KYTC contract 26-4505 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE US HIGHWAY 60 (US 60). Let by Kentucky Transportation Cabinet on April 23, 2026. 1 bid received; low bid $2,092,361 by Jim Smith Contracting Company LLC, -8.8% against the engineer's estimate of $2,293,198.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 APR 2026
- Pay items
- 110
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $2,092,361 | Low | -9.0% |
Engineer's estimate: $2,293,198.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC |
|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 3,735 | $48.90 |
| 0020 | Geogrid reinforcement for subgrade | SQYD A A | 4,853 | $3.99 |
| 0030 | Asphalt seal aggregate | TON A A | 13 | $732.47 |
| 0040 | Asphalt seal coat | TON A A | 1.60 | $1,871.06 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 20 | $110.00 |
| 0060 | CL3 asph base 1.00D PG64-22 | TON A A | 3,083 | $100.00 |
| 0070 | CL4 asph surf 0.50B PG64-22 | TON A A | 1,788 | $110.00 |
| 0080 | Asphalt material for tack | TON A A | 17.40 | $750.00 |
| 0090 | Fabric-geotextile class 1 | SQYD A A | 4,853 | $2.46 |
| 0100 | Mobilization for mill & text | LS A A | 1 | $3,000.00 |
| 0110 | Asphalt pave milling & texturing | TON A A | 1,290 | $28.94 |
| 0120 | Joint adhesive | LF A A | 7,291 | $1.00 |
| 0130 | Longitudinal edge key | LF A A | 4,568 | $2.48 |
| 0140 | Standard barrier median type 2 | SQYD A A | 830 | $129.00 |
| 0150 | Standard barrier median type 4 | SQYD A A | 271 | $109.00 |
| 0160 | Barricade-type III | EACH A A | 8 | $250.00 |
| 0170 | Temp ditch | LF A A | 950 | $0.35 |
| 0180 | Clean temp ditch | LF A A | 475 | $0.15 |
| 0190 | Roadway excavation | CUYD A A | 2,723 | $38.25 |
| 0200 | Channel lining class II | TON A A | 100 | $50.00 |
| 0210 | Clearing and grubbing | LS A A | 1 | $58,000 |
| 0220 | Temporary signs | SQFT A A | 755 | $15.00 |
| 0230 | Maintain & control traffic | LS A A | 1 | $40,000 |
| 0240 | Lane closure | EACH A A | 4 | $750.00 |
| 0250 | Truck mounted attenuator | EACH A A | 2 | $12,000 |
| 0260 | Portable changeable message sign | EACH A A | 4 | $4,000.00 |
| 0270 | Edgeline rumble strips | LF A A | 2,568 | $2.20 |
| 0280 | Temp silt fence | LF A A | 950 | $1.98 |
| 0290 | Silt trap type A | EACH A A | 7 | $150.00 |
| 0300 | Silt trap type B | EACH A A | 7 | $150.00 |
| 0310 | Silt trap type C | EACH A A | 7 | $150.00 |
| 0320 | Clean silt trap type A | EACH A A | 7 | $75.00 |
| 0330 | Clean silt trap type B | EACH A A | 7 | $75.00 |
| 0340 | Clean silt trap type C | EACH A A | 7 | $75.00 |
| 0350 | Staking | LS A A | 1 | $75,000 |
| 0360 | Arrow panel | EACH A A | 2 | $750.00 |
| 0370 | Tubular markers | EACH A A | 170 | $152.50 |
| 0380 | Erosion control blanket | SQYD A A | 5,000 | $4.00 |
| 0390 | Temp mulch | SQYD A A | 9,243 | $0.42 |
| 0400 | Temp seeding and protection | SQYD A A | 6,932 | $0.56 |
| 0410 | Initial fertilizer | TON A A | 0.80 | $1,200.00 |
| 0420 | Maintenance fertilizer | TON A A | 0.50 | $1,200.00 |
| 0430 | Seeding and protection | SQYD A A | 8,864 | $0.75 |
| 0440 | Agricultural limestone | TON A A | 9 | $950.00 |
| 0450 | Pave striping-temp paint-4 in | LF A A | 16,650 | $0.06 |
| 0460 | Pave striping-thermo-6 in W | LF A A | 11,160 | $0.70 |
| 0470 | Pave striping-thermo-6 in Y | LF A A | 6,437 | $0.72 |
| 0480 | Pave striping-thermo-12 in W | LF A A | 1,540 | $1.75 |
| 0490 | Pave striping-temp rem tape-B | LF A A | 1,450 | $2.00 |
| 0500 | Pave striping-temp rem tape-W | LF A A | 1,100 | $1.90 |
| 0510 | Pave striping-temp rem tape-Y | LF A A | 1,100 | $1.90 |
| 0520 | Pave marking-thermo stop bar-24IN | LF A A | 48 | $8.00 |
| 0530 | Pave marking-thermo cross-hatch | SQFT A A | 1,148 | $2.00 |
| 0540 | Pave marking-thermo curv arrow | EACH A A | 28 | $45.00 |
| 0550 | Pave marking-thermo only | EACH A A | 12 | $200.00 |
| 0560 | Pavement marker TY iva-MW temp | EACH A A | 56 | $4.00 |
| 0570 | Pavement marker TY iva-MY temp | EACH A A | 56 | $4.00 |
| 0580 | Inlaid pavement marker-MW | EACH A A | 155 | $16.25 |
| 0590 | Inlaid pavement marker-MY | EACH A A | 29 | $16.25 |
| 0600 | Fuel adjustment | DOLL A A | 2,568 | $1.00 |
| 0610 | Asphalt adjustment | DOLL A A | 19,809 | $1.00 |
| 0620 | Pave marking-thermo yield bar-36 in | LF A A | 36 | $10.00 |
| 0630 | Pave mark thermo chevron | SQFT A A | 568 | $1.75 |
| 0640 | Pave marking-thermo dotted lane exten | LF A A | 450 | $0.75 |
| 0650 | Pave marking-thermo U-turn | EACH A A | 16 | $250.00 |
| 0660 | Concrete paint | SQYD A A | 1,291 | $1.45 |
| 0670 | Remove signal equipment | EACH A A | 1 | $8,500.00 |
| 0680 | Electronic delivery MGMT system - agg | LS A A | 1 | $2,500.00 |
| 0690 | Culvert pipe-18 in | LF A A | 45 | $210.96 |
| 0700 | Storm sewer pipe-15 in | LF A A | 387 | $62.79 |
| 0710 | Storm sewer pipe-18 in | LF A A | 1,263 | $108.36 |
| 0720 | Non-perforated pipe-4 in | LF A A | 108 | $67.42 |
| 0730 | Remove pipe | LF A A | 6 | $10.00 |
| 0740 | Sloped box outlet type 1-18 in | EACH A A | 2 | $3,385.04 |
| 0750 | Curb box inlet type A | EACH A A | 5 | $9,711.21 |
| 0760 | Curb box inlet type B | EACH A A | 11 | $9,300.09 |
| 0770 | Curb box inlet type B-T | EACH A A | 1 | $8,221.60 |
| 0780 | Drop box inlet type 5D | EACH A A | 2 | $6,806.68 |
| 0790 | Drop box inlet type 5E | EACH A A | 2 | $6,938.91 |
| 0800 | Cap drop box inlet | EACH A A | 1 | $2,700.98 |
| 0810 | Cored hole drainage box con-4 in | EACH A A | 1 | $2,089.69 |
| 0820 | Fabric-geotextile class 2 for pipe | SQYD A A | 2,626 | $2.00 |
| 0830 | Remove headwall | EACH A A | 2 | $500.00 |
| 0840 | Concrete-class A | CUYD A A | 2.20 | $1,225.00 |
| 0850 | Remove and reset perf pipe headwall | EACH A A | 2 | $500.00 |
| 0860 | Cored hole drainage box con- 18 in | EACH A A | 4 | $750.00 |
| 0870 | Remove perf pipe headwall | EACH A A | 2 | $500.00 |
| 0880 | Junction box-66 in | EACH A A | 1 | $54,000 |
| 0890 | SBM alum sheet signs .080 in | SQFT A A | 337.52 | $47.81 |
| 0900 | SBM alum sheet signs .125 in | SQFT A A | 82.25 | $26.29 |
| 0910 | Steel post type 1 | LF A A | 468 | $28.36 |
| 0920 | Remove & relocate signs | EACH A A | 18 | $379.21 |
| 0930 | Remove sign | EACH A A | 10 | $111.79 |
| 0940 | GMSS type D | EACH A A | 7 | $488.44 |
| 0950 | Barcode sign inventory | EACH A A | 80 | $47.62 |
| 0960 | Pole 40 FT MTG HT | EACH A A | 4 | $2,900.00 |
| 0970 | Bracket 15 FT | EACH A A | 4 | $800.00 |
| 0980 | Pole base | EACH A A | 4 | $2,500.00 |
| 0990 | Transformer base | EACH A A | 4 | $1,150.00 |
| 1000 | Lighting control equipment | EACH A A | 1 | $21,500 |
| 1010 | Fused connector kit | EACH A A | 8 | $35.00 |
| 1020 | Trenching and backfilling | LF A A | 1,400 | $18.00 |
| 1030 | Wire-no. 12 | LF A A | 500 | $1.50 |
| 1040 | Electrical junction box type A | EACH A A | 8 | $1,500.00 |
| 1050 | Bore and jack conduit | LF A A | 480 | $40.00 |
| 1060 | Wire-no. 10 | LF A A | 4,500 | $1.50 |
| 1070 | LED luminaire | EACH A A | 4 | $1,200.00 |
| 1080 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 1,400 | $3.25 |
| 1090 | PVC conduit-2 in-schedule 80 | LF A A | 675 | $10.25 |
| 1100 | Demobilization | LS A A | 1 | $30,922 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 23, 2026. Compiled by Mirage Metrics.