KYTC letting results, December 11, 2025
20 contracts let by Kentucky Transportation Cabinet on December 11, 2025, $47,917,678 in low bids, a median of 2 bidders per contract. On the 20 with an engineer's estimate, the low bid came in under it 13 times; median low bid -4.0% against the estimate.
- Owner
- Kentucky Transportation Cabinet
- Contracts
- 20
- Low bids, total
- $47,917,678
- Data through
- 22 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 25-1012 | GRADE, DRAIN & SURFACE WITH BRIDGE NEW ROUTE | 2 | Jim Smith Contracting Company LLC | $15,543,899 | $22,290,000 | +43% | 0.0% | KYTC | |
| 25-1128 | GRADE & DRAIN WITH ASPHALT SURFACE OUTER LOOP / FEGENBUSH LANE IMPROVEMENTS | 4 | Louisville Paving Company Inc | $9,778,459 | $10,050,000 | +3.0% | +7.0% | KYTC | |
| 25-1127 | ASPHALT REHAB WITH BRIDGE (S) KY-180 | 1 | Mountain Enterprises Inc | $4,456,702 | +3.0% | KYTC | |||
| 25-1039 | BRIDGE WITH GRADE, DRAIN & SURFACE KY 115 STRUCTURE OVER I-24 | 4 | Hall Contracting of Kentucky Inc | $3,555,000 | $3,748,123 | +5.0% | -5.0% | KYTC | |
| 25-5399 | BRIDGE REPLACEMENT KY 292 | 5 | Walker Construction & Materials LLC | $3,173,879 | $3,275,326 | +3.0% | -15% | KYTC | |
| 25-1126 | ASPHALT PAVEMENT & ROADWAY REHAB KY 90 | 1 | Mago Construction Company LLC | $2,358,118 | -1.0% | KYTC | |||
| 25-2401 | PAVEMENT (WITH ALTERNATES) SOMERSET - STANFORD ROAD (US 27) | 2 | Hinkle Contracting Company LLC | $1,431,548 | $2,605,911 | +82% | +2.0% | KYTC | |
| 25-1037 | BRIDGE WITH GRADE, DRAIN & SURFACE CR-1169 | 5 | Kay & Kay Contracting LLC | $1,241,796 | $1,245,658 | 0.0% | -17% | KYTC | |
| 25-1036 | GRADE & DRAIN WITH ASPHALT SURFACE US-150 | 2 | The Allen Company Inc | $1,086,581 | $1,273,594 | +17% | -13% | KYTC | |
| 25-3139 | ASPHALT RESURFACING VARIOUS ROADS IN OHIO CO | 1 | Scotty'S Contracting & Stone LLC | $888,878 | -2.0% | KYTC | |||
| 25-5400 | BRIDGE REPLACEMENT KY 1046 | 7 | Cambry Contracting Inc | $813,571 | $872,540 | +7.0% | -8.0% | KYTC | |
| 25-3141 | ASPHALT RESURFACING VARIOUS ROADS IN ANDERSON CO | 2 | Mago Construction Company LLC | $624,498 | $735,480 | +18% | -7.0% | KYTC | |
| 25-2413 | PAVEMENT (WITH ALTERNATES) KY 1072 & KY 1303 IN KENTON COUNTY | 3 | Riegler Blacktop Inc | $602,750 | $613,174 | +2.0% | +4.0% | KYTC | |
| 25-2434 | PAVEMENT (WITH ALTERNATES) SANDY HOOK - GRAYSON LAKE ROAD (KY 7) | 2 | Mountain Enterprises Inc | $568,748 | $583,818 | +3.0% | +4.0% | KYTC | |
| 25-3140 | ASPHALT RESURFACING MAYES CREEK RD (KY 438) | 2 | Haydon Materials LLC | $447,931 | $489,105 | +9.0% | -20% | KYTC | |
| 25-2417 | PAVEMENT (WITH ALTERNATES) LIBERTY ROAD (KY 206) | 2 | Gaddie-Shamrock LLC | $435,879 | $632,886 | +45% | -1.0% | KYTC | |
| 25-3138 | ASPHALT RESURFACING KY 1265 (KY 1265) | 5 | Mago Construction Company LLC | $321,531 | $339,413 | +6.0% | -26% | KYTC | |
| 25-2416 | PAVEMENT (WITH ALTERNATES) DANVILLE CONNECTOR (KY 2168) | 1 | The Allen Company Inc | $251,718 | -8.0% | KYTC | |||
| 25-1040 | TRIM & REMOVAL OF TREE & BRUSH NEW ROUTE | 4 | Keetech Constr Horizontal Directional Drilling & Utilities | $186,588 | $238,790 | +28% | -22% | KYTC | |
| 25-2415 | PAVEMENT (WITH ALTERNATES) MCCAUSEY RIDGE ROAD (KY 3338) | 1 | Walker Construction & Materials LLC | $149,606 | +2.0% | KYTC |
Gap is the second bid over the low bid. Where a contract shows fewer bids than KYTC received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.