen Company Inc | $353,595 | +4.0% | KYTC | |||
| 26-2109 | ASPHALT RESURFACING JACKSON - SALYERSVILLE ROAD (KY 30) | 1 | Hinkle Contracting Company LLC | $348,788 | -12% | KYTC | |||
| 26-2064 | ASPHALT RESURFACING WEST ST/CHESTNUT ST/WEST MAIN ST/EAST MAIN ST (US 60X) | 4 | Louisville Paving Company Inc | $344,250 | $345,456 | 0.0% | -18% | KYTC | |
| 26-2113 | ASPHALT RESURFACING TAYLORSVILLE ROAD (KY 55) | 7 | Louisville Paving Company Inc | $330,000 | $370,483 | +12% | -27% | KYTC | |
| 26-2069 | ASPHALT RESURFACING OLD TRENTON ROAD (KY 104) | 1 | Scotty'S Contracting & Stone LLC | $280,155 | -16% | KYTC | |||
| 26-1504 | ASPHALT PAVEMENT & ROADWAY REHAB S. MAIN ST. (US 231) | 2 | Scotty'S Contracting & Stone LLC | $278,125 | $382,600 | +38% | -34% | KYTC | |
| 26-2080 | ASPHALT RESURFACING CHAMBERS ROAD (KY 2951) | 2 | Riegler Blacktop Inc | $277,805 | $282,523 | +2.0% | -14% | KYTC | |
| 26-2043 | ASPHALT RESURFACING CAIRO ROAD (KY 305) | 2 | Jim Smith Contracting Company LLC | $267,614 | $359,896 | +34% | -21% | KYTC | |
| 26-2169 | PAVEMENT (WITH ALTERNATES) FURNACE ROAD (KY 213) | 2 | Strawser Construction Inc | $257,298 | $261,573 | +2.0% | +7.0% | KYTC | |
| 26-2115 | ASPHALT RESURFACING WEST LIBERTY - PAINTSVILLE ROAD (KY 172) | 2 | Hinkle Contracting Company LLC | $239,991 | $254,839 | +6.0% | -2.0% | KYTC | |
| 26-2013 | ASPHALT RESURFACING FULTON RD/WATER ST/N 8TH STREET (US 45) | 2 | Jim Smith Contracting Company LLC | $221,733 | $271,237 | +22% | -20% | KYTC | |
| 26-2045 | ASPHALT RESURFACING ZONETON ROAD (KY 1116) | 6 | Mago Construction Company LLC | $210,974 | $216,800 | +3.0% | -31% | KYTC | |
| 26-2093 | ASPHALT RESURFACING OLD WINCHESTER ROAD (KY 15) | 2 | Hinkle Contracting Company LLC | $181,713 | $193,700 | +7.0% | -7.0% | KYTC | |
| 26-2059 | ASPHALT RESURFACING CORINTH ROAD (KY 330) | 3 | Mago Construction Company LLC | $125,920 | $147,195 | +17% | -25% | KYTC | |
| 26-2065 | ASPHALT RESURFACING GARRETT ROAD (KY 1238) | 5 | E & B Paving LLC | $102,758 | $106,089 | +3.0% | -44% | KYTC | |
| 26-4109 | SIGNS-LIGHTING-SIGNALS CUMBERLAND FALLS HIGHWAY (US 25W) | 1 | Davis H Elliot Construction Company Inc | $90,500 | -42% | KYTC | |||
| 26-4103 | WATERBOURNE PAINT STRIPING KY ROUTE 931(KY 931) | 2 | Reynolds-Central Seal A Joint Venture | $55,900 | $77,898 | +39% | -59% | KYTC | |
| 26-2107 | ASPHALT RESURFACING CROPPER ROAD (KY 43) | 5 | Mago Construction Company LLC | $54,328 | $68,946 | +27% | -30% | KYTC |
Gap is the second bid over the low bid. Where a contract shows fewer bids than KYTC received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.