KYTC contract 25-2962 bid tabulation
BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN BOYLE AND GARRARD COUNTIES ~ 3 LOCATIONS. Let by Kentucky Transportation Cabinet on February 20, 2025, Boyle, Garrard, District 7. 4 bids received; low bid $476,668 by Delong Concrete LLC, -21% against the engineer's estimate of $605,478.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 FEB 2025
- Pay items
- 61
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Delong Concrete LLC | $476,668 | Low | -21% |
| 2 | M & M Services Co Inc | $525,736 | +10% | -13% |
| 3 | Intech Contracting LLC | $685,352 | +44% | +13% |
| 4 | American Contracting & Services Inc | $757,471 | +59% | +25% |
Engineer's estimate: $605,478.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Delong Concrete LLC | 2. M & M Services Co Inc | 3. Intech Contracting LLC | 4. American Contracting & Services Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Remove concrete masonry | CUYD A | 1.30 | $1,000.00 | $4,500.00 | $4,000.00 | $4,000.00 |
| 0020 | Temporary signs | SQFT A | 100 | $15.00 | $10.00 | $5.00 | $20.00 |
| 0030 | Maintain & control traffic | LS A | 1 | $8,500.00 | $7,500.00 | $35,000 | $10,000 |
| 0040 | Lane closure | EACH A | 2 | $3,200.00 | $3,900.00 | $250.00 | $5,000.00 |
| 0050 | Armored edge for concrete | LF A | 68 | $300.00 | $355.00 | $125.00 | $170.00 |
| 0060 | Eliminate transverse joint | LF A | 68 | $500.00 | $550.00 | $515.00 | $560.00 |
| 0070 | Bridge overlay approach pavement | SQYD A | 534 | $42.00 | $49.00 | $58.00 | $50.00 |
| 0080 | Temp signal 2 phase | EACH A | 1 | $7,500.00 | $4,200.00 | $1,500.00 | $6,000.00 |
| 0090 | Pave striping-perm paint-4 in | LF A | 552 | $2.52 | $2.00 | $1.00 | $3.00 |
| 0100 | Pave striping-temp rem tape-B | LF A | 1,000 | $0.05 | $1.80 | $2.00 | $3.00 |
| 0110 | Pave striping-temp rem tape-W | LF A | 2,000 | $0.05 | $1.50 | $1.50 | $1.80 |
| 0120 | Pave striping-temp rem tape-Y | LF A | 2,000 | $0.05 | $1.50 | $0.15 | $1.80 |
| 0130 | Concrete-class A | CUYD A | 1.30 | $3,000.00 | $950.00 | $8,000.00 | $5,000.00 |
| 0140 | Steel reinforcement | LB A | 510 | $5.00 | $1.50 | $1.50 | $3.00 |
| 0150 | Jack & support bridge span | LS A | 1 | $22,500 | $45,000 | $66,900 | $30,000 |
| 0160 | Epoxy sand slurry | SQYD A | 77 | $40.00 | $55.00 | $25.00 | $35.00 |
| 0170 | Rem epoxy bit foreign overlay | SQYD A | 203 | $40.00 | $24.00 | $95.00 | $85.00 |
| 0180 | Conc class M full depth patch | CUYD A | 4 | $350.00 | $850.00 | $2,500.00 | $2,500.00 |
| 0190 | Concrete overlay-latex | CUYD A | 8.40 | $2,500.00 | $1,378.00 | $4,500.00 | $8,300.00 |
| 0200 | Blast cleaning | SQYD A | 280 | $20.00 | $11.00 | $8.00 | $10.00 |
| 0210 | Partial depth patching | CUYD A | 6 | $1,500.00 | $1,390.00 | $1,350.00 | $1,100.00 |
| 0220 | Bridge cleaning | LS A | 1 | $2,000.00 | $9,500.00 | $3,500.00 | $10,000 |
| 0230 | Concrete coating | LS A | 1 | $10,000 | $11,000 | $5,500.00 | $12,000 |
| 0240 | Bearing lubrication | EACH A | 8 | $300.00 | $495.00 | $450.00 | $1,000.00 |
| 0250 | Temporary signs | SQFT A | 100 | $2.50 | $9.00 | $5.00 | $20.00 |
| 0260 | Maintain & control traffic | LS A | 1 | $9,000.00 | $7,800.00 | $20,000 | $10,000 |
