KYTC contract 25-1039 bid tabulation

BRIDGE WITH GRADE, DRAIN & SURFACE KY 115 STRUCTURE OVER I-24. Let by Kentucky Transportation Cabinet on December 11, 2025. 4 bids received; low bid $3,555,000 by Hall Contracting of Kentucky Inc, -5.3% against the engineer's estimate of $3,753,612.

Owner
Kentucky Transportation Cabinet
Letting
11 DEC 2025
Pay items
88
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Hall Contracting of Kentucky Inc$3,555,000Low-5.0%
2Ragle Inc$3,748,123+5.0%0.0%
3Jim Smith Contracting Company LLC$3,765,158+6.0%0.0%
4American Contracting & Services Inc$3,810,498+7.0%+2.0%
KYTC contract 25-1039: bids by rank

Engineer's estimate: $3,753,612.

Bid tabulation

LinePay itemUnitQuantity1. Hall Contracting of Kentucky Inc2. Ragle Inc3. Jim Smith Contracting Company LLC4. American Contracting & Services Inc
0010Crushed stone baseTON A A1,220$38.00$48.00$53.22$54.00
0020Asphalt seal aggregateTON A A12.20$443.00$275.00$443.00$450.00
0030Asphalt seal coatTON A A1.50$1,564.50$2,000.00$1,564.50$1,600.00
0040CL3 asph base 1.00D PG64-22TON A A142$196.20$175.00$196.20$200.00
0050CL3 asph base 1.00D PG76-22TON A A131$213.10$175.00$213.10$215.00
0060CL3 asph surf 0.50A PG76-22TON A A52$422.40$300.00$422.40$425.00
0070Asphalt material for tack non-trackingTON A A0.50$2,100.00$1,800.00$2,100.00$2,100.00
0080Crushed aggregate size no 2TON A A1,108$45.00$45.00$36.88$50.00
0090Perforated pipe-4 inLF A A200$13.00$20.00$20.53$30.00
0100Perforated pipe-6 inLF A A100$15.00$26.00$46.00$32.00
0110Non-perforated pipe-4 inLF A A64$18.00$27.00$37.17$75.00
0120Non-perforated pipe-6 inLF A A32$20.00$33.00$41.49$85.00
0130Inspect & certify edge drain systemLS A A1$3,000.00$1,500.00$2,500.00$2,500.00
0140Perf pipe headwall TY 1-4 inEACH A A4$700.00$1,750.00$897.12$2,400.00
0150Perf pipe headwall TY 4-6 inEACH A A4$900.00$1,650.00$959.20$2,500.00
0160Flume inlet type 2EACH A A2$6,000.00$6,300.00$8,200.00$4,000.00
0170Standard header curb modLF A A156$55.00$30.00$87.25$75.00
0180Delineator for guardrail BI directional whiteEACH A A12$15.52$15.50$15.52$20.00
0190Barricade-type IIIEACH A A22$80.00$275.00$471.22$200.00
0200Temp ditchLF A A446$2.00$2.00$0.50$7.00
0210Clean temp ditchLF A A223$1.00$1.50$0.25$6.00
0220Embankment in placeCUYD A A4,317$66.00$28.00$26.79$55.00
0230WaterMGAL A A8$1.00$50.00$77.60$1.00
0240Guardrail-steel W beam-S faceLF A A187.50$33.13$33.13$33.13$34.00
0250Guardrail end treatment type 1EACH A A2$3,551.47$3,551.47$3,551.47$3,600.00
0260Guardrail end treatment type 2MEACH A A2$1,912.36$1,912.36$1,912.36$2,000.00
0270Channel lining class IIITON A A346$50.00$57.14$46.64$70.00
0280Clearing and grubbingLS A A1$50,000$5,000.00$18,000$10,000
0290Temporary signsSQFT A A500$8.50$20.00$12.02$15.00
0300Fabric-geotextile class 1SQYD A A2,794$2.37$3.00$2.32$3.00
0310Fabric-geotextile class 1ASQYD A A1,122$4.62$3.00$4.42$3.30
0320Maintain & control trafficLS A A1$100,000$40,000$15,732$125,000
0330Portable changeable message signEACH A A6$4,200.00$10,500$1,264.13$4,900.00
0340Shoulder rumble stripsLF A A414$7.50$10.00$12.05$19.50
0350Temp silt fenceLF A A446$4.50$3.00$2.26$5.00
0360Silt trap type AEACH A A1$250.00$250.00$255.18$2,500.00
0370Silt trap type BEACH A A1$250.00$425.00$244.87$1,500.00
0380Silt trap type CEACH A A1$250.00$360.00$244.87$500.00
0390Clean silt trap type AEACH A A1$25.00$50.00$81.43$1,500.00
0400Clean silt trap type BEACH A A1$25.00$40.00$81.43$750.00
0410Clean silt trap type CEACH A A1$25.00$50.00$81.43$200.00
0420StakingLS A A1$75,000$40,000$12,077$20,000
0430Arrow panelEACH A A2$1,300.00$6,000.00$1,022.87$4,000.00
0440Conc barrier wall type 9TLF A A2,000$42.00$40.00$121.96$65.00
0450Erosion control blanketSQYD A A1,466$2.57$2.00$2.57$2.60
0460Temp mulchSQYD A A1,428$0.42$1.50$0.42$1.00
0470Temp seeding and protectionSQYD A A1,428$0.45$1.50$0.45$1.00
0480Initial fertilizerTON A A0.30$1,684.60$2,450.00$1,684.60$1,700.00
0490Maintenance fertilizerTON A A0.20$1,684.60$2,450.00$1,684.60$1,700.00
0500Seeding and protectionSQYD A A3,691$0.76$2.00$0.76$1.00
0510Agricultural limestoneTON A A0.20$89.01$2,100.00$89.00$100.00
0520Pave striping-temp paint-6 inLF A A1,000$1.25$2.50$1.25$1.25
0530Pave striping-thermo-6 in WLF A A251$6.00$6.00$6.00$6.00
0540Pave striping-thermo-6 in YLF A A177$6.00$6.00$6.00$6.00
0550Inlaid pavement marker-MWEACH A A3$300.00$160.00$700.00$500.00
0560Inlaid pavement marker-MYEACH A A3$300.00$160.00$700.00$500.00
0570Concrete-class ACUYD A A11.60$1,000.00$1,650.00$1,700.74$800.00
0580Steel reinforcementLB A A525$1.50$1.75$2.33$4.00
0590Crash cushion TY 6 class D TL3EACH A A1$50,000$66,567$66,567$67,000
0600Crash cushion TY 6 class T TL3EACH A A4$4,600.00$6,000.00$5,567.50$9,000.00
0610Temporary pipeLF A A100$60.00$50.00$65.91$60.00
0620Object marker TY 3EACH A A7$46.15$35.00$46.15$50.00
0630Remove crash cushionEACH A A1$3,000.00$750.00$2,500.00$2,500.00
0640Remove barrier wall transitionLS A A1$4,000.00$2,000.00$9,153.70$4,000.00
0650G/R steel W beam-S face (7 FT post)LF A A625$35.27$35.27$35.27$36.00
0660Water blasting existing stripeLF A A1,000$3.50$1.00$3.50$3.50
0670Turf reinforcement mat 1SQYD A A1,091$11.26$10.00$11.26$12.00
0680Pave stripe-perm paint-6 in wet ref-WLF A A310$9.00$9.00$2.00$9.00
0690Pave stripe-perm paint-6 in wet ref-YLF A A248$9.00$9.00$2.00$9.00
0700Thrie beam guardrail transition TL-2EACH A A4$4,500.00$3,054.79$3,142.04$3,100.00
0710Electronic delivery MGMT system - aggLS A A1$1.00$1.00$6,207.64$3,500.00
0720Structure granular backfillCUYD A A436$80.00$72.00$94.19$100.00
0730Armored edge for concreteLF A A65.60$100.00$95.00$69.84$130.00
0740Foundation preparationLS A A1$60,000$88,000$103,709$130,000
0750Crushed aggregate slope protTON A A365$52.00$50.00$44.90$90.00
0760Test pilesLF A A248$120.00$136.00$327.12$150.00
0770Piles-steel HP14X89LF A A2,087$120.00$145.00$114.17$120.00
0780Pile points-14 inEACH A A34$170.00$200.00$201.64$350.00
0790Concrete-class ACUYD A A233.10$950.00$1,400.00$1,202.01$730.00
0800Concrete-class AACUYD A A369.90$1,050.00$1,080.00$1,379.28$775.00
0810Steel reinforcementLB A A30,722$1.50$1.80$1.76$1.70
0820Steel reinforcement-epoxy coatedLB A A112,507$1.65$1.91$1.78$1.80
0830Concrete sealingSQFT A A19,410$1.20$1.45$2.14$3.00
0840PPC I-beam HN 48-49LF A A1,228$750.00$890.00$748.28$890.00
0850Rail system single slope - 40 inLF A A496$150.00$145.00$147.93$150.00
0860Mobilization for concrete surf treatmentLS A A1$2,000.00$150.00$33,213$5,000.00
0870MobilizationLS A A1$166,800$170,000$176,765$177,188
0880DemobilizationLS A A1$50,435$55,000$53,031$56,395
KYTC contract 25-1039: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of December 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy