Harper Construction LLC: KYTC bid record

Harper Construction LLC submitted 15 bids on Kentucky Transportation Cabinet contracts in the data, from 24 JAN 2020 to 24 APR 2025, and was the low bidder on 12 of them (80%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$10,198,949
Latest bid
24 APR 2025
Data through
22 OCT 2026
15Bids
12Low bids
80Win rate, percent
+9.0%Median gap to the low bid when not low, 3 bids

By year

YearBidsLow bidsWin rate
202022100%
20217571%
20225480%
202511100%
Harper Construction LLC, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 1141179%
District 211100%
Harper Construction LLC, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Blast cleaningSY3527 (77%)$6.00$10.00
Pave striping-perm paint-4 inLF3419 (56%)$1.00$0.29
Conc class M full depth patchCY3317 (52%)$630.00$1,200.00
Temporary signsSF3616 (44%)$7.75$6.50
Pave striping-temp rem tape-BLF3116 (52%)$1.83$2.25
Partial depth patchingCY3513 (37%)$1,200.00$1,400.00
Bridge overlay approach pavementSY3512 (34%)$44.00$65.00
Pave striping-temp rem tape-WLF3212 (38%)$0.98$1.80
Temp signal 2 phaseEACH2712 (44%)$3,700.00$5,500.00
Steel reinforcementLB3211 (34%)$1.50$1.85
Armored edge for concreteLF359 (26%)$284.00$120.00
Eliminate transverse jointLF199 (47%)$390.00$505.00
Harper Construction LLC, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Intech Contracting LLC92 of 9
American Contracting & Services Inc90 of 9
M & M Services Co Inc60 of 6
Delong Concrete LLC50 of 5
Harold Coffey Construction Co Inc Wos Coffey Holding Co Inc41 of 4
Ragle Inc30 of 3
Wilkins Construction Company Inc10 of 1
Adams Contracting LLC10 of 1
Hal Coffey Contracting LLC10 of 1
Harper Construction LLC, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
24 APR 202525-1305District 1GRADE, DRAIN & SURFACE WITH BRIDGE 7TH STREET (KY 1099)1 of 2$2,590,017Low, 20% under the second
20 OCT 202222-2960District 1BRIDGE DECK RESTORATION & WATERPROOFING WOODVILLE ROAD (KY 724) - 2 LOCATIONS1 of 5$370,465Low, 11% under the second
20 OCT 202222-2966District 1BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES ~ 4 LOCATIONS1 of 5$950,000Low, 5.0% under the second
28 APR 202222-2963District 1BRIDGE DECK RESTORATION & WATERPROOFING TOLU-CASAD ROAD (KY 135) & MARION-PINEY FORK ROAD (KY 506)1 of 5$266,288Low, 15% under the second
28 APR 202222-2962District 1BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN GRAVES AND HICKMAN COUNTIES1 of 4$782,475Low, 22% under the second
27 JAN 202222-2970District 1BRIDGE REPAIRS REIDLAND-SUWANEE ROAD (US 62) & DOVER ROAD (KY 453)2 of 3$3,480,168+20%
10 DEC 202121-2493District 1JPC PAVEMENT FOURTH STREET (US 641X)1 of 2$325,002Low, 54% under the second
22 OCT 202121-4300District 1ASPHALT SURFACE WITH GRADE & DRAIN IMPROVEMENTS AT VARIOUS INTERSECTIONS IN DISTRICT 11 of 1$384,531Low
24 SEP 202121-4213District 1ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 80 (KY 80)1 of 3$548,855Low, 1.0% under the second
23 JUL 202121-4208District 1ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 80 (KY 80)2 of 3$590,000+2.0%
23 JUL 202121-2967District 1BRIDGE DECK RESTORATION & WATERPROOFING KY 121 CALLOWAY COUNTY & KY 135 LIVINGSTON COUNTY1 of 5$517,742Low, 4.0% under the second
23 APR 202121-2965District 2BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES DISTRICT 21 of 6$940,719Low, 2.0% under the second
19 MAR 202121-2961District 1BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES DISTRICT 12 of 4$1,372,682+9.0%
21 FEB 202020-2940District 1BRIDGE SCOUR MITIGATION BRIDGE SCOUR COUNTERMEASURES - VARIOUS COUNTIES1 of 2$1,067,682Low, 9.0% under the second
24 JAN 202020-2601District 1BRIDGE REPAIRS BRIDGE MAINTENANCE ON I-24 EB AND WB.1 of 4$1,455,174Low, 2.0% under the second
Harper Construction LLC: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy