KYTC contract 26-4534 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45). Let by Kentucky Transportation Cabinet on September 24, 2026. 2 bids received; low bid $1,579,450 by Jim Smith Contracting Company LLC, -15% against the engineer's estimate of $1,847,954.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 SEP 2026
- Pay items
- 78
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $1,579,450 | Low | -15% |
| 2 | Hal Coffey Contracting LLC | $2,490,625 | +58% | +35% |
Engineer's estimate: $1,847,954.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC | 2. Hal Coffey Contracting LLC |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 7,801 | $39.00 | $45.35 |
| 0020 | Asphalt seal aggregate | TON A A | 8 | $637.89 | $1,150.00 |
| 0030 | Asphalt seal coat | TON A A | 1 | $1,779.36 | $1,720.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 572 | $99.00 | $164.50 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A A | 2,859 | $92.00 | $159.50 |
| 0060 | CL3 asph surf 0.50B PG64-22 | TON A A | 2,500 | $99.00 | $164.50 |
| 0070 | Asphalt material for tack | TON A A | 8 | $110.00 | $700.00 |
| 0080 | Standard barrier median type 4 | SQYD A A | 208 | $143.00 | $375.00 |
| 0090 | Edge key | LF A A | 208 | $33.08 | $139.00 |
| 0100 | Fabric-geotextile class 1 | SQYD A A | 12,334 | $2.53 | $3.25 |
| 0110 | Mobilization for mill & text | LS A A | 1 | $3,500.00 | $9,500.00 |
| 0120 | Asphalt pave milling & texturing | TON A A | 1,824 | $26.00 | $40.50 |
| 0130 | Geogrid reinforcement for subgrade | SQYD A A | 8,500 | $0.01 | $8.70 |
| 0140 | Temp ditch | LF A A | 1,092 | $0.40 | $0.10 |
| 0150 | Clean temp ditch | LF A A | 546 | $0.15 | $0.10 |
| 0160 | Embankment in place | CUYD A A | 1,200 | $64.00 | $150.00 |
| 0170 | Water | MGAL A A | 5 | $500.00 | $1.00 |
| 0180 | Maintain & control traffic | LS A A | 1 | $35,000 | $95,000 |
| 0190 | Edgeline rumble strips | LF A A | 8,800 | $0.64 | $0.75 |
| 0200 | Temp silt fence | LF A A | 1,092 | $2.00 | $3.00 |
| 0210 | Silt trap type A | EACH A A | 8 | $150.00 | $500.00 |
| 0220 | Silt trap type B | EACH A A | 8 | $150.00 | $500.00 |
| 0230 | Silt trap type C | EACH A A | 8 | $150.00 | $200.00 |
| 0240 | Clean silt trap type A | EACH A A | 8 | $50.00 | $15.00 |
| 0250 | Clean silt trap type B | EACH A A | 8 | $50.00 | $15.00 |
| 0260 | Clean silt trap type C | EACH A A | 8 | $50.00 | $15.00 |
| 0270 | Staking | LS A A | 1 | $50,000 | $90,000 |
| 0280 | Erosion control blanket | SQYD A A | 2,787 | $4.05 | $8.00 |
| 0290 | Temp mulch | SQYD A A | 26,163 | $0.40 | $0.05 |
| 0300 | Temp seeding and protection | SQYD A A | 19,622 | $0.48 | $0.20 |
| 0310 | Initial fertilizer | TON A A | 3 | $1,200.00 | $1,300.00 |
| 0320 | Maintenance fertilizer | TON A A | 2 | $1,200.00 | $1,300.00 |
| 0330 | Seeding and protection | SQYD A A | 39,244 | $0.78 | $0.52 |
| 0340 | Agricultural limestone | TON A A | 24 | $900.00 | $1,025.00 |
| 0350 | Pave striping-thermo-6 in W | LF A A | 12,333 | $0.58 | $0.58 |
