Cambry Contracting Inc: KYTC bid record
Cambry Contracting Inc submitted 24 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 11 DEC 2025, and was the low bidder on 14 of them (58%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $15,193,060
- Latest bid
- 11 DEC 2025
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 1 | 0 | 0% |
| 2020 | 4 | 2 | 50% |
| 2021 | 4 | 2 | 50% |
| 2022 | 2 | 1 | 50% |
| 2023 | 4 | 4 | 100% |
| 2024 | 6 | 2 | 33% |
| 2025 | 3 | 3 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 6 | 3 | 50% |
| District 2 | 5 | 4 | 80% |
| District 4 | 4 | 1 | 25% |
| District 5 | 2 | 0 | 0% |
| District 7 | 2 | 1 | 50% |
| District 1 | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Delineator for guardrail BI directional white | EACH | 20 | 17 (85%) | $9.79 | $14.19 | |
| Cyclopean stone rip rap | TON | 21 | 15 (71%) | $40.00 | $60.00 | |
| Concrete sealing | SF | 24 | 14 (58%) | $1.50 | $3.00 | |
| Guardrail-steel W beam-S face | LF | 20 | 14 (70%) | $38.40 | $38.00 | |
| Extra length guardrail post | EACH | 14 | 14 (100%) | $31.33 | $50.00 | |
| Armored edge for concrete | LF | 23 | 13 (57%) | $80.00 | $120.00 | |
| Concrete-class AA | CY | 23 | 13 (57%) | $1,800.00 | $1,716.02 | |
| Rail system side mounted MGS | LF | 14 | 12 (86%) | $171.38 | $231.46 | |
| Steel reinforcement-epoxy coated | LB | 23 | 11 (48%) | $1.65 | $2.00 | |
| CL2 asph surf 0.38D PG64-22 | TON | 15 | 11 (73%) | $248.00 | $102.95 | |
| CL2 asph base 1.00D PG64-22 | TON | 14 | 11 (79%) | $178.31 | $135.00 | |
| Asphalt seal aggregate | TON | 13 | 11 (85%) | $432.46 | $261.98 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scott and Murphy Inc | 23 | 5 of 23 |
| Galusha Contracting LLC | 12 | 5 of 12 |
| Jave LLC | 8 | 0 of 8 |
| M & M Services Co Inc | 7 | 1 of 7 |
| Hinkle Construction Services LLC | 6 | 2 of 6 |
| Haydon Bridge Company Inc | 6 | 0 of 6 |
| Ragle Inc | 6 | 0 of 6 |
| Louisville Paving Company Inc | 5 | 0 of 5 |
| American Contracting & Services Inc | 5 | 1 of 5 |
| Todd Johnson Contracting Inc | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 DEC 2025 | 25-5400 | BRIDGE REPLACEMENT KY 1046 | 1 of 7 | $813,571 | Low, 7.0% under the second | |
| 20 NOV 2025 | 25-5396 | BRIDGE REPLACEMENT KY 90 | 1 of 4 | $1,046,481 | Low, 17% under the second | |
| 20 NOV 2025 | 25-2904 | BRIDGE SUPERSTRUCTURE REPLACEMENT CR 1339 (WEST FIFTH STREET) | 1 of 4 | $991,832 | Low | |
| 12 DEC 2024 | 24-1017 | District 2 | BRIDGE REPLACEMENT KY-1033 | 1 of 5 | $1,159,198 | Low, 6.0% under the second |
| 14 NOV 2024 | 24-2943 | District 7 | BRIDGE REPLACEMENT BIRDIE ROAD (KY 395) | 7 of 9 | $830,689 | +17% |
| 14 NOV 2024 | 24-2906 | District 4 | BRIDGE WITH GRADE & DRAIN SHORT LINE PIKE (KY 1195) | 6 of 7 | $639,893 | +48% |
| 24 OCT 2024 | 24-5365 | District 2 | BRIDGE REPLACEMENT KY 143 | 2 of 4 | $1,152,117 | +28% |
| 24 OCT 2024 | 24-2957 | District 4 | BRIDGE REPAIRS BRANDENBURG ROAD (KY 259) | 4 of 7 | $1,699,178 | +20% |
| 24 OCT 2024 | 24-2962 | District 3 | BRIDGE REPLACEMENT BEE SPRINGS ROAD (KY 238) | 1 of 5 | $645,399 | Low, 0.0% under the second |
| 26 OCT 2023 | 23-5320 | District 2 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 2 | 1 of 4 | $2,877,799 | Low, 2.0% under the second |
| 28 SEP 2023 | 23-5321 | District 3 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 3 | 1 of 2 | $1,963,910 | Low, 4.0% under the second |
| 24 AUG 2023 | 23-5318 | District 1 | BRIDGE REPLACEMENT KY 120 OVER SLOUGH OF TRADWATER RIVER | 1 of 3 | $727,224 | Low, 9.0% under the second |
| 23 MAR 2023 | 23-1016 | District 2 | BRIDGE REPLACEMENT GRAVES LANE (CR 1053) | 1 of 4 | $589,128 | Low, 14% under the second |
| 28 APR 2022 | 22-5238 | District 3 | BRIDGE REPLACEMENT CR 1108 | 2 of 4 | $998,531 | +14% |
| 27 JAN 2022 | 22-5231 | District 2 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 2 | 1 of 4 | $1,368,490 | Low, 15% under the second |
| 24 SEP 2021 | 21-5164 | District 4 | BRIDGE REPLACEMENT SHAW WELL ROAD (CR 1564) | 1 of 5 | $352,960 | Low, 33% under the second |
| 25 JUN 2021 | 21-5205 | District 5 | BRIDGE REPLACEMENT KY 636 (BACK CREEK ROAD) | 2 of 5 | $898,921 | 0.0% |
| 21 MAY 2021 | 21-5191 | District 3 | BRIDGE REPLACEMENT MAX ROARK ROAD OVER PUNCHEON CREEK | 3 of 5 | $354,000 | +7.0% |
| 19 MAR 2021 | 21-5190 | District 3 | BRIDGE SUPERSTRUCTURE REPLACEMENT VARIOUS BRIDGES IN DISTRICT 3 | 1 of 5 | $1,043,749 | Low, 4.0% under the second |
| 20 NOV 2020 | 20-5188 | District 4 | BRIDGE SUPERSTRUCTURE REPLACEMENT WATSON SCHOOL ROAD | 2 of 10 | $178,900 | +1.0% |
| 24 JUL 2020 | 20-5173 | District 7 | BRIDGE REPLACEMENT KY 44 | 1 of 12 | $1,298,889 | Low, 1.0% under the second |
| 24 JUL 2020 | 20-5174 | District 1 | BRIDGE REPLACEMENT COTTON PATCH RIDGE ROAD (CR 1085) | 1 of 7 | $314,432 | Low, 13% under the second |
| 21 FEB 2020 | 20-5168 | District 5 | BRIDGE REPAIRS CR 1128 | 5 of 9 | $510,231 | +12% |
| 22 NOV 2019 | 19-5151 | District 3 | BRIDGE REPLACEMENT VARIOUS BRIDGES IN DISCTRICT 3 | 2 of 2 | $887,594 | +9.0% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.