Gaddie-Shamrock LLC: KYTC bid record

Gaddie-Shamrock LLC submitted 89 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 22 OCT 2026, and was the low bidder on 86 of them (97%). When it was not low, its total sat a median 0.0% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$61,952,405
Latest bid
22 OCT 2026
Data through
22 OCT 2026
89Bids
86Low bids
97Win rate, percent
0.0%Median gap to the low bid when not low, 3 bids

By year

YearBidsLow bidsWin rate
201911100%
20209889%
2021141393%
20221616100%
2023252496%
20241010100%
202588100%
202666100%
Gaddie-Shamrock LLC, KYTC: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Pave marking-thermo stop bar-24INLF1110 (91%)$15.00$14.00
Temporary signsSF1010 (100%)$12.72$6.50
Pave striping-thermo-6 in WLF99 (100%)$1.40$1.26
Pave striping-thermo-6 in YLF99 (100%)$1.40$1.25
Overband crack sealingLB99 (100%)$2.50$2.00
Maintain & control trafficLS A A76 (86%)$5,750.00$10,625
Centerline rumble stripsLF75 (71%)$0.60$0.29
DemobilizationLS A A55 (100%)$9,900.00$10,682
Pave striping-perm paint-6 inLF55 (100%)$0.33$0.32
Pave marking-thermo stop bar-24INLF A A54 (80%)$15.00$12.50
Edgeline rumble stripsLF A A53 (60%)$0.27$0.26
Gaddie-Shamrock LLC, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Strawser Construction Inc151 of 15
Rogers Group Inc40 of 4
American Pavements Inc31 of 3
Strawser Construction Inc & Subsidiaries21 of 2
Charles Deweese Construction Inc21 of 2
Microsurfacing Contractors LLC10 of 1
Missouri Petroleum Products Company LLC10 of 1
Gaddie-Shamrock LLC, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 OCT 202626-3057ASPHALT RESURFACING GUTHRIE CHAPEL RD (KY 485)1 of 1$226,019Low
22 OCT 202626-3056ASPHALT RESURFACING VARIOUS RDS IN ADAIR CO1 of 1$350,823Low
22 OCT 202626-3058ASPHALT RESURFACING VARIOUS ROADS IN RUSSELL CO1 of 1$261,405Low
20 AUG 202626-2138ASPHALT RESURFACING EDMONTON - COLUMBIA ROAD (KY 80)1 of 1$745,270Low
26 MAR 202626-2168PAVEMENT (WITH ALTERNATES) OLD BURKESVILLE ROAD (KY 1590)1 of 3$617,985Low, 20% under the second
19 FEB 202626-2110ASPHALT RESURFACING HALES HIGHWAY / MAIN STREET (KY 379)1 of 2$1,290,351Low, 22% under the second
11 DEC 202525-2417PAVEMENT (WITH ALTERNATES) LIBERTY ROAD (KY 206)1 of 2$435,879Low, 45% under the second
25 SEP 202525-2355ASPHALT RESURFACING ALBANY TO JAMESTOWN ROAD (US 127)1 of 2$999,973Low, 13% under the second
21 AUG 202525-3108ASPHALT RESURFACING VARIOUS ROADS IN CUMBERLAND CO1 of 2$368,996Low, 4.0% under the second
05 JUN 202525-3062ASPHALT RESURFACING VARIOUS ROADS IN ADAIR CO1 of 1$526,600Low
05 JUN 202525-3061ASPHALT RESURFACING VARIOUS ROADS IN RUSSELL CO1 of 1$463,060Low
22 MAY 202525-3036ASPHALT RESURFACING VARIOUS ROADS IN CLINTON COUNTY1 of 1$480,375Low
20 MAR 202525-2138District 8ASPHALT RESURFACING RUSSELL SPRINGS ROAD (KY 80)1 of 1$1,163,670Low
23 JAN 202525-2052District 8ASPHALT RESURFACING ADAIR COUNTY (KY 61 & KY 80)1 of 1$872,674Low
14 NOV 202424-2388District 8PAVEMENT (WITH ALTERNATES) GLASGOW ROAD (KY 90)1 of 2$467,983Low, 27% under the second
14 NOV 202424-2374District 8PAVEMENT (WITH ALTERNATES) OLGA - GLENS FORK ROAD (KY 55)1 of 2$287,564Low, 57% under the second
26 SEP 202424-2209District 8ASPHALT RESURFACING ADAIR COUNTY (KY 61 & KY 80)1 of 1$885,330Low
22 AUG 202424-3049District 8ASPHALT RESURFACING GRIDER HILL DOCK ROAD (KY 1266)1 of 1$361,560Low
22 AUG 202424-3077District 8ASPHALT RESURFACING VARIOUS ROADS IN ADAIR CO1 of 1$473,023Low
22 AUG 202424-3078District 8ASPHALT RESURFACING VARIOUS ROADS IN CUMBERLAND CO1 of 1$350,572Low
22 AUG 202424-3079District 8ASPHALT RESURFACING VARIOUS ROADS IN RUSSELL CO1 of 1$395,659Low
21 MAR 202424-2060District 8ASPHALT RESURFACING JAMESTOWN TO COLUMBIA (KY 55)1 of 1$438,642Low
21 MAR 202424-2086District 8ASPHALT RESURFACING LONG BOTTOM TO FREEDOM ROAD (US 127)1 of 1$724,414Low
22 FEB 202424-2045District 8ASPHALT RESURFACING GLASGOW ROAD (KY 90)1 of 1$1,053,769Low
22 JUN 202323-3058District 8ASPHALT RESURFACING KY 415 (KY 415)1 of 1$306,690Low
Gaddie-Shamrock LLC: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy