Hal Coffey Contracting LLC: KYTC bid record
Hal Coffey Contracting LLC submitted 20 bids on Kentucky Transportation Cabinet contracts in the data, from 16 NOV 2023 to 22 OCT 2026, and was the low bidder on 1 of them (5%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $10,547,887
- Latest bid
- 22 OCT 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 2 | 0 | 0% |
| 2024 | 5 | 1 | 20% |
| 2025 | 7 | 0 | 0% |
| 2026 | 6 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thrie beam guardrail transition TL-3 | EACH | 11 | 11 (100%) | $3,328.31 | $3,200.00 | |
| Guardrail-steel W beam-S face | LF | 10 | 10 (100%) | $45.47 | $38.00 | |
| Concrete-class AA | CY | 12 | 9 (75%) | $1,450.00 | $1,716.02 | |
| Delineator for guardrail BI directional white | EACH | 10 | 9 (90%) | $16.83 | $14.19 | |
| Guardrail end treatment type 1 | EACH | 9 | 9 (100%) | $4,529.14 | $3,800.00 | |
| Object marker TY 3 | EACH | 9 | 9 (100%) | $65.04 | $120.00 | |
| Asphalt seal aggregate | TON | 12 | 7 (58%) | $675.00 | $261.98 | |
| Asphalt seal coat | TON | 12 | 7 (58%) | $1,500.00 | $1,370.39 | |
| Remove guardrail | LF | 8 | 7 (88%) | $4.55 | $3.56 | |
| Right-of-way monument type 1 | EACH | 7 | 7 (100%) | $224.70 | $188.57 | |
| Witness post | EACH | 7 | 7 (100%) | $207.49 | $150.00 | |
| Asphalt material for tack | TON | 7 | 6 (86%) | $700.00 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jim Smith Contracting Company LLC | 19 | 18 of 19 |
| Youngblood Excavating & Contracting LLC | 4 | 4 of 4 |
| Jave LLC | 4 | 3 of 4 |
| Haydon Bridge Company Inc | 3 | 0 of 3 |
| Hall Contracting of Kentucky Inc | 2 | 0 of 2 |
| Scott and Murphy Inc | 1 | 1 of 1 |
| Harper Construction LLC | 1 | 1 of 1 |
| Hinkle Construction Services LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 OCT 2026 | 26-5417 | BRIDGE REPLACEMENT KY 795 OVER CHESTNUT CREEK | 4 of 5 | $1,318,104 | +34% | |
| 24 SEP 2026 | 26-4534 | GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45) | 2 of 2 | $2,490,625 | +58% | |
| 24 SEP 2026 | 26-4533 | GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45) | 2 of 4 | $3,741,849 | +45% | |
| 24 SEP 2026 | 26-4535 | GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45) | 2 of 2 | $2,491,992 | +58% | |
| 23 JUL 2026 | 26-5415 | BRIDGE REPLACEMENT KY 2422 | 2 of 5 | $794,490 | +7.0% | |
| 26 MAR 2026 | 26-5407 | BRIDGE REPLACEMENT VARIOUS ROUTES IN GRAVES COUNTY | 4 of 4 | $1,525,469 | +27% | |
| 20 NOV 2025 | 25-5394 | BRIDGE REPLACEMENT VAN CLEAVE ROAD | 4 of 4 | $965,233 | +49% | |
| 24 APR 2025 | 25-5379 | District 1 | BRIDGE SUPERSTRUCTURE REPLACEMENT BEECHY ROAD (CR 1183) | 3 of 3 | $299,268 | +16% |
| 24 APR 2025 | 25-1305 | District 1 | GRADE, DRAIN & SURFACE WITH BRIDGE 7TH STREET (KY 1099) | 2 of 2 | $3,098,195 | +20% |
| 20 MAR 2025 | 25-5373 | District 1 | BRIDGE REPLACEMENT KY 1485 | 2 of 2 | $884,205 | +21% |
| 20 MAR 2025 | 25-4202 | District 1 | GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 68 (US 68) | 2 of 2 | $1,370,223 | +15% |
| 20 FEB 2025 | 25-5372 | District 1 | BRIDGE REPLACEMENT CR 1170 | 2 of 2 | $1,024,906 | +32% |
| 20 FEB 2025 | 25-2940 | District 1 | BRIDGE REPLACEMENT STATE HWY 295 (KY 295) | 2 of 2 | $1,955,329 | +58% |
| 22 AUG 2024 | 24-5362 | District 1 | BRIDGE REPLACEMENT KY 166 | 2 of 3 | $1,239,074 | +2.0% |
| 20 JUN 2024 | 24-5355 | District 1 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 1 | 1 of 2 | $10,547,887 | Low, 1.0% under the second |
| 23 MAY 2024 | 24-5348 | District 1 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 1 | 2 of 2 | $4,806,747 | +14% |
| 25 APR 2024 | 24-5344 | District 1 | BRIDGE REPLACEMENT KY 1346 | 2 of 2 | $2,069,329 | +41% |
| 25 JAN 2024 | 24-5332 | District 1 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 1 | 2 of 3 | $4,749,175 | +9.0% |
| 14 DEC 2023 | 23-5330 | District 1 | BRIDGE REPLACEMENT KY 2603 | 2 of 2 | $2,218,889 | +60% |
| 16 NOV 2023 | 23-5328 | District 1 | BRIDGE REPLACEMENT KY 525 | 3 of 3 | $835,197 | +27% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.