KYTC contract 26-4533 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 45 (US 45). Let by Kentucky Transportation Cabinet on September 24, 2026. 4 bids received; low bid $2,588,851 by Jim Smith Contracting Company LLC, -18% against the engineer's estimate of $3,175,596.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 SEP 2026
- Pay items
- 105
- Data through
- 22 OCT 2026
3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $2,588,851 | Low | -18% |
| 2 | Hal Coffey Contracting LLC | $3,741,849 | +45% | +18% |
| 4 | Hinkle Construction Services LLC | $4,356,810 | +68% | +37% |
Engineer's estimate: $3,175,596.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC | 2. Hal Coffey Contracting LLC | 3. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 6,415 | $38.50 | $45.35 | $63.10 |
| 0020 | Crushed aggregate size no 2 | TON A A | 8,979 | $35.00 | $35.00 | $60.23 |
| 0030 | Asphalt seal aggregate | TON A A | 33 | $269.04 | $1,150.00 | $345.55 |
| 0040 | Asphalt seal coat | TON A A | 4 | $2,298.42 | $1,720.00 | $3,568.30 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A A | 3,718 | $92.00 | $159.50 | $111.02 |
| 0060 | CL3 asph surf 0.50B PG64-22 | TON A A | 2,027 | $98.00 | $164.50 | $116.30 |
| 0070 | Asphalt material for tack | TON A A | 15 | $100.00 | $700.00 | $845.83 |
| 0080 | Fabric-geotextile class 1 | SQYD A A | 9,661 | $2.46 | $3.25 | $4.41 |
| 0090 | Fabric-geotextile class 4A | SQYD A A | 9,661 | $4.41 | $3.85 | $7.44 |
| 0100 | Mobilization for mill & text | LS A A | 1 | $3,500.00 | $9,500.00 | $3,698.17 |
| 0110 | Asphalt pave milling & texturing | TON A A | 1,230 | $31.23 | $48.85 | $54.52 |
| 0120 | Joint adhesive | LF A A | 7,610 | $0.75 | $0.75 | $0.80 |
| 0130 | Longitudinal edge key | LF A A | 4,731 | $4.00 | $7.00 | $9.38 |
| 0140 | Standard curb and gutter | LF A A | 3,209 | $36.00 | $43.00 | $59.17 |
| 0150 | Delineator for G/R BI directional white | EACH A A | 13 | $11.76 | $11.76 | $12.37 |
| 0160 | Temp ditch | LF A A | 950 | $0.40 | $0.10 | $3.20 |
| 0170 | Clean temp ditch | LF A A | 475 | $0.20 | $0.10 | $0.02 |
| 0180 | Roadway excavation | CUYD A A | 8,224 | $32.00 | $42.00 | $88.14 |
| 0190 | G/R-W beam-S face TL-3 | LF A A | 654 | $36.29 | $36.29 | $38.16 |
| 0200 | G/R end treatment type 1 | EACH A A | 5 | $3,507.31 | $3,507.31 | $3,687.59 |
| 0210 | G/R end treatment type 2M | EACH A A | 1 | $1,907.23 | $1,907.23 | $2,005.27 |
| 0220 | Remove G/R | LF A A | 1,212 | $3.58 | $3.58 | $3.77 |
| 0230 | Channel lining class II | TON A A | 100 | $55.00 | $69.00 | $97.61 |
| 0240 | Clearing and grubbing | LS A A | 1 | $40,000 | $185,000 | $40,500 |
| 0250 | Temporary signs | SQFT A A | 755 | $11.34 | $12.00 | $13.26 |
| 0260 | Maintain & control traffic | LS A A | 1 | $10,000 | $95,000 | $185,880 |
| 0270 | Portable changeable message sign | EACH A A | 4 | $4,800.00 | $2,500.00 | $14,754 |
| 0280 | Edgeline rumble strips | LF A A | 7,620 | $0.74 | $0.73 | $0.88 |
| 0290 | Temp silt fence | LF A A | 950 | $2.25 | $2.00 | $12.92 |
| 0300 | Silt trap type A | EACH A A | 13 | $150.00 | $500.00 | $303.44 |
| 0310 | Silt trap type B | EACH A A | 13 | $150.00 | $500.00 | $381.59 |
| 0320 | Silt trap type C | EACH A A | 13 | $150.00 | $200.00 | $840.11 |
| 0330 | Clean silt trap type A | EACH A A | 13 | $50.00 | $15.00 | $121.37 |
| 0340 | Clean silt trap type B | EACH A A | 13 | $50.00 | $15.00 | $121.37 |
| 0350 | Clean silt trap type C | EACH A A | 13 | $50.00 | $15.00 | $249.34 |
| 0360 | Staking | LS A A | 1 | $10,000 | $90,000 | $54,000 |
| 0370 | Arrow panel | EACH A A | 2 | $2,500.00 | $2,500.00 | $4,724.98 |
| 0380 | Erosion control blanket | SQYD A A | 3,000 | $4.05 | $8.00 | $4.28 |
| 0390 | Temp mulch | SQYD A A | 28,409 | $0.40 | $0.05 | $0.42 |
| 0400 | Temp seeding and protection | SQYD A A | 21,306 | $0.48 | $0.20 | $0.51 |
| 0410 | Initial fertilizer | TON A A | 2.10 | $1,200.00 | $1,300.00 | $1,267.94 |
| 0420 | Maintenance fertilizer | TON A A | 1.30 | $1,200.00 | $1,300.00 | $1,267.94 |
| 0430 | Seeding and protection | SQYD A A | 39,612 | $0.78 | $0.52 | $0.83 |
| 0440 | Agricultural limestone | TON A A | 25 | $900.00 | $1,025.00 | $950.96 |
| 0450 | Pave striping-temp paint-4 in | LF A A | 5,500 | $0.06 | $0.06 | $0.06 |
| 0460 | Pave striping-thermo-6 in W | LF A A | 8,602 | $0.58 | $0.58 | $0.61 |
| 0470 | Pave striping-thermo-6 in Y | LF A A | 4,768 | $0.58 | $0.58 | $0.61 |
| 0480 | Pave striping-thermo-12 in W | LF A A | 901 | $0.95 | $0.95 | $1.00 |
| 0490 | Pave striping-temp rem tape-B | LF A A | 1,500 | $1.85 | $1.85 | $1.96 |
| 0500 | Pave striping-temp rem tape-W | LF A A | 1,300 | $1.85 | $1.85 | $1.96 |
| 0510 | Pave striping-temp rem tape-Y | LF A A | 1,300 | $1.85 | $1.85 | $1.96 |
| 0520 | Pave marking-thermo stop bar-24IN | LF A A | 56 | $4.00 | $4.00 | $4.23 |
| 0530 | Pave marking-thermo cross-hatch | SQFT A A | 203 | $2.75 | $2.75 | $2.90 |
| 0540 | Pave marking-thermo curv arrow | EACH A A | 23 | $22.25 | $22.25 | $23.51 |
| 0550 | Pave marking-thermo only | EACH A A | 6 | $125.00 | $125.00 | $132.08 |
| 0560 | Pavement marker TY iva-MW temp | EACH A A | 50 | $2.75 | $2.75 | $2.90 |
| 0570 | Pavement marker TY iva-MY temp | EACH A A | 50 | $2.75 | $2.75 | $2.90 |
| 0580 | Inlaid pavement marker-MW | EACH A A | 154 | $19.50 | $19.50 | $20.61 |
| 0590 | Inlaid pavement marker-MY | EACH A A | 49 | $19.50 | $19.50 | $20.61 |
| 0600 | Concrete-class A | CUYD A A | 206 | $398.00 | $390.00 | $526.20 |
| 0610 | Fuel adjustment | DOLL A A | 5,351 | $1.00 | $1.00 | $1.00 |
| 0620 | Asphalt adjustment | DOLL A A | 23,267 | $1.00 | $1.00 | $1.00 |
| 0630 | Object marker TY 3 | EACH A A | 5 | $25.82 | $25.82 | $27.15 |
| 0640 | Pave mark thermo chevron | SQFT A A | 729 | $2.75 | $2.75 | $2.90 |
| 0650 | Pave marking-thermo dotted lane exten | LF A A | 258 | $0.60 | $0.60 | $0.63 |
| 0660 | Pave marking-thermo U-turn | EACH A A | 14 | $150.00 | $150.00 | $158.50 |
| 0670 | Concrete paint | SQYD A A | 364 | $0.75 | $0.75 | $0.80 |
| 0680 | Storm sewer pipe-15 in | LF A A | 418 | $75.00 | $105.00 | $126.46 |
