KYTC contract 25-5381 bid tabulation
BRIDGE DECK RESTORATION & WATERPROOFING I-75 OVER DAVID FORK OF ELKHORN CREEK. Let by Kentucky Transportation Cabinet on June 5, 2025. 4 bids received; low bid $1,477,233 by M & M Services Co Inc, -25% against the engineer's estimate of $1,981,246.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 05 JUN 2025
- Pay items
- 68
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | M & M Services Co Inc | $1,477,233 | Low | -25% |
| 2 | Delong Concrete LLC | $1,940,000 | +31% | -2.0% |
| 3 | American Contracting & Services Inc | $2,612,787 | +77% | +32% |
| 4 | Intech Contracting LLC | $3,260,694 | +121% | +65% |
Engineer's estimate: $1,981,246.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. M & M Services Co Inc | 2. Delong Concrete LLC | 3. American Contracting & Services Inc | 4. Intech Contracting LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 42 | $165.00 | $175.00 | $165.00 | $180.00 |
| 0020 | Drainage blanket-type II-asph | TON A A | 26 | $395.00 | $385.00 | $375.00 | $400.00 |
| 0030 | Asphalt seal aggregate | TON A A | 0.10 | $5,000.00 | $375.00 | $375.00 | $400.00 |
| 0040 | Asphalt seal coat | TON A A | 0.10 | $5,000.00 | $0.01 | $1.00 | $1.00 |
| 0050 | CL3 asph base 1.50D PG64-22 | TON A A | 8 | $375.00 | $425.00 | $375.00 | $400.00 |
| 0060 | CL4 asph base 1.50D PG64-22 | TON A A | 32 | $380.00 | $425.00 | $375.00 | $400.00 |
| 0070 | CL3 asph base 1.00D PG64-22 | TON A A | 8 | $380.00 | $425.00 | $375.00 | $400.00 |
| 0080 | CL4 asph base 1.00D PG64-22 | TON A A | 10 | $385.00 | $425.00 | $375.00 | $400.00 |
| 0090 | CL4 asph base 1.00D PG76-22 | TON A A | 10 | $385.00 | $425.00 | $375.00 | $400.00 |
| 0100 | CL4 asph surf 0.38A PG76-22 | TON A A | 86 | $385.00 | $425.00 | $375.00 | $400.00 |
| 0110 | Asphalt material for tack | TON A A | 1 | $500.00 | $0.01 | $1.00 | $1.00 |
| 0120 | Asphalt curing seal | TON A A | 0.10 | $1,500.00 | $0.01 | $1.00 | $1.00 |
| 0130 | Sand for blotter | TON A A | 0.20 | $1,500.00 | $0.01 | $1.00 | $1.00 |
| 0140 | CL3 asph surf 0.38A PG64-22 | TON A A | 42 | $380.00 | $425.00 | $375.00 | $400.00 |
| 0150 | Asphalt milling and texturing | SQYD A A | 1,520 | $3.00 | $5.00 | $0.01 | $1.00 |
| 0160 | Delineator for barrier - white | EACH A A | 26 | $15.00 | $15.00 | $15.00 | $17.25 |
| 0170 | Delineator for barrier - yellow | EACH A A | 35 | $15.00 | $15.00 | $15.00 | $17.25 |
| 0180 | Relocate temp conc barrier | LF A A | 2,461 | $15.00 | $10.49 | $25.00 | $40.00 |
| 0190 | Guardrail-steel W beam-S face | LF A A | 200 | $45.00 | $65.00 | $55.00 | $63.00 |
| 0200 | Remove guardrail | LF A A | 200 | $15.00 | $5.00 | $3.00 | $3.50 |
| 0210 | Temporary signs | SQFT A A | 685 | $12.00 | $12.00 | $25.00 | $8.00 |
| 0220 | Maintain & control traffic | LS A A | 1 | $55,000 | $250,000 | $345,000 | $650,000 |
| 0230 | Portable changeable message sign | EACH A A | 2 | $2,400.00 | $4,500.00 | $5,500.00 | $4,000.00 |
| 0240 | Mobilization for mill & text | LS A A | 1 | $7,800.00 | $8,500.00 | $7,500.00 | $8,000.00 |
| 0250 | Shoulder rumble strips | LF A A | 200 | $10.00 | $25.00 | $50.00 | $40.00 |
| 0260 | Arrow panel | EACH A A | 2 | $535.00 | $1,000.00 | $3,550.00 | $2,000.00 |
| 0270 | Relocate crash cushion | EACH A A | 4 | $1,800.00 | $3,500.00 | $6,000.00 | $500.00 |
| 0280 | Conc barrier wall type 9T | LF A A | 3,721 | $15.00 | $35.00 | $85.00 | $95.00 |
| 0290 | Pave striping-temp paint-6 in | LF A A | 32,035 | $0.25 | $1.00 | $0.40 | $0.45 |
| 0300 | Pave striping-thermo-6 in W | LF A A | 9,239.80 | $1.15 | $1.46 | $1.45 | $1.70 |
