KYTC letting results, January 27, 2022
82 contracts let by Kentucky Transportation Cabinet on January 27, 2022, $110,320,998 in low bids, a median of 2 bidders per contract. On the 82 with an engineer's estimate, the low bid came in under it 51 times; median low bid -6.0% against the estimate.
- Owner
- Kentucky Transportation Cabinet
- Contracts
- 82
- Low bids, total
- $110,320,998
- Data through
- 22 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 22-1302 | GRADE, DRAIN & SURFACE WITH BRIDGE I-65 AT KY 222 | District 4 | 1 | Scotty'S Contracting & Stone LLC | $37,935,590 | -13% | KYTC | ||
| 22-1004 | ASPHALT PAVEMENT & ROADWAY REHAB I-64 | District 9 | 1 | Mountain Enterprises Inc | $9,511,750 | +7.0% | KYTC | ||
| 22-2005 | WATERBOURNE PAINT STRIPING VARIOUS ROUTES IN DISTRICT 5 | District 5 | 1 | Reynolds-Central Seal A Joint Venture | $8,989,000 | +72% | KYTC | ||
| 22-2158 | ASPHALT PAVEMENT & ROADWAY REHAB CHAVIES - BUCKHORN (KY 28) | District 10 | 1 | Mountain Enterprises Inc | $4,375,275 | +7.0% | KYTC | ||
| 22-1003 | ASPHALT PAVEMENT & ROADWAY REHAB I-75 | District 11 | 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $3,380,465 | +3.0% | KYTC | ||
| 22-2970 | BRIDGE REPAIRS REIDLAND-SUWANEE ROAD (US 62) & DOVER ROAD (KY 453) | District 1 | 3 | Intech Contracting LLC | $2,910,148 | $3,480,168 | +20% | -29% | KYTC |
| 22-2007 | WATERBOURNE PAINT STRIPING VARIOUS ROUTES IN DISTRICT 7 | District 7 | 1 | Reynolds-Central Seal A Joint Venture | $2,635,000 | +5.0% | KYTC | ||
| 22-2011 | WATERBOURNE PAINT STRIPING VARIOUS ROUTES IN DISTRICT 11 | District 11 | 1 | Reynolds-Central Seal A Joint Venture | $2,223,000 | +27% | KYTC | ||
| 22-4300 | THERMOPLASTIC PAVEMENT STRIPING HENRY WATTERSON EXPRESSWAY (I-264) | District 5 | 1 | Reynolds-Central Seal A Joint Venture | $1,990,000 | +93% | KYTC | ||
| 22-2001 | WATERBOURNE PAINT STRIPING VARIOUS ROUTES IN DISTRICT 1 | District 1 | 1 | Reynolds-Central Seal A Joint Venture | $1,760,250 | +27% | KYTC | ||
| 22-2025 | PAVEMENT (WITH ALTERNATES) AA HIGHWAY (KY 9) | District 6 | 4 | Strawser Construction Inc & Subsidiaries | $1,589,531 | $1,724,155 | +8.0% | +3.0% | KYTC |
| 22-5231 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 2 | District 2 | 4 | Cambry Contracting Inc | $1,368,490 | $1,576,989 | +15% | -5.0% | KYTC |
| 22-2151 | PAVEMENT (WITH ALTERNATES) JENKINS - PIKEVILLE ROAD (US 23) | District 12 | 4 | Strawser Construction Inc & Subsidiaries | $1,335,544 | $1,348,239 | +1.0% | 0.0% | KYTC |
| 22-2048 | ASPHALT RESURFACING FRENCHBURG - BANGOR (KY 1274) (OMIT MP 8.757-9.270) | District 10 | 1 | Walker Construction & Materials LLC | $1,296,109 | -6.0% | KYTC | ||
| 22-2122 | ASPHALT RESURFACING CLINTON COUNTY (US 127X & KY 1590) | District 8 | 1 | Gaddie-Shamrock LLC | $1,259,381 | +3.0% | KYTC | ||
| 22-2159 | ASPHALT RESURFACING KY 21 AND US 25 IN MADISON COUNTY | District 7 | 1 | The Allen Company Inc | $1,210,440 | +12% | KYTC | ||
| 22-1305 | ASPHALT SURFACE WITH GRADE & DRAIN KY 2084 (OLD US 41)/KY 812 INTERSECTION | District 2 | 1 | Ragle Inc | $1,063,786 | -19% | KYTC | ||
| 22-2009 | WATERBOURNE PAINT STRIPING VARIOUS ROUTES IN DISTRICTS 9 | District 9 | 1 | Reynolds-Central Seal A Joint Venture | $1,027,500 | +10% | KYTC | ||
| 22-2135 | PAVEMENT (WITH ALTERNATES) US 27 AND US 68 IN BOURBON COUNTY | District 7 | 3 | Hinkle Contracting Company LLC | $925,258 | $973,690 | +5.0% | +11% | KYTC |
| 22-3010 | ASPHALT RESURFACING VARIOUS ROUTES IN HARLAN COUNTY | District 11 | 1 | Mountain Enterprises Inc | $925,109 | +16% | KYTC | ||
| 22-2067 | FLOOD REPAIR FOR FEMA KY 199 & KY 1056 | District 12 | 2 | Hinkle Environmental Services LLC | $889,062 | $973,861 | +10% | -17% | KYTC |
| 22-5230 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 11 | District 11 | 4 | Central Bridge Co LLC | $872,924 | $976,790 | +12% | -46% | KYTC |
| 22-2123 | PAVEMENT (WITH ALTERNATES) US 127 AND KY 1590 IN CLINTON COUNTY | District 8 | 4 | Gaddie-Shamrock LLC | $868,694 | $1,134,998 | +31% | -10% | KYTC |
| 22-2156 | ASPHALT RESURFACING LAGRANGE ROAD (KY 146) | District 5 | 5 | E & B Paving LLC | $746,607 | $811,730 | +9.0% | -15% | KYTC |
| 22-2024 | PAVEMENT (WITH ALTERNATES) CAMPTON - HAZEL GREEN (KY 191) | District 10 | 4 | Hinkle Contracting Company LLC | $708,115 | $819,428 | +16% | -14% | KYTC |
| 22-2150 | PAVEMENT (WITH ALTERNATES) OWINGSVILLE - FRENCHBURG (KY 36) | District 9 | 4 | Walker Construction & Materials LLC | $672,532 | $802,512 | +19% | -21% | KYTC |
| 22-2145 | PAVEMENT (WITH ALTERNATES) LONDON - LIVINGSTON ROAD (US 25) | District 11 | 3 | L-M Asphalt Partners LTD D/B/A Ats Construction | $671,077 | $712,729 | +6.0% | +2.0% | KYTC |
| 22-2160 | ASPHALT RESURFACING WEST MAIN STREET (US 25X) | District 7 | 1 | The Allen Company Inc | $623,876 | +2.0% | KYTC | ||
| 22-2116 | ASPHALT RESURFACING BOONEVILLE - BEATYVILLE (KY 11) | District 10 | 1 | Hinkle Contracting Company LLC | $603,024 | -3.0% | KYTC | ||
| 22-2038 | PAVEMENT (WITH ALTERNATES) CENTRAL RIDGE ROAD (KY 1504) | District 6 | 5 | H G Mays Corporation | $583,157 | $675,564 | +16% | +3.0% | KYTC |
| 22-2146 | PAVEMENT (WITH ALTERNATES) COUNTRY MUSIC HIGHWAY (US 23) | District 9 | 4 | Strawser Construction Inc & Subsidiaries | $567,894 | $587,834 | +4.0% | +1.0% | KYTC |
| 22-3001 | ASPHALT RESURFACING VARIOUS ROUTES IN MADISON COUNTY | District 7 | 1 | The Allen Company Inc | $553,361 | -13% | KYTC | ||
| 22-2152 | PAVEMENT (WITH ALTERNATES) US 27 AND KY 90 IN PULASKI COUNTY | District 8 | 3 | Hinkle Contracting Company LLC | $544,226 | $774,625 | +42% | -7.0% | KYTC |
| 22-2149 | ASPHALT SURFACING ULTRA THIN CANEYVILLE ROAD (KY 79) | District 3 | 1 | Scotty'S Contracting & Stone LLC | $540,789 | -9.0% | KYTC | ||
| 22-2111 | ASPHALT RESURFACING FAIRLANE DRIVE (KY 59) | District 9 | 2 | H G Mays Corporation | $531,541 | $563,419 | +6.0% | -17% | KYTC |
| 22-2155 | JPC PAVEMENT S WALNUT STREET (US 31W HARDIN & LARUE COUNTY) | District 4 | 2 | Louisville Paving Company Inc | $525,000 | $528,905 | +1.0% | +15% | KYTC |
| 22-2121 | ASPHALT RESURFACING JOHN HARPER HIGHWAY (KY 1526) | District 5 | 5 | Hall Contracting of Kentucky Inc & Subsidiary | $515,000 | $585,320 | +14% | -27% | KYTC |
| 22-2021 | PAVEMENT (WITH ALTERNATES) SOUTHEASTERN BYPASS (KY 914) | District 8 | 3 | Hinkle Contracting Company LLC | $450,243 | $500,888 | +11% | -3.0% | KYTC |
| 22-2030 | PAVEMENT (WITH ALTERNATES) SHROUD TO SOUTH CARROLLTON ROAD (US 431) | District 2 | 2 | Scotty'S Contracting & Stone LLC | $445,199 | $535,510 | +20% | -5.0% | KYTC |
| 22-2106 | ASPHALT RESURFACING FAIRVIEW AVENUE (KY 234) | District 3 | 1 | Scotty'S Contracting & Stone LLC | $426,409 | -11% | KYTC | ||
| 22-1304 | ASPHALT REHAB INTERSTATE/PARKWAY I-275 | District 6 | 2 | Eaton Asphalt Paving Co Inc and Subsidiary | $395,726 | $450,607 | +14% | +3.0% | KYTC |
| 22-2901 | BRIDGE SUPERSTRUCTURE REPLACEMENT WOLFE COUNTY SUPERSTRUCTURE REPLACEMENTS. | District 10 | 7 | Landmark Construction LLC | $394,754 | $401,454 | +2.0% | -36% | KYTC |
| 22-2014 | PAVEMENT (WITH ALTERNATES) MANCHESTER - HYDEN ROAD (US 421) | District 11 | 3 | L-M Asphalt Partners LTD D/B/A Ats Construction | $389,684 | $462,111 | +19% | -5.0% | KYTC |
| 22-2157 | PAVEMENT (WITH ALTERNATES) ELK MOUNTAIN ROAD (KY 873) | District 11 | 3 | L-M Asphalt Partners LTD D/B/A Ats Construction | $385,554 | $391,214 | +1.0% | -5.0% | KYTC |
| 22-2107 | ASPHALT RESURFACING US 68 (METCALFE COUNTY) | District 3 | 1 | Scotty'S Contracting & Stone LLC | $384,637 | -10% | KYTC | ||
| 22-2105 | PAVEMENT (WITH ALTERNATES) MURRAY HIGHWAY (US 641) | District 1 | 3 | Jim Smith Contracting Company LLC & Subsidiary | $367,418 | $474,522 | +29% | +11% | KYTC |
| 22-2093 | ASPHALT RESURFACING OHIO RIVER ROAD (KY 3116) | District 9 | 2 | Mountain Enterprises Inc | $361,754 | $402,222 | +11% | -7.0% | KYTC |
