KYTC contract 26-2083 bid tabulation
PAVEMENT (WITH ALTERNATES) RICHMOND ROAD (US 25). Let by Kentucky Transportation Cabinet on March 26, 2026. 2 bids received; low bid $645,976 by L-M Asphalt Partners LTD D/B/A Ats Construction, -19% against the engineer's estimate of $795,085.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 26 MAR 2026
- Pay items
- 28
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $645,976 | Low | -19% |
| 2 | Strawser Construction Inc | $932,616 | +44% | +17% |
Engineer's estimate: $795,085.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. L-M Asphalt Partners LTD D/B/A Ats Construction | 2. Strawser Construction Inc |
|---|---|---|---|---|---|
| 0010 | Microsurfacing-surface course - type A | SQYD A A | 55,243 | $6.50 | |
| 0020 | Microsurfacing-leveling course | SQYD A A | 18,450 | $3.20 | |
| 0030 | Leveling & wedging PG64-22 | TON A A | 761 | $90.00 | |
| 0040 | Mobilization for mill & text | LS A A | 1 | $3,000.00 | |
| 0050 | CL3 asph surf no.4A PG64-22 | TON A A | 1,900 | $128.00 | |
| 0060 | Fine milling | SQYD A A | 6,695 | $3.50 | |
| 0070 | Asphalt material for tack non-tracking | TON A A | 23 | $0.01 | |
| 0080 | Temporary signs | SQFT A A | 366 | $12.72 | $21.95 |
| 0090 | Maintain & control traffic | LS A A | 1 | $12,250 | $48,801 |
| 0100 | Portable changeable message sign | EACH A A | 4 | $646.60 | $1,706.50 |
| 0110 | Arrow panel | EACH A A | 2 | $503.50 | $1,158.00 |
| 0120 | Pave striping-temp paint-4 in | LF A A | 60,000 | $0.16 | $0.20 |
| 0130 | Pave striping removal-6 in | LF A A | 30,000 | $0.30 | $0.35 |
| 0140 | Pave striping-thermo-6 in W | LF A A | 16,000 | $0.85 | $1.05 |
| 0150 | Pave striping-thermo-6 in Y | LF A A | 14,000 | $0.85 | $1.05 |
| 0160 | Pave marking-thermo X-walk-12 in | LF A A | 1,513 | $4.00 | $5.75 |
| 0170 | Pave marking-thermo stop bar-24IN | LF A A | 744 | $8.00 | $9.20 |
| 0180 | Pave marking-thermo cross-hatch | SQFT A A | 1,400 | $4.00 | $5.75 |
| 0190 | Pave marking-thermo curv arrow | EACH A A | 67 | $95.00 | $109.25 |
| 0200 | Law enforcement officer | HOUR A A | 120 | $80.00 | $138.00 |
| 0210 | Pave mark thermo cone cap-solid yellow | SQFT A A | 280 | $4.00 | $5.75 |
| 0220 | Pave marking-thermo yield bar-36 in | LF A A | 18 | $35.00 | $40.25 |
| 0230 | Pave marking thermo-bike lane arrow | EACH A A | 26 | $125.00 | $143.75 |
| 0240 | Pave marking-thermo dotted lane exten | LF A A | 3,170 | $1.00 | $1.15 |
| 0250 | Polymer asphalt emulsion for scrub seal | TON A A | 85 | $965.00 | $895.00 |
| 0260 | Asphalt seal aggregate - type D | SQYD A A | 55,243 | $1.80 | $4.25 |
| 0270 | Install radar presence detector type A | EACH A A | 11 | $913.90 | $1,050.00 |
| 0280 | Demobilization | LS A A | 1 | $10,000 | $14,920 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.