Jim Smith Contracting Company LLC & Subsidiary: KYTC bid record

Jim Smith Contracting Company LLC & Subsidiary submitted 59 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 24 MAR 2022, and was the low bidder on 49 of them (83%). When it was not low, its total sat a median +19% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$150,285,560
Latest bid
24 MAR 2022
Data through
22 OCT 2026
59Bids
49Low bids
83Win rate, percent
+19%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
201966100%
2020221673%
2021272385%
202244100%
Jim Smith Contracting Company LLC & Subsidiary, KYTC: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Portable changeable message signEACH1613 (81%)$573.49$1,750.00
Temporary signsSF1611 (69%)$0.50$6.50
Steel reinforcementLB1611 (69%)$1.00$1.85
Armored edge for concreteLF1411 (79%)$57.05$120.00
Cyclopean stone rip rapTON1311 (85%)$29.93$60.00
Pave striping-temp paint-4 inLF1010 (100%)$0.23$0.20
Delineator for guardrail BI directional whiteEACH1010 (100%)$7.02$14.19
Pave striping-perm paint-4 inLF99 (100%)$0.35$0.29
Guardrail-steel W beam-S faceLF99 (100%)$26.79$38.00
Steel reinforcement-epoxy coatedLB148 (57%)$1.35$2.00
Pave marking-thermo stop bar-24INLF98 (89%)$20.00$14.00
Granular embankmentCY98 (89%)$45.11$85.00
Jim Smith Contracting Company LLC & Subsidiary, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
American Pavements Inc70 of 7
Harold Coffey Construction Co Inc Wos Coffey Holding Co Inc72 of 7
Strawser Construction Inc & Subsidiaries60 of 6
Ragle Inc51 of 5
Murray Paving Inc43 of 4
Microsurfacing Contractors LLC30 of 3
Scott and Murphy Inc32 of 3
Rogers Group Inc31 of 3
Missouri Petroleum Products Company LLC20 of 2
Adams Contracting LLC21 of 2
Jim Smith Contracting Company LLC & Subsidiary, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
24 MAR 202222-2059District 1ASPHALT RESURFACING KEY BOTTOM ROAD (KY 1276)1 of 1$372,612Low
24 MAR 202222-2195District 1ASPHALT RESURFACING MARSHALL COUNTY (US 641, US 641S, & KY 58)1 of 1$1,587,203Low
24 FEB 202222-2058District 1ASPHALT RESURFACING SYMSONIA TO BENTON ROAD (KY 348)1 of 1$203,292Low
27 JAN 202222-2105District 1PAVEMENT (WITH ALTERNATES) MURRAY HIGHWAY (US 641)1 of 3$367,418Low, 29% under the second
10 DEC 202121-2492District 1PAVEMENT (WITH ALTERNATES) HOLIFIELD TO WINGO ROAD (KY 339)1 of 3$225,288Low, 50% under the second
10 DEC 202121-2491District 1PAVEMENT (WITH ALTERNATES) BENTON TO DRAFFENVILLE ROAD (US 641)1 of 3$356,280Low, 38% under the second
19 NOV 202121-1344District 1ASPHALT SURFACING NEW CONSTRUCTION CLARKS RIVER ROAD (US 60)1 of 1$897,901Low
19 NOV 202121-2456District 1PAVEMENT (WITH ALTERNATES) PENNY TO FAXON ROAD (KY 80)1 of 3$675,535Low, 32% under the second
24 SEP 202121-2374District 1ASPHALT RESURFACING VAN CLEAVE TO AURORA ROAD (KY 80)1 of 1$946,806Low
24 SEP 202121-2190District 1ASPHALT RESURFACING KEVIL TO CONCORD ROAD (US 60)1 of 1$2,838,335Low
24 SEP 202121-2373District 1ASPHALT RESURFACING IVEY ROAD (KY 1558)1 of 1$65,210Low
24 SEP 202121-5210District 1BRIDGE REPLACEMENT HALL CEMETERY ROAD (CR 1380)2 of 4$308,824+11%
23 JUL 202121-5187District 1BRIDGE REPLACEMENT KY 913 of 4$1,234,474+31%
25 JUN 202121-4204District 1ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 62 (US 62)1 of 1$2,085,491Low
25 JUN 202121-2238District 1ASPHALT RESURFACING MCCRACKEN COUNTY (US 45X & US 60X)1 of 1$1,697,493Low
25 JUN 202121-2235District 1ASPHALT RESURFACING KENTUCKY LAKE ROAD (US 641)1 of 1$751,120Low
25 JUN 202121-2241District 1ASPHALT RESURFACING MURRAY TO BENTON ROAD (US 641S)1 of 1$606,663Low
25 JUN 202121-3095District 1ASPHALT RESURFACING VARIOUS ROUTES IN MARSHALL COUNTY1 of 1$770,881Low
21 MAY 202121-5105District 1BRIDGE REPLACEMENT KY 80 OVER BOWLES CREEK2 of 3$657,440+20%
23 APR 202121-1014District 1GRADE & DRAIN WITH ASPHALT SURFACE KY-7871 of 2$190,981Low, 30% under the second
23 APR 202121-4202District 1ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 62 (US 62)1 of 1$2,168,326Low
23 APR 202121-2171District 1ASPHALT RESURFACING CUBA ROAD (KY 303)1 of 1$980,676Low
23 APR 202121-2175District 1ASPHALT RESURFACING LAKE CITY TO SUWANEE (US 62)1 of 1$416,549Low
19 MAR 202121-1011District 1GRADE, DRAIN & SURFACE WITH BRIDGE PADUCAH-TENNESSEE STATE LINE ROAD(I-24)1 of 1$990,028Low
19 MAR 202121-5196District 1BRIDGE REPLACEMENT KY 12901 of 3$977,219Low, 8.0% under the second
Jim Smith Contracting Company LLC & Subsidiary: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy