Ragle Inc: KYTC bid record
Ragle Inc submitted 34 bids on Kentucky Transportation Cabinet contracts in the data, from 21 FEB 2020 to 25 JUN 2026, and was the low bidder on 3 of them (9%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $4,765,335
- Latest bid
- 25 JUN 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 0 | 0% |
| 2021 | 13 | 1 | 8% |
| 2022 | 5 | 1 | 20% |
| 2023 | 1 | 0 | 0% |
| 2024 | 3 | 0 | 0% |
| 2025 | 4 | 1 | 25% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 16 | 2 | 13% |
| District 1 | 7 | 0 | 0% |
| District 4 | 4 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pave striping-perm paint-4 in | LF | 25 | 18 (72%) | $1.00 | $0.29 | |
| Armored edge for concrete | LF | 27 | 12 (44%) | $150.00 | $120.00 | |
| Concrete sealing | SF | 13 | 10 (77%) | $1.00 | $3.00 | |
| Guardrail-steel W beam-S face | LF | 14 | 9 (64%) | $39.30 | $38.00 | |
| Bridge overlay approach pavement | SY | 20 | 8 (40%) | $50.00 | $65.00 | |
| Test piles | LF | 11 | 8 (73%) | $90.00 | $187.47 | |
| Delineator for guardrail BI directional white | EACH | 9 | 8 (89%) | $9.74 | $14.19 | |
| Edge key | LF | 9 | 8 (89%) | $25.00 | $47.55 | |
| Rem epoxy bit foreign overlay | SY | 9 | 8 (89%) | $12.00 | $30.00 | |
| Remove concrete masonry | CY | 8 | 8 (100%) | $400.00 | $750.00 | |
| Guardrail terminal section no 1 | EACH | 10 | 7 (70%) | $70.03 | $85.06 | |
| Guardrail end treatment type 1 | EACH | 9 | 7 (78%) | $3,739.61 | $3,800.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scott and Murphy Inc | 15 | 12 of 15 |
| Galusha Contracting LLC | 9 | 7 of 9 |
| M & M Services Co Inc | 9 | 6 of 9 |
| American Contracting & Services Inc | 8 | 3 of 8 |
| Cambry Contracting Inc | 6 | 6 of 6 |
| Jim Smith Contracting Company LLC & Subsidiary | 5 | 4 of 5 |
| Louisville Paving Company Inc | 5 | 4 of 5 |
| Intech Contracting LLC | 5 | 5 of 5 |
| Jave LLC | 4 | 2 of 4 |
| Scotty'S Contracting & Stone LLC | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 JUN 2026 | 26-4516 | SIGNS VARIOUS ROUTES IN DISTRICT 2 | 5 of 5 | $531,527 | +90% | |
| 25 JUN 2026 | 26-4525 | SIGNS VARIOUS ROUTES IN DISTRICT 2 | 4 of 5 | $372,340 | +45% | |
| 11 DEC 2025 | 25-1039 | BRIDGE WITH GRADE, DRAIN & SURFACE KY 115 STRUCTURE OVER I-24 | 2 of 4 | $3,748,123 | +5.0% | |
| 11 DEC 2025 | 25-5400 | BRIDGE REPLACEMENT KY 1046 | 5 of 7 | $961,192 | +18% | |
| 20 NOV 2025 | 25-1035 | GRADE & DRAIN WITH ASPHALT SURFACE FAIRVIEW DRIVE (KY298) / FOORS LANE (KY3143) | 1 of 2 | $3,215,724 | Low, 5.0% under the second | |
| 24 JUL 2025 | 25-5382 | BRIDGE REPLACEMENT KY 138 | 3 of 4 | $7,379,967 | +11% | |
| 12 DEC 2024 | 24-5369 | District 2 | BRIDGE REPLACEMENT US 60 | 3 of 3 | $3,079,614 | +21% |
| 12 DEC 2024 | 24-1017 | District 2 | BRIDGE REPLACEMENT KY-1033 | 3 of 5 | $1,435,670 | +24% |
| 26 SEP 2024 | 24-5361 | District 2 | BRIDGE REPLACEMENT KY 812 | 3 of 3 | $1,873,746 | +37% |
| 22 JUN 2023 | 23-1032 | District 2 | GRADE & DRAIN WITH ASPHALT SURFACE KY-54 | 3 of 3 | $24,742,649 | +6.0% |
| 08 DEC 2022 | 22-1064 | District 2 | GRADE & DRAIN WITH ASPHALT SURFACE KY-54 | 2 of 2 | $24,727,497 | +10% |
| 28 APR 2022 | 22-2963 | District 1 | BRIDGE DECK RESTORATION & WATERPROOFING TOLU-CASAD ROAD (KY 135) & MARION-PINEY FORK ROAD (KY 506) | 5 of 5 | $399,963 | +50% |
| 28 APR 2022 | 22-2961 | District 2 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN DAVIESS COUNTY | 4 of 4 | $1,312,072 | +47% |
| 27 JAN 2022 | 22-1305 | District 2 | ASPHALT SURFACE WITH GRADE & DRAIN KY 2084 (OLD US 41)/KY 812 INTERSECTION | 1 of 1 | $1,063,786 | Low |
| 27 JAN 2022 | 22-5231 | District 2 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 2 | 2 of 4 | $1,576,989 | +15% |
| 10 DEC 2021 | 21-3206 | District 2 | CULVERT REPLACEMENT REPLACE TWO CULVERTS ON KY 1414 IN OHIO COUNTY | 3 of 3 | $1,057,551 | +32% |
| 22 OCT 2021 | 21-5212 | District 2 | BRIDGE REPLACEMENT WALNUT STREET - US 41 ALT | 3 of 4 | $2,588,139 | +14% |
| 24 SEP 2021 | 21-5164 | District 4 | BRIDGE REPLACEMENT SHAW WELL ROAD (CR 1564) | 5 of 5 | $674,932 | +91% |
| 24 SEP 2021 | 21-5210 | District 1 | BRIDGE REPLACEMENT HALL CEMETERY ROAD (CR 1380) | 3 of 4 | $329,727 | +18% |
| 24 SEP 2021 | 21-2609 | District 5 | BRIDGE REPAIRS I-265 SB RAMP (MP 32.528). | 3 of 5 | $669,537 | +12% |
| 23 JUL 2021 | 21-1032 | District 2 | GRADE, DRAIN & SURFACE WITH BRIDGE DIXIE ROAD(US-41A) | 2 of 2 | $24,244,610 | +46% |
| 23 JUL 2021 | 21-5187 | District 1 | BRIDGE REPLACEMENT KY 91 | 4 of 4 | $1,305,888 | +39% |
| 23 JUL 2021 | 21-2967 | District 1 | BRIDGE DECK RESTORATION & WATERPROOFING KY 121 CALLOWAY COUNTY & KY 135 LIVINGSTON COUNTY | 3 of 5 | $539,210 | +4.0% |
| 21 MAY 2021 | 21-2602 | District 4 | BRIDGE DECK RESTORATION & WATERPROOFING BRIDGE REPAIRS - DISTRICT 4. | 6 of 6 | $2,652,146 | +67% |
| 23 APR 2021 | 21-2177 | District 2 | SLIDE REPAIR CASNER ROAD (KY 862) | 1 of 2 | $485,825 | Low, 19% under the second |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.