| 0310 | Pave striping-thermo-6 in Y | LF A A | 2,663 | $1.15 | $1.46 | $1.45 | $1.70 |
| 0320 | Pave striping-thermo-8 in W | LF A A | 1,489 | $2.00 | $2.28 | $2.25 | $2.60 |
| 0330 | Pave striping-temp rem tape-W | LF A A | 1,088 | $2.00 | $3.00 | $3.00 | $5.75 |
| 0340 | Pave striping-temp rem tape-Y | LF A A | 408 | $2.00 | $3.00 | $3.00 | $5.75 |
| 0350 | Pave striping-dur TY 1-6 in W | LF A A | 248.20 | $12.00 | $15.50 | $15.00 | $7.50 |
| 0360 | Pave striping-dur TY 1-6 in Y | LF A A | 136 | $12.00 | $15.50 | $15.00 | $7.50 |
| 0370 | Foundation preparation | LS A A | 1 | $18,000 | $120,000 | $120,000 | $45,000 |
| 0380 | Crash cushion TY VI class BT TL2 | EACH A A | 3 | $4,500.00 | $8,000.00 | $13,000 | $20,000 |
| 0390 | Pave mark temp paint line arrow | EACH A A | 54 | $500.00 | $125.00 | $100.00 | $150.00 |
| 0400 | Law enforcement officer | HOUR A A | 200 | $150.00 | $95.00 | $95.00 | $100.00 |
| 0401 | Queue protection vehicle | HOUR A A | 960 | $145.00 | $5.00 | $100.00 | $70.00 |
| 0402 | Furnish queue protection vehicles | MONT A A | 4 | $4,500.00 | $6,880.00 | $13,000 | $5,000.00 |
| 0403 | Portable queue warning alert system | MONT A A | 4 | $1,650.00 | $1,250.00 | $4,500.00 | $5,000.00 |
| 0404 | Queue warning PCMS | MONT A A | 24 | $1,200.00 | $2.00 | $1,500.00 | $800.00 |
| 0405 | Queue warning portable radar sensors | MONT A A | 24 | $550.00 | $4.50 | $800.00 | $1.00 |
| 0406 | Connected arrow panel | MONT A A | 12 | $650.00 | $675.00 | $1,400.00 | $800.00 |
| 0410 | Granular embankment | CUYD A A | 25 | $105.00 | $256.00 | $500.00 | $750.00 |
| 0420 | Clearing and grubbing | LS A A | 1 | $6,500.00 | $8,500.00 | $25,000 | $10,000 |
| 0430 | Staking | LS A A | 1 | $8,500.00 | $7,500.00 | $20,000 | $10,000 |
| 0440 | Armored edge for concrete | LF A A | 552 | $300.00 | $350.00 | $135.00 | $100.00 |
| 0450 | Eliminate transverse joint | LF A A | 270 | $650.00 | $600.00 | $655.00 | $700.00 |
| 0460 | Mechanical reinf coupler #5 | EACH A A | 212 | $120.00 | $46.66 | $70.00 | $150.00 |
| 0470 | Steel reinforcement | LB A A | 100 | $3.00 | $10.00 | $5.00 | $1.00 |
| 0480 | Approach slab | SQYD A A | 381 | $600.00 | $572.00 | $840.00 | $1,900.00 |
| 0490 | Epoxy sand slurry | SQYD A A | 21 | $55.00 | $55.00 | $45.00 | $35.00 |
| 0500 | Concrete overlay-latex | CUYD A A | 20 | $1,650.00 | $5,713.45 | $6,500.00 | $4,000.00 |
| 0510 | Blast cleaning | SQYD A A | 579 | $12.00 | $15.00 | $25.00 | $6.00 |
| 0520 | Hydrodemolition | SQYD A A | 579 | $25.00 | $120.00 | $300.00 | $175.00 |
| 0530 | Concrete patching repair | SQFT A A | 60 | $150.00 | $250.00 | $350.00 | $550.00 |
| 0540 | Concrete sealing | SQFT A A | 9,513 | $3.00 | $1.00 | $3.00 | $8.00 |
| 0550 | Epoxy injection crack repair | LF A A | 120 | $140.00 | $85.00 | $100.00 | $175.00 |
| 0560 | Partial depth patching | CUYD A A | 3 | $1,800.00 | $6,500.00 | $1,500.00 | $1,600.00 |
| 0570 | Utility coordination | LS A A | 1 | $22,000 | $5,000.00 | $5,000.00 | $2,500.00 |
| 0580 | Concrete coating | LS A A | 1 | $13,500 | $80,000 | $40,000 | $50,000 |
| 0590 | Rail system single slope - 40 in | LF A A | 126 | $285.00 | $324.00 | $725.00 | $1,500.00 |
| 0600 | Thrie beam guardrail transition TL-3 | EACH A A | 4 | $6,500.00 | $5,000.00 | $4,000.00 | $7,000.00 |
| 0610 | Mobilization for concrete surf treatment | LS A A | 1 | $4,500.00 | $55,000 | $25,000 | $15,000 |
| 0620 | Demobilization | LS A A | 1 | $22,149 | $30,390 | $38,669 | $48,188 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of June 5, 2025. Compiled by Mirage Metrics.