| 22-2029 | PAVEMENT (WITH ALTERNATES) MARION ROAD (KY 91) | District 2 | 4 | Rogers Group Inc | $359,188 | $426,853 | +19% | 0.0% | KYTC |
| 22-2153 | ASPHALT RESURFACING SANDY HOOK - LOUISA (KY 32) | District 9 | 2 of 3 | Mountain Enterprises Inc | $358,899 | $367,494 | +2.0% | -12% | KYTC |
| 22-2026 | PAVEMENT (WITH ALTERNATES) WILLIAMSBURG ROAD (KY 92) | District 8 | 3 | Hinkle Contracting Company LLC | $332,102 | $428,290 | +29% | -19% | KYTC |
| 22-2120 | ASPHALT RESURFACING CHARLES HAMILTON WAY (KY 480) | District 5 | 5 | Louisville Paving Company Inc | $320,150 | $321,000 | 0.0% | -26% | KYTC |
| 22-2113 | ASPHALT RESURFACING IRVINE - BEATYVILLE (KY 52) | District 10 | 1 | Hinkle Contracting Company LLC | $317,596 | -7.0% | KYTC | ||
| 22-5153 | BRIDGE REPAIRS KY 1040 | District 11 | 2 | Irvine Contracting LLC | $316,425 | $357,976 | +13% | +48% | KYTC |
| 22-2104 | ASPHALT RESURFACING ELBA - GLOVERS ROAD (KY 593) | District 2 | 2 | Yager Materials Corp | $306,697 | $329,314 | +7.0% | -25% | KYTC |
| 22-2109 | ASPHALT RESURFACING EAST CEDAR STREET/RAPIDS ROAD (KY 73) | District 3 | 1 | Scotty'S Contracting & Stone LLC | $302,528 | -13% | KYTC | ||
| 22-2016 | PAVEMENT (WITH ALTERNATES) TATES CREEK ROAD (KY 1974) | District 7 | 3 | Lexington Quarry Company | $298,247 | $343,566 | +15% | -9.0% | KYTC |
| 22-4412 | GRADE & DRAIN WITH ASPHALT SURFACE VARIOUS ROUTES IN HARDIN COUNTY | District 4 | 2 | Scotty'S Contracting & Stone LLC | $292,108 | $537,000 | +84% | -28% | KYTC |
| 22-2131 | PAVEMENT (WITH ALTERNATES) GEORGETOWN ROAD (US 25) | District 7 | 4 | L-M Asphalt Partners LTD D/B/A Ats Construction | $284,000 | $322,446 | +14% | -2.0% | KYTC |
| 22-2103 | ASPHALT RESURFACING FRAKES ROAD (KY 190) | District 11 | 1 | Hinkle Contracting Company LLC | $256,622 | +11% | KYTC | ||
| 22-2040 | PAVEMENT (WITH ALTERNATES) JACKSONVILLE TO BROADWELL ROAD (KY 353) | District 6 | 3 | Hinkle Contracting Company LLC | $249,581 | $292,978 | +17% | 0.0% | KYTC |
| 22-2110 | PAVEMENT (WITH ALTERNATES) GLENCOE SPARTA ROAD (KY 467) | District 6 | 4 | Hinkle Contracting Company LLC | $246,132 | $280,570 | +14% | -20% | KYTC |
| 22-2130 | PAVEMENT (WITH ALTERNATES) MUD CREEK (KY 979) | District 12 | 3 | Mountain Enterprises Inc | $241,902 | $294,687 | +22% | -6.0% | KYTC |
| 22-2092 | FLOOD REPAIR FOR FEMA KY 611 & KY 1384 | District 12 | 2 | Hinkle Environmental Services LLC | $240,559 | $247,733 | +3.0% | -14% | KYTC |
| 22-2162 | ASPHALT RESURFACING LAGRANGE ROAD (KY 146) | District 5 | 5 | Louisville Paving Company Inc | $230,296 | $245,000 | +6.0% | -20% | KYTC |
| 22-2115 | ASPHALT RESURFACING IRVINE ROAD (KY 82) | District 10 | 2 | Walker Construction & Materials LLC | $224,936 | $228,099 | +1.0% | -33% | KYTC |