| 0270 | Lane closure | EACH A | 2 | $3,425.00 | $4,100.00 | $250.00 | $5,000.00 |
| 0280 | Armored edge for concrete | LF A | 64.50 | $300.00 | $355.00 | $450.00 | $330.00 |
| 0290 | Eliminate transverse joint | LF A | 35.40 | $525.00 | $550.00 | $600.00 | $680.00 |
| 0300 | Bridge overlay approach pavement | SQYD A | 425 | $44.00 | $49.00 | $58.00 | $50.00 |
| 0310 | Temp signal multi phase | EACH A | 1 | $200.00 | $4,100.00 | $1,500.00 | $7,500.00 |
| 0320 | Pave striping-perm paint-4 in | LF A | 472 | $2.52 | $2.00 | $1.00 | $3.00 |
| 0330 | Pave striping-temp rem tape-B | LF A | 1,000 | $0.05 | $1.80 | $2.00 | $3.00 |
| 0340 | Pave striping-temp rem tape-W | LF A | 2,000 | $0.05 | $1.50 | $1.50 | $1.80 |
| 0350 | Pave striping-temp rem tape-Y | LF A | 2,000 | $0.05 | $1.50 | $0.15 | $1.80 |
| 0360 | Steel reinforcement | LB A | 525 | $3.00 | $1.20 | $1.50 | $3.00 |
| 0370 | Epoxy sand slurry | SQYD A | 70 | $40.00 | $55.00 | $25.00 | $35.00 |
| 0380 | Conc class M full depth patch | CUYD A | 1 | $1,000.00 | $950.00 | $3,000.00 | $2,500.00 |
| 0390 | Concrete overlay-latex | CUYD A | 12.30 | $2,250.00 | $1,390.00 | $3,000.00 | $5,700.00 |
| 0400 | Blast cleaning | SQYD A | 364 | $18.00 | $11.00 | $8.00 | $10.00 |
| 0410 | Machine prep of slab | SQYD A | 295 | $22.00 | $18.00 | $75.00 | $65.00 |
| 0420 | Partial depth patching | CUYD A | 10 | $1,250.00 | $1,390.00 | $1,300.00 | $1,100.00 |
| 0430 | Temporary signs | SQFT A | 100 | $2.50 | $9.00 | $5.00 | $20.00 |
| 0440 | Maintain & control traffic | LS A | 1 | $9,000.00 | $7,800.00 | $20,000 | $10,000 |
| 0450 | Lane closure | EACH A | 2 | $3,425.00 | $3,900.00 | $250.00 | $5,000.00 |
| 0460 | Armored edge for concrete | LF A | 80.10 | $300.00 | $355.00 | $450.00 | $330.00 |
| 0470 | Eliminate transverse joint | LF A | 43.60 | $525.00 | $550.00 | $600.00 | $680.00 |
| 0480 | Bridge overlay approach pavement | SQYD A | 425 | $42.00 | $49.00 | $58.00 | $50.00 |
| 0490 | Temp signal multi phase | EACH A | 1 | $200.00 | $4,100.00 | $1,500.00 | $7,500.00 |
| 0500 | Pave striping-perm paint-4 in | LF A | 470 | $2.52 | $2.00 | $1.00 | $3.00 |
| 0510 | Pave striping-temp rem tape-B | LF A | 1,000 | $0.05 | $1.80 | $2.00 | $3.00 |
| 0520 | Pave striping-temp rem tape-W | LF A | 2,000 | $0.05 | $1.50 | $1.50 | $1.80 |
| 0530 | Pave striping-temp rem tape-Y | LF A | 2,000 | $0.05 | $1.50 | $0.15 | $1.80 |
| 0540 | Steel reinforcement | LB A | 525 | $3.00 | $1.50 | $1.50 | $3.00 |
| 0550 | Epoxy sand slurry | SQYD A | 71 | $40.00 | $55.00 | $25.00 | $35.00 |
| 0560 | Conc class M full depth patch | CUYD A | 1 | $1,000.00 | $950.00 | $3,000.00 | $2,500.00 |
| 0570 | Concrete overlay-latex | CUYD A | 12.40 | $2,250.00 | $1,395.00 | $3,200.00 | $5,700.00 |
| 0580 | Blast cleaning | SQYD A | 367 | $18.00 | $11.00 | $8.00 | $10.00 |
| 0590 | Machine prep of slab | SQYD A | 296 | $22.00 | $18.00 | $75.00 | $65.00 |
| 0600 | Partial depth patching | CUYD A | 10 | $1,250.00 | $1,390.00 | $1,300.00 | $1,100.00 |
| 0610 | Demobilization | LS A | 1 | $7,045.00 | $8,350.00 | $10,128 | $11,211 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of February 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.