American Contracting & Services Inc: KYTC bid record
American Contracting & Services Inc submitted 82 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 23 JUL 2026, and was the low bidder on 3 of them (4%). When it was not low, its total sat a median +41% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $34,234,054
- Latest bid
- 23 JUL 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 4 | 0 | 0% |
| 2020 | 12 | 0 | 0% |
| 2021 | 16 | 0 | 0% |
| 2022 | 13 | 0 | 0% |
| 2023 | 9 | 0 | 0% |
| 2024 | 10 | 1 | 10% |
| 2025 | 15 | 2 | 13% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 12 | 2 | 17% |
| District 1 | 10 | 0 | 0% |
| District 5 | 9 | 0 | 0% |
| District 4 | 8 | 0 | 0% |
| District 10 | 5 | 0 | 0% |
| District 8 | 5 | 0 | 0% |
| District 7 | 5 | 0 | 0% |
| District 6 | 4 | 0 | 0% |
| District 9 | 3 | 0 | 0% |
| District 3 | 3 | 0 | 0% |
| District 11 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Partial depth patching | CY | 97 | 57 (59%) | $1,100.00 | $1,400.00 | |
| Armored edge for concrete | LF | 108 | 43 (40%) | $250.00 | $120.00 | |
| Blast cleaning | SY | 96 | 28 (29%) | $8.00 | $10.00 | |
| Pave striping-perm paint-4 in | LF | 88 | 27 (31%) | $2.00 | $0.29 | |
| Epoxy sand slurry | SY | 96 | 23 (24%) | $25.00 | $30.00 | |
| Steel reinforcement | LB | 93 | 20 (22%) | $2.00 | $1.85 | |
| Steel repair | EACH A A | 41 | 19 (46%) | $3,000.00 | $6,500.00 | |
| Relocate temp conc barrier | LF | 23 | 9 (39%) | $5.00 | $10.00 | |
| Guardrail terminal section no 1 | EACH | 10 | 9 (90%) | $51.35 | $85.06 | |
| Lane closure | EACH | 89 | 8 (9%) | $2,500.00 | $2,500.00 | |
| Conc class M full depth patch | CY | 85 | 8 (9%) | $2,000.00 | $1,200.00 | |
| Concrete patching repair | SQFT A A | 17 | 8 (47%) | $300.00 | $350.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & M Services Co Inc | 60 | 50 of 60 |
| Intech Contracting LLC | 59 | 48 of 59 |
| Delong Concrete LLC | 48 | 41 of 48 |
| Louisville Paving Company Inc | 13 | 11 of 13 |
| Bush & Burchett Inc | 11 | 4 of 11 |
| Harper Construction LLC | 9 | 9 of 9 |
| Scott and Murphy Inc | 8 | 6 of 8 |
| Ragle Inc | 8 | 5 of 8 |
| E & B Paving LLC | 7 | 4 of 7 |
| Mac Construction & Excavating Inc | 5 | 4 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 JUL 2026 | 26-2905 | BRIDGE REPAIRS US 31W (S DIXIE HIGHWAY) | 3 of 4 | $1,263,258 | +92% | |
| 23 APR 2026 | 26-5412 | BRIDGE REPAIRS KY 56 | 2 of 5 | $548,268 | +8.0% | |
| 26 MAR 2026 | 26-2944 | BRIDGE REPAIRS I-64 RIVERSIDE EXPRESSWAY | 2 of 5 | $9,049,140 | +3.0% | |
| 11 DEC 2025 | 25-1039 | BRIDGE WITH GRADE, DRAIN & SURFACE KY 115 STRUCTURE OVER I-24 | 4 of 4 | $3,810,498 | +7.0% | |
| 20 NOV 2025 | 25-2904 | BRIDGE SUPERSTRUCTURE REPLACEMENT CR 1339 (WEST FIFTH STREET) | 3 of 4 | $1,502,470 | +51% | |
| 23 OCT 2025 | 25-2964 | BRIDGE DECK RESTORATION & WATERPROOFING CAPITAL AVENUE (US 60) | 2 of 4 | $1,301,521 | +41% | |
| 23 OCT 2025 | 25-2965 | BRIDGE DECK RESTORATION & WATERPROOFING EAST MADISON STREET (KY 3) | 4 of 6 | $2,043,495 | +54% | |
| 25 SEP 2025 | 25-2979 | BRIDGE REPAIR MISCELLANEOUS WORK ROBERT H. FOGLESONG BRIDGE OVER TUG FORK AND NS RR (US 119) | 5 of 7 | $3,561,186 | +39% | |
| 25 SEP 2025 | 25-2989 | BRIDGE REPAIR MISCELLANEOUS WORK SIMON KENTON BRIDGE OVER OHIO RIVER (US 62) | 4 of 4 | $33,039,736 | +46% | |
| 24 JUL 2025 | 25-2900 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN CASEY COUNTY ~ 2 LOCATIONS | 4 of 4 | $628,712 | +68% | |
| 05 JUN 2025 | 25-5381 | BRIDGE DECK RESTORATION & WATERPROOFING I-75 OVER DAVID FORK OF ELKHORN CREEK | 3 of 4 | $2,612,787 | +77% | |
| 05 JUN 2025 | 25-2987 | BRIDGE SUPERSTRUCTURE REPLACEMENT BELLS MILL ROAD (KY 1526) | 2 of 4 | $2,599,853 | 0.0% | |
| 22 MAY 2025 | 25-2974 | BRIDGE REPAIR MISCELLANEOUS WORK I-65 RAMP (I-65) | 1 of 2 | $1,984,604 | Low, 41% under the second | |
| 22 MAY 2025 | 25-2975 | BRIDGE REPAIRS EXPANSION JOINTS LOUISVILLE-STATE LINE ROAD (I-65) | 2 of 4 | $1,407,932 | +81% | |
| 20 MAR 2025 | 25-2963 | District 2 | BRIDGE DECK RESTORATION & WATERPROOFING US 41 ALT AND KY 107 ~ 2 BRIDGES | 2 of 3 | $710,163 | +42% |
| 20 MAR 2025 | 25-2922 | District 9 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN ROWAN COUNTY - 2 LOCATIONS | 4 of 4 | $1,100,651 | +80% |
| 20 FEB 2025 | 25-2962 | District 7 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN BOYLE AND GARRARD COUNTIES ~ 3 LOCATIONS | 4 of 4 | $757,471 | +59% |
| 23 JAN 2025 | 25-2945 | District 2 | BRIDGE REPAIR MISCELLANEOUS WORK GLOVE CARY BRIDGE (KY 2262) | 1 of 1 | $17,913,587 | Low |
| 14 NOV 2024 | 24-2954 | District 5 | BRIDGE DECK RESTORATION & WATERPROOFING PRESTON HIGHWAY (KY 61) | 3 of 5 | $2,168,439 | +36% |
| 24 OCT 2024 | 24-2958 | District 4 | BRIDGE SUPERSTRUCTURE REPLACEMENT BOSTON ROAD (KY 62) | 8 of 8 | $629,655 | +38% |
| 24 OCT 2024 | 24-2957 | District 4 | BRIDGE REPAIRS BRANDENBURG ROAD (KY 259) | 3 of 7 | $1,588,671 | +12% |
| 24 OCT 2024 | 24-2962 | District 3 | BRIDGE REPLACEMENT BEE SPRINGS ROAD (KY 238) | 5 of 5 | $795,494 | +23% |
| 24 OCT 2024 | 24-2997 | District 6 | BRIDGE DECK RESTORATION & WATERPROOFING MARY INGLES HIGHWAY (KY 8) AND SANTA FE ROAD (KY 539) | 4 of 5 | $876,032 | +117% |
| 18 JUL 2024 | 24-2900 | District 8 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN DISTRICT 8 ~ 2 LOCATIONS | 4 of 4 | $493,568 | +65% |
| 18 JUL 2024 | 24-2991 | District 2 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN DISTRICT 2 ~ 3 LOCATIONS | 3 of 4 | $1,120,594 | +61% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.