| 22-2101 | ASPHALT RESURFACING SONORA HARDIN SPRINGS RD (KY 84) | District 4 | 2 | Scotty'S Contracting & Stone LLC | $224,447 | $307,853 | +37% | -13% | KYTC |
| 22-2047 | ASPHALT RESURFACING LOCUST PIKE (KY 1930) | District 6 | 2 | Riegler Blacktop Inc | $208,893 | $209,022 | 0.0% | -6.0% | KYTC |
| 22-2023 | PAVEMENT (WITH ALTERNATES) OAK HILL ROAD (KY 1577) | District 8 | 3 | Hinkle Contracting Company LLC | $205,742 | $268,329 | +30% | -6.0% | KYTC |
| 22-2028 | PAVEMENT (WITH ALTERNATES) CANTON PIKE (KY 272) | District 2 | 3 | Rogers Group Inc | $186,676 | $253,747 | +36% | -5.0% | KYTC |
| 22-2018 | PAVEMENT (WITH ALTERNATES) HENDRICKS - SALYERSVILLE (KY 30) | District 10 | 4 | Hinkle Contracting Company LLC | $186,366 | $193,034 | +4.0% | -14% | KYTC |
| 22-2039 | FLOOD REPAIR FOR FEMA BRUSHY CREEK ROAD (KY 881) | District 12 | 2 | Hinkle Environmental Services LLC | $186,191 | $191,595 | +3.0% | -16% | KYTC |
| 22-2044 | ASPHALT RESURFACING KY 801 IN FLEMING COUNTY (FD05 & FE01) | District 9 | 2 | H G Mays Corporation | $167,653 | $198,204 | +18% | -34% | KYTC |
| 22-2161 | ASPHALT RESURFACING STONE MOUNTAIN ROAD (KY 3099) | District 11 | 1 | Mountain Enterprises Inc | $156,589 | +8.0% | KYTC | ||
| 22-2117 | ASPHALT RESURFACING SPOUT SPRINGS ROAD (KY 82) | District 10 | 1 | Hinkle Contracting Company LLC | $154,501 | -9.0% | KYTC | ||
| 22-2017 | PAVEMENT (WITH ALTERNATES) ROYALTON - SALYERSVILLE (KY 7) | District 10 | 4 | Mountain Enterprises Inc | $144,028 | $147,265 | +2.0% | -11% | KYTC |
| 22-2027 | PAVEMENT (WITH ALTERNATES) NORTH JEFFERSON STREET (KY 293) | District 2 | 2 | Rogers Group Inc | $121,052 | $226,996 | +88% | -20% | KYTC |
| 22-4411 | GRADE & DRAIN BEWLEY HOLLOW ROAD (CR 1100) | District 4 | 3 | Scott and Murphy Inc | $119,766 | $134,309 | +12% | +4.0% | KYTC |
| 22-2118 | ASPHALT RESURFACING JEFFERSON-HIGHLAND AVENUE | District 10 | 1 | Hinkle Contracting Company LLC | $81,176 | -2.0% | KYTC | ||
| 22-2013 | ASPHALT RESURFACING GLENN AVE (KY 2494) | District 10 | 1 | Hinkle Contracting Company LLC | $80,687 | +1.0% | KYTC | ||
| 22-2112 | GUARDRAIL SUGAR CREEK PIKE (KY 1267) | District 7 | 1 | George B Stone Co LLC | $74,312 | +4.0% | KYTC | ||
| 22-2015 | GUARDRAIL DAVIS BROWN ROAD (KY 1107) | District 12 | 1 | George B Stone Co LLC | $65,382 | +5.0% | KYTC | ||
| 22-2102 | GUARDRAIL JABEZ - NANCY ROAD (KY 196) | District 8 | 1 | George B Stone Co LLC | $49,692 | -10% | KYTC |
Gap is the second bid over the low bid. Where a contract shows fewer bids than KYTC received, the others did not match their published totals and are left out.