Harper Construction LLC: KYTC bid record
Harper Construction LLC submitted 15 bids on Kentucky Transportation Cabinet contracts in the data, from 24 JAN 2020 to 24 APR 2025, and was the low bidder on 12 of them (80%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $10,198,949
- Latest bid
- 24 APR 2025
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 2 | 2 | 100% |
| 2021 | 7 | 5 | 71% |
| 2022 | 5 | 4 | 80% |
| 2025 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 14 | 11 | 79% |
| District 2 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Blast cleaning | SY | 35 | 27 (77%) | $6.00 | $10.00 | |
| Pave striping-perm paint-4 in | LF | 34 | 19 (56%) | $1.00 | $0.29 | |
| Conc class M full depth patch | CY | 33 | 17 (52%) | $630.00 | $1,200.00 | |
| Temporary signs | SF | 36 | 16 (44%) | $7.75 | $6.50 | |
| Pave striping-temp rem tape-B | LF | 31 | 16 (52%) | $1.83 | $2.25 | |
| Partial depth patching | CY | 35 | 13 (37%) | $1,200.00 | $1,400.00 | |
| Bridge overlay approach pavement | SY | 35 | 12 (34%) | $44.00 | $65.00 | |
| Pave striping-temp rem tape-W | LF | 32 | 12 (38%) | $0.98 | $1.80 | |
| Temp signal 2 phase | EACH | 27 | 12 (44%) | $3,700.00 | $5,500.00 | |
| Steel reinforcement | LB | 32 | 11 (34%) | $1.50 | $1.85 | |
| Armored edge for concrete | LF | 35 | 9 (26%) | $284.00 | $120.00 | |
| Eliminate transverse joint | LF | 19 | 9 (47%) | $390.00 | $505.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Intech Contracting LLC | 9 | 2 of 9 |
| American Contracting & Services Inc | 9 | 0 of 9 |
| M & M Services Co Inc | 6 | 0 of 6 |
| Delong Concrete LLC | 5 | 0 of 5 |
| Harold Coffey Construction Co Inc Wos Coffey Holding Co Inc | 4 | 1 of 4 |
| Ragle Inc | 3 | 0 of 3 |
| Wilkins Construction Company Inc | 1 | 0 of 1 |
| Adams Contracting LLC | 1 | 0 of 1 |
| Hal Coffey Contracting LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 APR 2025 | 25-1305 | District 1 | GRADE, DRAIN & SURFACE WITH BRIDGE 7TH STREET (KY 1099) | 1 of 2 | $2,590,017 | Low, 20% under the second |
| 20 OCT 2022 | 22-2960 | District 1 | BRIDGE DECK RESTORATION & WATERPROOFING WOODVILLE ROAD (KY 724) - 2 LOCATIONS | 1 of 5 | $370,465 | Low, 11% under the second |
| 20 OCT 2022 | 22-2966 | District 1 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES ~ 4 LOCATIONS | 1 of 5 | $950,000 | Low, 5.0% under the second |
| 28 APR 2022 | 22-2963 | District 1 | BRIDGE DECK RESTORATION & WATERPROOFING TOLU-CASAD ROAD (KY 135) & MARION-PINEY FORK ROAD (KY 506) | 1 of 5 | $266,288 | Low, 15% under the second |
| 28 APR 2022 | 22-2962 | District 1 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES IN GRAVES AND HICKMAN COUNTIES | 1 of 4 | $782,475 | Low, 22% under the second |
| 27 JAN 2022 | 22-2970 | District 1 | BRIDGE REPAIRS REIDLAND-SUWANEE ROAD (US 62) & DOVER ROAD (KY 453) | 2 of 3 | $3,480,168 | +20% |
| 10 DEC 2021 | 21-2493 | District 1 | JPC PAVEMENT FOURTH STREET (US 641X) | 1 of 2 | $325,002 | Low, 54% under the second |
| 22 OCT 2021 | 21-4300 | District 1 | ASPHALT SURFACE WITH GRADE & DRAIN IMPROVEMENTS AT VARIOUS INTERSECTIONS IN DISTRICT 1 | 1 of 1 | $384,531 | Low |
| 24 SEP 2021 | 21-4213 | District 1 | ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 80 (KY 80) | 1 of 3 | $548,855 | Low, 1.0% under the second |
| 23 JUL 2021 | 21-4208 | District 1 | ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 80 (KY 80) | 2 of 3 | $590,000 | +2.0% |
| 23 JUL 2021 | 21-2967 | District 1 | BRIDGE DECK RESTORATION & WATERPROOFING KY 121 CALLOWAY COUNTY & KY 135 LIVINGSTON COUNTY | 1 of 5 | $517,742 | Low, 4.0% under the second |
| 23 APR 2021 | 21-2965 | District 2 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES DISTRICT 2 | 1 of 6 | $940,719 | Low, 2.0% under the second |
| 19 MAR 2021 | 21-2961 | District 1 | BRIDGE DECK RESTORATION & WATERPROOFING VARIOUS ROUTES DISTRICT 1 | 2 of 4 | $1,372,682 | +9.0% |
| 21 FEB 2020 | 20-2940 | District 1 | BRIDGE SCOUR MITIGATION BRIDGE SCOUR COUNTERMEASURES - VARIOUS COUNTIES | 1 of 2 | $1,067,682 | Low, 9.0% under the second |
| 24 JAN 2020 | 20-2601 | District 1 | BRIDGE REPAIRS BRIDGE MAINTENANCE ON I-24 EB AND WB. | 1 of 4 | $1,455,174 | Low, 2.0% under the second |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.