KYTC contract 25-1117 bid tabulation
ASPHALT REHAB INTERSTATE/PARKWAY I-69. Let by Kentucky Transportation Cabinet on September 25, 2025. 1 bid received; low bid $21,767,589 by Jim Smith Contracting Company LLC, -1.7% against the engineer's estimate of $22,150,054.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 SEP 2025
- Pay items
- 159
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $21,767,589 | Low | -2.0% |
Engineer's estimate: $22,150,054.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC |
|---|---|---|---|---|
| 0010 | Dga base | TON A A | 13,595 | $47.00 |
| 0020 | Asphalt seal aggregate | TON A A | 3,156 | $87.71 |
| 0030 | Asphalt seal coat | TON A A | 378 | $1,060.79 |
| 0040 | Leveling & wedging PG76-22 | TON A A | 8,618 | $135.00 |
| 0050 | CL4 asph base 1.50D PG76-22 | TON A A | 26,922 | $105.00 |
| 0060 | CL4 asph surf 0.50A PG76-22 | TON A A | 49,844 | $145.00 |
| 0070 | Mobilization for mill & text | LS A A | 1 | $3,000.00 |
| 0080 | Mobilization for mill & text | LS A A | 1 | $3,000.00 |
| 0090 | Asphalt pave milling & texturing | TON A A | 74,866 | $20.00 |
| 0100 | Joint adhesive | LF A A | 186,402 | $0.43 |
| 0110 | Asphalt material for tack non-tracking | TON A A | 291 | $700.00 |
| 0120 | Delineator for guardrail mono directional white | EACH A A | 225 | $15.37 |
| 0130 | Delineator for guardrail mono directional yello | EACH A A | 112 | $15.37 |
| 0140 | Delineator for barrier - white | EACH A A | 26 | $20.58 |
| 0150 | Delineator for barrier - yellow | EACH A A | 26 | $22.46 |
| 0160 | Relocate temp conc barrier | LF A A | 520 | $26.70 |
| 0170 | Barricade-type III | EACH A A | 64 | $750.00 |
| 0180 | Paved ditch type 1 | SQYD A A | 170 | $250.00 |
| 0190 | Embankment in place | CUYD A A | 7,353 | $45.00 |
| 0200 | Guardrail end treatment type 1 | EACH A A | 11 | $3,698.29 |
| 0210 | Guardrail end treatment type 2M | EACH A A | 11 | $1,899.89 |
| 0220 | Remove guardrail | LF A A | 16,375 | $3.39 |
| 0230 | Channel lining class III | TON A A | 300 | $60.00 |
| 0240 | Clearing and grubbing | LS A A | 1 | $75,000 |
| 0250 | Clearing and grubbing | LS A A | 1 | $30,000 |
| 0260 | Temporary signs | SQFT A A | 1,400 | $16.35 |
| 0270 | Maintain & control traffic | LS A A | 1 | $450,000 |
| 0280 | Maintain & control traffic | LS A A | 1 | $125,000 |
| 0290 | Truck mounted attenuator | EACH A A | 4 | $45,000 |
| 0300 | Portable changeable message sign | EACH A A | 4 | $11,000 |
| 0310 | Edgeline rumble strips | LF A A | 324,664 | $0.21 |
| 0320 | Silt trap type A | EACH A A | 21 | $196.24 |
| 0330 | Silt trap type B | EACH A A | 21 | $203.58 |
| 0340 | Silt trap type C | EACH A A | 21 | $203.58 |
| 0350 | Clean silt trap type A | EACH A A | 21 | $85.99 |
| 0360 | Clean silt trap type B | EACH A A | 21 | $85.99 |
| 0370 | Clean silt trap type C | EACH A A | 21 | $85.99 |
| 0380 | Staking | LS A A | 1 | $120,000 |
| 0390 | Staking | LS A A | 1 | $60,000 |
| 0400 | Relocate crash cushion | EACH A A | 1 | $3,368.38 |
| 0410 | Conc barrier wall type 9T | LF A A | 520 | $100.76 |
| 0420 | Erosion control blanket | SQYD A A | 57,880 | $3.85 |
| 0430 | Temp mulch | SQYD A A | 64,000 | $0.68 |
| 0440 | Temp seeding and protection | SQYD A A | 48,000 | $0.78 |
| 0450 | Initial fertilizer | TON A A | 5.10 | $1,400.00 |
| 0460 | Maintenance fertilizer | TON A A | 3 | $1,400.00 |
| 0470 | Agricultural limestone | TON A A | 60 | $400.00 |
| 0480 | Flexible delineator post-M/W | EACH A A | 1,447 | $61.39 |
| 0490 | Flexible delineator post-M/Y | EACH A A | 71 | $61.39 |
| 0500 | Pave striping-temp paint-6 in | LF A A | 743,195 | $0.08 |
| 0510 | Pave striping-temp paint-12 in | LF A A | 1,706 | $0.10 |
| 0520 | Pave striping removal-6 in | LF A A | 185,000 | $0.34 |
| 0530 | Pave striping-thermo-6 in W | LF A A | 202,391 | $0.75 |
| 0540 | Pave striping-thermo-6 in Y | LF A A | 162,332 | $0.75 |
| 0550 | Pave striping-thermo-12 in W | LF A A | 2,386 | $1.50 |
| 0560 | Pave striping-temp rem tape-B | LF A A | 11,000 | $2.45 |
| 0570 | Pave striping-temp rem tape-W | LF A A | 4,400 | $2.25 |
| 0580 | Pave striping-temp rem tape-Y | LF A A | 4,400 | $2.25 |
| 0590 | Pave striping-dur TY 1-6 in W | LF A A | 3,480 | $7.75 |
| 0600 | Pave striping-dur TY 1-6 in Y | LF A A | 2,784 | $7.75 |
| 0610 | Pave marking-thermo stop bar-24IN | LF A A | 112 | $6.00 |
| 0620 | Pave marking-thermo cross-hatch | SQFT A A | 536 | $4.95 |
| 0630 | Pave marking-thermo curv arrow | EACH A A | 2 | $95.00 |
| 0640 | Pavement marker TY iva-MW temp | EACH A A | 585 | $4.10 |
| 0650 | Pavement marker TY iva-MY temp | EACH A A | 945 | $4.10 |
| 0660 | Inlaid pavement marker-B W/R | EACH A A | 2,046 | $18.50 |
| 0670 | Inlaid pavement marker-B Y/R | EACH A A | 42 | $18.50 |
| 0680 | Crash cushion TY 6 class T TL3 | EACH A A | 1 | $5,520.64 |
| 0690 | Fuel adjustment | DOLL A A | 136,540 | $1.00 |
| 0700 | Asphalt adjustment | DOLL A A | 333,817 | $1.00 |
| 0710 | Law enforcement officer | HOUR A A | 800 | $105.00 |
| 0720 | Guardrail thrie beam | LF A A | 3,035 | $65.61 |
| 0730 | G/R steel W beam-S face (7 FT post) | LF A A | 8,525 | $32.15 |
| 0740 | Pave mark thermo chevron | SQFT A A | 988 | $4.95 |
| 0750 | Pave mount infrared temp equipment | SF A A | 3,915,009 | $0.01 |
| 0760 | Queue protection vehicle | HOUR A A | 800 | $77.48 |
| 0770 | Thrie beam guardrail transition TL-3 | EACH A A | 74 | $6,312.36 |
| 0780 | Furnish queue protection vehicles | MONT A A | 16 | $7,018.25 |
| 0790 | Portable queue warning alert system | MONT A A | 16 | $1,314.28 |
| 0800 | Queue warning PCMS | MONT A A | 64 | $525.71 |
| 0810 | Queue warning portable radar sensors | MONT A A | 64 | $1.05 |
| 0820 | Mobilization for concrete surf treatment | LS A A | 1 | $10,479 |
| 0830 | Mobilization for concrete surf treatment | LS A A | 1 | $3,492.89 |
| 0840 | Thrie beam bullnose terminal | EACH A A | 36 | $25,300 |
| 0850 | Connected arrow panel | MONT A A | 16 | $696.82 |
| 0860 | Electronic delivery MGMT system - agg | LS A A | 1 | $6,488.79 |
| 0870 | Temporary silt fence | LF A A | 12,670 | $2.59 |
| 0880 | Culvert pipe-18 in | LF A A | 11 | $201.33 |
| 0890 | Culvert pipe-24 in | LF A A | 16 | $213.34 |
| 0900 | Culvert pipe-30 in | LF A A | 23 | $237.46 |
| 0910 | Storm sewer pipe-15 in | LF A A | 118 | $101.72 |
| 0920 | Storm sewer pipe-18 in | LF A A | 660 | $90.14 |
| 0930 | Storm sewer pipe-24 in | LF A A | 573 | $92.19 |
| 0940 | Remove pipe | LF A A | 444 | $21.55 |
| 0950 | S & F box inlet-outlet-18 in | EACH A A | 1 | $3,856.96 |
| 0960 | S & F box inlet-outlet-24 in | EACH A A | 1 | $5,181.97 |
| 0970 | S & F box inlet-outlet-30 in | EACH A A | 1 | $9,030.22 |
| 0980 | Drop box inlet type 5D | EACH A A | 5 | $12,080 |
| 0990 | Drop box inlet type 5D mod | EACH A A | 2 | $11,627 |
| 1000 | Junction box | EACH A A | 5 | $4,919.97 |
| 1010 | Fill and cap inlet | EACH A A | 5 | $2,978.98 |
| 1020 | Fabric-geotextile class 2 for pipe | SQYD A A | 2,219 | $2.00 |
| 1030 | Remove headwall | EACH A A | 7 | $944.76 |
| 1040 | Drainage junction box TY B | EACH A A | 2 | $4,854.60 |
| 1050 | Expan joint replace 4 in | LF A A | 76 | $650.00 |
| 1060 | Armored edge for concrete | LF A A | 76 | $350.00 |
| 1070 | Steel reinforcement | LB A A | 270 | $3.95 |
| 1080 | Epoxy sand slurry | SQYD A A | 126 | $83.60 |
| 1090 | Conc class M full depth patch | CUYD A A | 2 | $900.00 |
| 1100 | Concrete overlay-latex | CUYD A A | 36.70 | $1,990.00 |
| 1110 | Blast cleaning | SQYD A A | 1,006 | $10.25 |
| 1120 | Machine prep of slab | SQYD A A | 881 | $61.50 |
| 1130 | Partial depth patching | CUYD A A | 29 | $1,250.00 |
| 1140 | Bridge cleaning | LS A A | 1 | $8,000.00 |
| 1150 | Concrete coating | LS A A | 1 | $21,000 |
| 1160 | Bearing lubrication | EACH A A | 10 | $500.00 |
| 1170 | Remove concrete masonry | CUYD A A | 9 | $550.55 |
| 1180 | Concrete-class A | CUYD A A | 13 | $1,828.50 |
| 1190 | Steel reinforcement | LB A A | 911 | $2.53 |
| 1200 | Concrete sealing | SQFT A A | 576 | $3.76 |
| 1210 | Remove concrete masonry | CUYD A A | 9 | $514.51 |
| 1220 | Concrete-class A | CUYD A A | 13 | $1,828.50 |
| 1230 | Steel reinforcement | LB A A | 911 | $1.85 |
| 1240 | Concrete sealing | SQFT A A | 576 | $3.76 |
| 1250 | Remove concrete masonry | CUYD A A | 9 | $514.51 |
| 1260 | Concrete-class A | CUYD A A | 22 | $1,828.34 |
| 1270 | Steel reinforcement | LB A A | 1,737 | $1.85 |
| 1280 | Concrete sealing | SQFT A A | 864 | $3.76 |
| 1290 | Remove concrete masonry | CUYD A A | 9 | $514.51 |
| 1300 | Concrete-class A | CUYD A A | 13 | $1,828.50 |
| 1310 | Steel reinforcement | LB A A | 911 | $1.85 |
| 1320 | Concrete sealing | SQFT A A | 576 | $3.76 |
| 1330 | Remove concrete masonry | CUYD A A | 9 | $514.51 |
| 1340 | Concrete-class A | CUYD A A | 12 | $1,828.32 |
| 1350 | Steel reinforcement | LB A A | 926 | $1.85 |
| 1360 | Concrete sealing | SQFT A A | 576 | $3.76 |
| 1370 | Remove concrete masonry | CUYD A A | 9 | $514.51 |
| 1380 | Concrete-class A | CUYD A A | 13 | $1,828.50 |
| 1390 | Steel reinforcement | LB A A | 933 | $1.85 |
| 1400 | Concrete sealing | SQFT A A | 576 | $3.76 |
| 1410 | Remove concrete masonry | CUYD A A | 9 | $514.51 |
| 1420 | Concrete-class A | CUYD A A | 12 | $1,828.32 |
| 1430 | Steel reinforcement | LB A A | 926 | $1.85 |
| 1440 | Concrete sealing | SQFT A A | 576 | $3.76 |
| 1450 | Remove concrete masonry | CUYD A A | 9 | $514.51 |
| 1460 | Concrete-class A | CUYD A A | 12 | $1,828.32 |
| 1470 | Steel reinforcement | LB A A | 926 | $1.85 |
| 1480 | Concrete sealing | SQFT A A | 576 | $3.76 |
| 1490 | Conduit-1 1/4 in | LF A A | 160 | $8.25 |
| 1500 | Conduit-2 in | LF A A | 40 | $9.15 |
| 1510 | Trenching and backfilling | LF A A | 180 | $18.00 |
| 1520 | Piezoelectric sensor | EACH A A | 8 | $3,700.00 |
| 1530 | Loop wire | LF A A | 3,200 | $1.25 |
| 1540 | Loop saw slot and fill | LF A A | 720 | $29.25 |
| 1550 | Galvanized steel cabinet | EACH A A | 4 | $975.00 |
| 1560 | Wood post | EACH A A | 8 | $575.00 |
| 1570 | Electrical junction box type A | EACH A A | 4 | $2,100.00 |
| 1580 | Mobilization | LS A A | 1 | $628,000 |
| 1590 | Demobilization | LS A A | 1 | $315,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.