| 0360 | Pave striping-thermo-6 in Y | LF A A | 4,600 | $0.58 | $0.58 |
| 0370 | Pave striping-thermo-12 in W | LF A A | 1,907 | $0.95 | $0.95 |
| 0380 | Pave striping-thermo-12 in Y | LF A A | 630 | $1.00 | $1.00 |
| 0390 | Pave striping-temp rem tape-B | LF A A | 1,500 | $1.85 | $1.85 |
| 0400 | Pave striping-temp rem tape-W | LF A A | 1,300 | $1.85 | $1.85 |
| 0410 | Pave striping-temp rem tape-Y | LF A A | 1,300 | $1.85 | $1.85 |
| 0420 | Pave marking-thermo stop bar-24IN | LF A A | 34 | $4.00 | $4.00 |
| 0430 | Pave marking-thermo cross-hatch | SQFT A A | 422 | $2.75 | $2.75 |
| 0440 | Pave marking-thermo curv arrow | EACH A A | 18 | $22.25 | $22.25 |
| 0450 | Pave marking-thermo only | EACH A A | 16 | $125.00 | $125.00 |
| 0460 | Inlaid pavement marker-MW | EACH A A | 108 | $19.50 | $19.50 |
| 0470 | Fuel adjustment | DOLL A A | 11,143 | $1.00 | $1.00 |
| 0480 | Asphalt adjustment | DOLL A A | 20,940 | $1.00 | $1.00 |
| 0490 | Pave mark thermo chevron | SQFT A A | 825 | $2.75 | $2.75 |
| 0500 | Pave marking-thermo U-turn | EACH A A | 10 | $150.00 | $150.00 |
| 0510 | Storm sewer pipe-18 in | LF A A | 211 | $90.00 | $135.00 |
| 0520 | Pipe culvert headwall-18 in | EACH A A | 4 | $2,500.00 | $5,500.00 |
| 0530 | Drop box inlet type 6A | EACH A A | 1 | $10,000 | $12,000 |
| 0540 | Fabric-geotextile class 2 for pipe | SQYD A A | 236 | $2.00 | $2.00 |
| 0550 | Temporary signs | SQFT A A | 500 | $10.00 | $12.00 |
| 0560 | Portable changeable message sign | EACH A A | 2 | $5,000.00 | $2,500.00 |
| 0570 | Arrow panel | EACH A A | 2 | $3,000.00 | $2,500.00 |
| 0580 | SBM alum sheet signs .080 in | SQFT A A | 340 | $50.30 | $41.00 |
| 0590 | Steel post type 1 | LF A A | 492 | $29.19 | $26.00 |
| 0600 | Barcode sign inventory | EACH A A | 96 | $23.81 | $25.00 |
| 0610 | Pole 30 FT MTG HT | EACH A A | 2 | $3,200.00 | $3,200.00 |
| 0620 | Pole 40 FT MTG HT | EACH A A | 2 | $3,200.00 | $3,200.00 |
| 0630 | Bracket 12 FT | EACH A A | 2 | $750.00 | $750.00 |
| 0640 | Bracket 15 FT | EACH A A | 2 | $750.00 | $750.00 |
| 0650 | Pole base | EACH A A | 4 | $2,600.00 | $2,600.00 |
| 0660 | Transformer base | EACH A A | 4 | $1,000.00 | $1,000.00 |
| 0670 | Lighting control equipment | EACH A A | 1 | $20,000 | $40,000 |
| 0680 | Fused connector kit | EACH A A | 8 | $50.00 | $50.00 |
| 0690 | Trenching and backfilling | LF A A | 1,500 | $18.00 | $18.00 |
| 0700 | Wire-no. 12 | LF A A | 594 | $1.50 | $1.50 |
| 0710 | Electrical junction box type A | EACH A A | 7 | $1,525.00 | $1,525.00 |
| 0720 | Bore and jack conduit | LF A A | 530 | $40.00 | $40.00 |
| 0730 | Wire-no. 10 | LF A A | 5,700 | $1.50 | $1.50 |
| 0740 | LED luminaire | EACH A A | 4 | $1,200.00 | $1,200.00 |
| 0750 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 1,500 | $3.25 | $3.25 |
| 0760 | PVC conduit-2 in-schedule 80 | LF A A | 530 | $10.25 | $10.25 |
| 0770 | Remove signal equipment | EACH A A | 1 | $2,000.00 | $22,000 |
| 0780 | Demobilization | LS A A | 1 | $22,900 | $45,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.