| 0690 | Storm sewer pipe-18 in | LF A A | 891 | $75.00 | $115.00 | $130.74 |
| 0700 | Curb box inlet type A | EACH A A | 12 | $8,042.76 | $10,500 | $10,617 |
| 0710 | Curb box inlet type B | EACH A A | 2 | $8,674.81 | $10,500 | $9,855.93 |
| 0720 | Drop box inlet type 5B | EACH A A | 2 | $10,002 | $12,000 | $10,119 |
| 0730 | Drop box inlet type 16G | EACH A A | 1 | $6,426.86 | $10,000 | $6,680.14 |
| 0740 | Cap drop box inlet | EACH A A | 2 | $1,734.64 | $2,000.00 | $4,143.76 |
| 0750 | Adjust inlet | EACH A A | 1 | $5,250.00 | $2,000.00 | $4,478.86 |
| 0760 | Fabric-geotextile class 2 for pipe | SQYD A A | 1,845 | $2.00 | $2.00 | $2.00 |
| 0770 | Cored hole drainage box con- 18 in | EACH A A | 2 | $2,336.12 | $1,500.00 | $4,019.55 |
| 0780 | Cored hole drainage box con-15 in | EACH A A | 3 | $2,336.12 | $1,500.00 | $2,562.13 |
| 0790 | Pipeline inspection | LF A A | 990 | $2.63 | $6.00 | $2.77 |
| 0800 | SBM alum sheet signs .080 in | SQFT A A | 169.09 | $41.02 | $41.00 | $43.13 |
| 0810 | SBM alum sheet signs .125 in | SQFT A A | 142.11 | $44.66 | $57.00 | $46.96 |
| 0820 | Steel post type 1 | LF A A | 398 | $28.49 | $25.00 | $29.95 |
| 0830 | Remove & relocate signs | EACH A A | 24 | $348.22 | $300.00 | $366.12 |
| 0840 | Remove sign | EACH A A | 15 | $92.97 | $150.00 | $97.74 |
| 0850 | GMSS type D | EACH A A | 7 | $417.88 | $450.00 | $439.37 |
| 0860 | Barcode sign inventory | EACH A A | 76 | $23.24 | $20.00 | $24.43 |
| 0870 | Pole 30 FT MTG HT | EACH A A | 2 | $3,200.00 | $3,200.00 | $3,208.41 |
| 0880 | Pole 40 FT MTG HT | EACH A A | 2 | $3,200.00 | $3,200.00 | $3,965.19 |
| 0890 | Bracket 12 FT | EACH A A | 2 | $750.00 | $750.00 | $1,153.09 |
| 0900 | Bracket 15 FT | EACH A A | 2 | $750.00 | $750.00 | $1,259.54 |
| 0910 | Pole base | EACH A A | 4 | $2,600.00 | $2,600.00 | $3,056.64 |
| 0920 | Transformer base | EACH A A | 4 | $1,000.00 | $1,000.00 | $1,930.95 |
| 0930 | Lighting control equipment | EACH A A | 1 | $20,000 | $40,000 | $25,447 |
| 0940 | Fused connector kit | EACH A A | 8 | $50.00 | $50.00 | $322.53 |
| 0950 | Trenching and backfilling | LF A A | 1,550 | $18.00 | $18.00 | $5.23 |
| 0960 | Wire-no. 12 | LF A A | 594 | $1.50 | $1.50 | $2.35 |
| 0970 | Electrical junction box type A | EACH A A | 7 | $1,525.00 | $1,525.00 | $2,212.37 |
| 0980 | Bore and jack conduit | LF A A | 460 | $40.00 | $40.00 | $58.85 |
| 0990 | Wire-no. 10 | LF A A | 5,800 | $1.50 | $1.50 | $2.55 |
| 1000 | LED luminaire | EACH A A | 4 | $1,200.00 | $1,200.00 | $794.72 |
| 1010 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 1,550 | $3.25 | $3.25 | $10.19 |
| 1020 | PVC conduit-2 in-schedule 80 | LF A A | 460 | $10.25 | $10.25 | $15.10 |
| 1030 | Remove signal equipment | EACH A A | 1 | $2,000.00 | $35,000 | $1.05 |
| 1040 | Mobilization | LS A A | 1 | $90,000 | $174,000 | $200,000 |
| 1050 | Demobilization | LS A A | 1 | $36,510 | $55,000 | $65,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 24, 2026. Compiled by Mirage Metrics.