KYTC contract 25-2964 bid tabulation
BRIDGE DECK RESTORATION & WATERPROOFING CAPITAL AVENUE (US 60). Let by Kentucky Transportation Cabinet on October 23, 2025. 4 bids received; low bid $925,000 by Delong Concrete LLC, -20% against the engineer's estimate of $1,159,287.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 OCT 2025
- Pay items
- 30
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Delong Concrete LLC | $925,000 | Low | -20% |
| 2 | American Contracting & Services Inc | $1,301,521 | +41% | +12% |
| 3 | Intech Contracting LLC | $1,490,126 | +61% | +29% |
| 4 | M & M Services Co Inc | $1,565,887 | +69% | +35% |
Engineer's estimate: $1,159,287.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Delong Concrete LLC | 2. American Contracting & Services Inc | 3. Intech Contracting LLC | 4. M & M Services Co Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Barricade-type III | EACH A A | 8 | $250.00 | $500.00 | $50.00 | $500.00 |
| 0020 | Temporary signs | SQFT A A | 400 | $15.00 | $20.00 | $5.00 | $25.00 |
| 0030 | Maintain & control traffic | LS A A | 1 | $20,000 | $75,000 | $200,000 | $405,000 |
| 0040 | Lane closure | EACH A A | 2 | $12,500 | $6,400.00 | $100.00 | $68,000 |
| 0050 | Portable changeable message sign | EACH A A | 8 | $1,775.00 | $2,500.00 | $2,500.00 | $3,500.00 |
| 0060 | Expan joint replace 1 1/2 in | LF A A | 120 | $950.00 | $1,000.00 | $1,000.00 | $725.00 |
| 0070 | Expan joint replace 4 in | LF A A | 30 | $1,050.00 | $1,400.00 | $1,200.00 | $825.00 |
| 0080 | Armored edge for concrete | LF A A | 30 | $250.00 | $130.00 | $200.00 | $455.00 |
| 0090 | Armored edge for concrete | LF A A | 67.60 | $350.00 | $445.00 | $600.00 | $455.00 |
| 0100 | Repair concrete handrail | LF A A | 51 | $650.00 | $950.00 | $1,000.00 | $550.00 |
| 0110 | Bridge overlay approach pavement | SQYD A A | 106 | $125.00 | $133.00 | $145.00 | $105.00 |
| 0120 | Steel reinforcement | LB A A | 810 | $1.00 | $4.00 | $1.00 | $1.85 |
| 0130 | Epoxy sand slurry | SQYD A A | 1,249 | $35.00 | $35.00 | $32.00 | $47.00 |
| 0140 | Rem epoxy bit foreign overlay | SQYD A A | 2,411 | $37.00 | $45.00 | $90.00 | $17.25 |
| 0150 | Conc class M full depth patch | CUYD A A | 5 | $1,000.00 | $4,000.00 | $4,000.00 | $890.00 |
| 0160 | Concrete overlay-latex | CUYD A A | 100.50 | $1,850.00 | $2,560.00 | $3,000.00 | $1,325.00 |
| 0170 | Blast cleaning | SQYD A A | 3,659 | $12.00 | $12.00 | $14.00 | $15.00 |
| 0180 | Concrete patching repair | SQFT A A | 307 | $275.00 | $400.00 | $300.00 | $255.00 |
| 0190 | Partial depth patching | CUYD A A | 60 | $1,200.00 | $1,100.00 | $1,500.00 | $1,325.00 |
| 0200 | Bridge cleaning | LS A A | 1 | $20,500 | $47,000 | $45,000 | $68,000 |
| 0210 | Concrete coating | LS A A | 1 | $32,500 | $35,000 | $60,000 | $60,000 |
| 0220 | Bearing lubrication | EACH A A | 25 | $450.00 | $5,200.00 | $1,000.00 | $650.00 |
| 0230 | FRP wrap | SQFT A A | 465 | $54.00 | $44.00 | $60.00 | $305.00 |
| 0240 | Pave striping-thermo-6 in W | LF A A | 100 | $8.25 | $7.50 | $8.00 | $20.00 |
| 0250 | Pave marking-thermo stop bar-12IN | LF A A | 24 | $20.00 | $20.00 | $20.00 | $100.00 |
| 0260 | Pave marking-thermo curv arrow | EACH A A | 6 | $175.00 | $175.00 | $175.00 | $1,000.00 |
| 0270 | Pave marking-thermo only | EACH A A | 4 | $375.00 | $375.00 | $375.00 | $1,000.00 |
| 0280 | Durable waterborne marking-6 in W | LF A A | 250 | $3.00 | $3.00 | $3.00 | $12.00 |
| 0290 | Durable waterborne marking-6 in Y | LF A A | 500 | $3.00 | $3.00 | $3.00 | $12.00 |
| 0300 | Demobilization | LS A A | 1 | $14,285 | $19,263 | $22,022 | $26,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.