KYTC contract 26-5407 bid tabulation
BRIDGE REPLACEMENT VARIOUS ROUTES IN GRAVES COUNTY. Let by Kentucky Transportation Cabinet on March 26, 2026. 4 bids received; low bid $1,199,980 by Jim Smith Contracting Company LLC, -19% against the engineer's estimate of $1,486,377.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 26 MAR 2026
- Pay items
- 37
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $1,199,980 | Low | -19% |
| 2 | Youngblood Excavating & Contracting LLC | $1,210,383 | +1.0% | -19% |
| 3 | Jave LLC | $1,321,519 | +10% | -11% |
| 4 | Hal Coffey Contracting LLC | $1,525,469 | +27% | +3.0% |
Engineer's estimate: $1,486,377.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC | 2. Youngblood Excavating & Contracting LLC | 3. Jave LLC | 4. Hal Coffey Contracting LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 160 | $40.00 | $45.00 | $104.50 | $45.00 |
| 0020 | CL2 asph base 1.00D PG64-22 | TON A A | 148.04 | $250.00 | $165.00 | $255.00 | $225.00 |
| 0030 | CL2 asph surf 0.38D PG64-22 | TON A A | 23.13 | $400.00 | $220.00 | $408.00 | $350.00 |
| 0040 | Asphalt material for tack | TON A A | 0.24 | $650.00 | $1,500.00 | $663.00 | $1,000.00 |
| 0050 | Delineator for guardrail BI directional white | EACH A A | 4 | $16.14 | $20.00 | $16.46 | $16.14 |
| 0060 | Barricade-type III | EACH A A | 4 | $250.00 | $200.00 | $102.00 | $350.00 |
| 0070 | Embankment in place | CUYD A A | 432 | $70.00 | $80.00 | $60.50 | $55.00 |
| 0080 | Structure granular backfill | CUYD A A | 115 | $87.91 | $80.00 | $108.90 | $165.00 |
| 0090 | Guardrail end treatment type 7 | EACH A A | 4 | $2,117.99 | $2,500.00 | $2,160.35 | $2,117.99 |
| 0100 | Right-of-way monument type 1 | EACH A A | 16 | $176.53 | $200.00 | $180.06 | $176.53 |
| 0110 | Witness post | EACH A A | 16 | $159.31 | $170.00 | $481.44 | $159.31 |
| 0120 | Clearing and grubbing | LS A A | 1 | $14,606 | $5,500.00 | $19,008 | $40,000 |
| 0130 | Temporary signs | SQFT A A | 70 | $8.20 | $27.00 | $10.20 | $30.00 |
| 0140 | Edge key | LF A A | 39 | $90.00 | $80.00 | $91.80 | $150.00 |
| 0150 | Maintain & control traffic | LS A A | 1 | $500.00 | $3,500.00 | $5,100.00 | $5,000.00 |
| 0160 | Portable changeable message sign | EACH A A | 3 | $5.00 | $2,400.00 | $3,405.78 | $200.00 |
| 0170 | Staking | LS A A | 1 | $5,000.00 | $5,000.00 | $7,150.00 | $15,000 |
| 0180 | Remove structure | LS A A | 1 | $39,865 | $20,000 | $76,431 | $110,000 |
| 0190 | Armored edge for concrete | LF A A | 50 | $64.80 | $100.00 | $108.90 | $100.00 |
| 0200 | Erosion control blanket | SQYD A A | 161 | $3.50 | $3.00 | $33.00 | $5.00 |
| 0210 | Pave striping-perm paint-4 in | LF A A | 492 | $1.00 | $3.50 | $3.21 | $5.00 |
| 0220 | Foundation preparation | LS A A | 1 | $27,561 | $60,000 | $79,860 | $18,000 |
| 0230 | Cyclopean stone rip rap | TON A A | 300 | $39.65 | $50.00 | $71.50 | $55.00 |
| 0240 | Test piles | LF A A | 255 | $290.62 | $175.00 | $173.17 | $350.00 |
| 0250 | Piles-steel HP14X89 | LF A A | 1,750 | $118.40 | $150.00 | $137.50 | $120.00 |
| 0260 | Concrete-class A | CUYD A A | 126 | $1,099.05 | $1,200.00 | $1,237.50 | $2,000.00 |
| 0270 | Concrete-class AA | CUYD A A | 46 | $2,689.38 | $1,900.00 | $1,614.80 | $2,000.00 |
| 0280 | