KYTC contract 25-2900 bid tabulation
BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN CASEY COUNTY ~ 2 LOCATIONS. Let by Kentucky Transportation Cabinet on July 24, 2025. 4 bids received; low bid $374,839 by Delong Concrete LLC, -31% against the engineer's estimate of $544,741.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 44
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Delong Concrete LLC | $374,839 | Low | -31% |
| 2 | M & M Services Co Inc | $405,621 | +8.0% | -26% |
| 3 | Intech Contracting LLC | $616,140 | +64% | +13% |
| 4 | American Contracting & Services Inc | $628,712 | +68% | +15% |
Engineer's estimate: $544,741.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Delong Concrete LLC | 2. M & M Services Co Inc | 3. Intech Contracting LLC | 4. American Contracting & Services Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Barricade-type III | EACH A A | 1 | $200.00 | $250.00 | $500.00 | $500.00 |
| 0020 | Temporary signs | SQFT A A | 93 | $12.00 | $12.00 | $7.00 | $25.00 |
| 0030 | Maintain & control traffic | LS A A | 1 | $12,500 | $14,500 | $25,000 | $15,000 |
| 0040 | Lane closure | EACH A A | 2 | $2,500.00 | $4,500.00 | $1,500.00 | $5,000.00 |
| 0050 | Edgeline rumble strips | LF A A | 400 | $20.00 | $10.00 | $15.00 | $15.00 |
| 0060 | Armored edge for concrete | LF A A | 79.20 | $200.00 | $350.00 | $95.00 | $130.00 |
| 0070 | Eliminate transverse joint | LF A A | 79.20 | $550.00 | $555.00 | $850.00 | $950.00 |
| 0080 | Bridge overlay approach pavement | SQYD A A | 623 | $32.11 | $42.00 | $55.00 | $55.00 |
| 0090 | Temp signal 2 phase | EACH A A | 1 | $5,000.00 | $3,800.00 | $7,500.00 | $6,000.00 |
| 0101 | Pave striping-perm paint-6 in | LF A A | 1,000 | $0.50 | $1.75 | $1.00 | $0.50 |
| 0110 | Pave striping-temp rem tape-B | LF A A | 1,000 | $0.01 | $1.78 | $2.50 | $3.00 |
| 0120 | Pave striping-temp rem tape-W | LF A A | 2,000 | $0.01 | $1.25 | $1.50 | $1.80 |
| 0130 | Pave striping-temp rem tape-Y | LF A A | 2,000 | $0.90 | $1.25 | $0.10 | $1.80 |
| 0132 | Pave striping-dur TY 1-6 in W | LF A A | 200 | $8.50 | $12.00 | $10.00 | $8.00 |
| 0134 | Pave striping-dur TY 1-6 in Y | LF A A | 200 | $8.50 | $12.00 | $10.00 | $8.00 |
| 0140 | Steel reinforcement | LB A A | 1,370 | $2.00 | $2.00 | $1.00 | $2.50 |
| 0150 | Epoxy sand slurry | SQYD A A | 26 | $65.00 | $48.00 | $30.00 | $40.00 |
| 0160 | Conc class M full depth patch | CUYD A A | 2.50 | $200.00 | $950.00 | $1,000.00 | $500.00 |
| 0170 | Concrete overlay-latex | CUYD A A | 12.10 | $2,250.00 | $1,380.00 | $4,000.00 | $4,600.00 |
| 0180 | Blast cleaning | SQYD A A | 315.20 | $14.00 | $11.00 | $15.00 | $10.00 |
| 0190 | Machine prep of slab | SQYD A A | 290 | $34.00 | $16.00 | $35.00 | $55.00 |
| 0200 | Partial depth patching | CUYD A A | 8 | $50.00 | $1,250.00 | $800.00 | $1,200.00 |
| 0210 | Barricade-type III | EACH A A | 1 | $500.00 | $250.00 | $500.00 | $500.00 |
| 0220 | Temporary signs | SQFT A A | 93 | $20.00 | $11.00 | $7.00 | $25.00 |
| 0230 | Maintain & control traffic | LS A A | 1 | $7,500.00 | $12,500 | $50,000 | $15,000 |
| 0240 | Lane closure | EACH A A | 2 | $100.00 | $4,500.00 | $3,000.00 | $5,000.00 |
| 0250 | Expan joint replace 1 1/2 in | LF A A | 48.60 | $650.00 | $585.00 | $1,100.00 | $1,100.00 |
| 0260 | Armored edge for concrete | LF A A | 48.60 | $300.00 | $120.00 | $450.00 | $340.00 |
| 0270 | Bridge overlay approach pavement | SQYD A A | 467 | $44.00 | $42.00 | $55.00 | $55.00 |
| 0280 | Temp signal 2 phase | EACH A A | 1 | $250.00 | $3,800.00 | $7,500.00 | $6,000.00 |
| 0290 | Pave striping-perm paint-6 in | LF A A | 1,000 | $0.50 | $2.00 | $1.00 | $0.80 |
| 0300 | Pave striping-temp rem tape-B | LF A A | 1,000 | $0.01 | $1.85 | $2.00 | $3.00 |
| 0310 | Pave striping-temp rem tape-W | LF A A | 2,000 | $0.01 | $1.25 | $1.50 | $1.80 |
| 0320 | Pave striping-temp rem tape-Y | LF A A | 2,000 | $0.01 | $1.25 | $0.10 | $1.80 |
| 0323 | Pave striping-dur TY 1-6 in W | LF A A | 800 | $8.25 | $12.00 | $6.00 | $8.00 |
| 0325 | Pave striping-dur TY 1-6 in Y | LF A A | 800 | $8.25 | $12.00 | $6.00 | $8.00 |
| 0330 | Steel reinforcement | LB A A | 540 | $2.00 | $1.50 | $1.00 | $2.50 |
| 0340 | Epoxy sand slurry | SQYD A A | 99 | $44.00 | $48.00 | $30.00 | $40.00 |
| 0350 | Conc class M full depth patch | CUYD A A | 9 | $200.00 | $890.00 | $1,750.00 | $500.00 |
| 0360 | Concrete overlay-latex | CUYD A A | 36.10 | $1,950.00 | $1,185.00 | $2,500.00 | $3,500.00 |
| 0370 | Blast cleaning | SQYD A A | 964 | $14.00 | $11.00 | $10.00 | $10.00 |
| 0380 | Machine prep of slab | SQYD A A | 866 | $26.00 | $15.00 | $55.00 | $35.00 |
| 0390 | Partial depth patching | CUYD A A | 22 | $50.00 | $1,185.00 | $1,000.00 | $1,200.00 |
| 0400 | Demobilization | LS A A | 1 | $5,539.49 | $6,100.00 | $9,105.52 | $9,304.93 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.