Jim Smith Contracting Company LLC: KYTC bid record

Jim Smith Contracting Company LLC submitted 127 bids on Kentucky Transportation Cabinet contracts in the data, from 28 APR 2022 to 22 OCT 2026, and was the low bidder on 117 of them (92%). When it was not low, its total sat a median +10% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$265,507,797
Latest bid
22 OCT 2026
Data through
22 OCT 2026
127Bids
117Low bids
92Win rate, percent
+10%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
20222525100%
2023312994%
2024262388%
2025262285%
2026191895%
Jim Smith Contracting Company LLC, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 1938794%
District 2200%
Jim Smith Contracting Company LLC, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Armored edge for concreteLF2424 (100%)$61.12$120.00
Cyclopean stone rip rapTON2423 (96%)$39.52$60.00
Concrete-class ACY2621 (81%)$994.82$1,088.01
Steel reinforcement-epoxy coatedLB2421 (88%)$1.81$2.00
Delineator for guardrail BI directional whiteEACH2321 (91%)$15.47$14.19
DemobilizationLS A A2120 (95%)$14,150$10,682
CL2 asph surf 0.38D PG64-22TON2618 (69%)$171.87$102.95
CL2 asph base 1.00D PG64-22TON2117 (81%)$130.00$135.00
Temporary signsSQFT A A2116 (76%)$0.50$6.05
Guardrail end treatment type 1EACH1916 (84%)$4,276.43$3,800.00
Asphalt material for tackTON A A1915 (79%)$600.00$1.05
Guardrail-steel W beam-S faceLF1715 (88%)$45.36$38.00
Jim Smith Contracting Company LLC, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Hal Coffey Contracting LLC191 of 19
Central Paving Company of Paducah111 of 11
Murray Paving Inc91 of 9
Haydon Bridge Company Inc71 of 7
Strawser Construction Inc62 of 6
Youngblood Excavating & Contracting LLC41 of 4
Jave LLC40 of 4
Scott and Murphy Inc30 of 3
Hinkle Construction Services LLC31 of 3
Hall Contracting of Kentucky Inc31 of 3
Jim Smith Contracting Company LLC, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 OCT 202626-5417BRIDGE REPLACEMENT KY 795 OVER CHESTNUT CREEK1 of 5$984,605Low, 19% under the second
24 SEP 202626-4534GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45)1 of 2$1,579,450Low, 58% under the second
24 SEP 202626-4533GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45)1 of 4$2,588,851Low, 45% under the second
24 SEP 202626-4535GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45)1 of 2$1,579,322Low, 58% under the second
03 SEP 202626-2184ASPHALT RESURFACING GLENDALE RD/S 4TH ST/CHESTNUT ST (US 641X OMIT CONC SECT)1 of 3$486,619Low, 15% under the second
03 SEP 202626-2102ASPHALT RESURFACING MAYFIELD ROAD (KY 58)1 of 2$1,236,796Low, 15% under the second
03 SEP 202626-2134ASPHALT RESURFACING BENTON ROAD (KY 131)1 of 2$407,963Low, 24% under the second
20 AUG 202626-2171ASPHALT RESURFACING WICKLIFFE ROAD (KY 286)1 of 2$1,040,660Low, 4.0% under the second
20 AUG 202626-2014ASPHALT RESURFACING SEDALIA HIGHWAY (KY 97)2 of 2$570,5430.0%
20 AUG 202626-2016ASPHALT RESURFACING MARSHALL COUNTY (KY 1523 & US 68)1 of 2$1,414,399Low, 10% under the second
23 JUL 202626-5415BRIDGE REPLACEMENT KY 24221 of 5$743,672Low, 7.0% under the second
21 MAY 202626-4512ASPHALT PAVEMENT & ROADWAY REHAB BENTON ROAD (US 68)1 of 1$3,631,783Low
23 APR 202626-4505GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 60 (US 60)1 of 1$2,092,361Low
26 MAR 202626-5407BRIDGE REPLACEMENT VARIOUS ROUTES IN GRAVES COUNTY1 of 4$1,199,980Low, 1.0% under the second
26 MAR 202626-2013ASPHALT RESURFACING FULTON RD/WATER ST/N 8TH STREET (US 45)1 of 2$221,733Low, 22% under the second
26 MAR 202626-2105ASPHALT RESURFACING EDDYVILLE TO PRINCETON ROAD (KY 293)1 of 2$424,720Low, 14% under the second
26 MAR 202626-2043ASPHALT RESURFACING CAIRO ROAD (KY 305)1 of 2$267,614Low, 34% under the second
19 FEB 202626-2042ASPHALT RESURFACING MAYFIELD METROPOLIS RD (KY 1565)1 of 2$109,980Low, 23% under the second
19 FEB 202626-2015ASPHALT RESURFACING AURORA TO BENTON (US 68)1 of 2$230,240Low, 22% under the second
11 DEC 202525-1039BRIDGE WITH GRADE, DRAIN & SURFACE KY 115 STRUCTURE OVER I-243 of 4$3,765,158+6.0%
11 DEC 202525-1012GRADE, DRAIN & SURFACE WITH BRIDGE NEW ROUTE1 of 2$15,543,899Low, 43% under the second
20 NOV 202525-5394BRIDGE REPLACEMENT VAN CLEAVE ROAD1 of 4$646,520Low, 8.0% under the second
20 NOV 202525-5397BRIDGE REPLACEMENT VARIOUS PROJECTS IN DISTRICT 11 of 1$2,934,323Low
23 OCT 202525-1029PAVEMENT (WITH ALTERNATES) I-241 of 1$34,120,981Low
25 SEP 202525-1117ASPHALT REHAB INTERSTATE/PARKWAY I-691 of 1$21,767,589Low
Jim Smith Contracting Company LLC: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way