Delong Concrete LLC: KYTC bid record

Delong Concrete LLC submitted 59 bids on Kentucky Transportation Cabinet contracts in the data, from 22 NOV 2019 to 23 OCT 2025, and was the low bidder on 24 of them (41%). When it was not low, its total sat a median +13% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$19,931,353
Latest bid
23 OCT 2025
Data through
22 OCT 2026
59Bids
24Low bids
41Win rate, percent
+13%Median gap to the low bid when not low, 34 bids

By year

YearBidsLow bidsWin rate
2019100%
2020400%
202113538%
20228225%
202313754%
202410550%
202510550%
Delong Concrete LLC, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 210550%
District 46350%
District 76233%
District 105240%
District 85240%
District 1400%
District 9400%
District 64125%
District 113133%
District 53267%
District 322100%
Delong Concrete LLC, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Concrete overlay-latexCY7327 (37%)$1,850.00$2,200.00
Bridge overlay approach pavementSY6627 (41%)$41.25$65.00
Conc class M full depth patchCY4527 (60%)$1,000.00$1,200.00
Pave striping-perm paint-4 inLF6426 (41%)$1.58$0.29
Pave striping-temp rem tape-BLF3916 (41%)$2.00$2.25
Armored edge for concreteLF7315 (21%)$250.00$120.00
Pave striping-temp rem tape-WLF5112 (24%)$1.50$1.80
Steel repairEACH1912 (63%)$12,800$21,000
Temp signal 2 phaseEACH5011 (22%)$5,500.00$5,500.00
Eliminate transverse jointLF3811 (29%)$480.00$505.00
Deck drain retrofitEACH2711 (41%)$250.00$400.00
Bearing lubricationEACH2311 (48%)$400.00$505.00
Delong Concrete LLC, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Intech Contracting LLC5719 of 57
M & M Services Co Inc5325 of 53
American Contracting & Services Inc487 of 48
Bush & Burchett Inc114 of 11
Harper Construction LLC55 of 5
Louisville Paving Company Inc40 of 4
Triton Construction Inc31 of 3
Judy C Harp Company Inc32 of 3
Southern Road & Bridge LLC20 of 2
Ragle Inc20 of 2
Delong Concrete LLC, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
23 OCT 202525-2964BRIDGE DECK RESTORATION & WATERPROOFING CAPITAL AVENUE (US 60)1 of 4$925,000Low, 41% under the second
23 OCT 202525-2965BRIDGE DECK RESTORATION & WATERPROOFING EAST MADISON STREET (KY 3)1 of 6$1,325,000Low, 0.0% under the second
25 SEP 202525-2979BRIDGE REPAIR MISCELLANEOUS WORK ROBERT H. FOGLESONG BRIDGE OVER TUG FORK AND NS RR (US 119)3 of 7$2,877,971+12%
24 JUL 202525-2900BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN CASEY COUNTY ~ 2 LOCATIONS1 of 4$374,839Low, 8.0% under the second
05 JUN 202525-5381BRIDGE DECK RESTORATION & WATERPROOFING I-75 OVER DAVID FORK OF ELKHORN CREEK2 of 4$1,940,000+31%
22 MAY 202525-2975BRIDGE REPAIRS EXPANSION JOINTS LOUISVILLE-STATE LINE ROAD (I-65)3 of 4$1,750,175+124%
20 MAR 202525-2963District 2BRIDGE DECK RESTORATION & WATERPROOFING US 41 ALT AND KY 107 ~ 2 BRIDGES1 of 3$500,576Low, 42% under the second
20 MAR 202525-2922District 9BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN ROWAN COUNTY - 2 LOCATIONS3 of 4$1,000,000+64%
20 FEB 202525-2962District 7BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN BOYLE AND GARRARD COUNTIES ~ 3 LOCATIONS1 of 4$476,668Low, 10% under the second
23 JAN 202525-2961District 7BRIDGE REPAIRS CARY MILL ROAD (CR 1213)6 of 6$215,000+105%
12 DEC 202424-2945District 7BRIDGE BEARING REPAIR WINCHESTER ROAD (KY 89)1 of 5$90,000Low, 11% under the second
12 DEC 202424-2904District 4BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN HARDIN COUNTY ~ 4 LOCATIONS1 of 4$850,000Low, 18% under the second
12 DEC 202424-2999District 2BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN DISTRICT 2 ~ 3 LOCATIONS2 of 3$750,000+4.0%
14 NOV 202424-2954District 5BRIDGE DECK RESTORATION & WATERPROOFING PRESTON HIGHWAY (KY 61)2 of 5$1,811,111+13%
24 OCT 202424-2997District 6BRIDGE DECK RESTORATION & WATERPROOFING MARY INGLES HIGHWAY (KY 8) AND SANTA FE ROAD (KY 539)2 of 5$554,804+38%
18 JUL 202424-2996District 12BRIDGE REPAIRS EXPANSION JOINTS ULYSSES - INEZ ROAD (KY 645)1 of 4$348,180Low, 19% under the second
18 JUL 202424-2900District 8BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN DISTRICT 8 ~ 2 LOCATIONS1 of 4$300,000Low, 5.0% under the second
18 JUL 202424-2991District 2BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN DISTRICT 2 ~ 3 LOCATIONS1 of 4$694,547Low, 20% under the second
20 JUN 202424-2961District 6BRIDGE STEEL REPAIRS PRESTONVILLE - CARROLLTON ROAD (KY 42)4 of 5$379,854+217%
21 MAR 202424-5341District 11BRIDGE REPAIRS US 1196 of 6$4,065,386+31%
16 NOV 202323-2906District 7BRIDGE REPAIR MISCELLANEOUS WORK VERSAILLES ROAD (US 62)2 of 3$300,000+5.0%
26 OCT 202323-2903District 10BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN DISTRICT 10 - 2 LOCATIONS2 of 4$644,444+5.0%
24 AUG 202323-2989District 5BRIDGE REPAIR MISCELLANEOUS WORK LOUISVILLE-LEXINGTON ROAD (I-64)1 of 2$3,665,073Low, 20% under the second
24 AUG 202323-2968District 11BRIDGE DECK RESTORATION & WATERPROOFING WILLIAMSBURG-CORBIN ROAD (I-75)3 of 5$1,700,000+26%
24 AUG 202323-2902District 4BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN NELSON COUNTY – 3 LOCATIONS1 of 5$600,000Low, 8.0% under the second
Delong Concrete LLC: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy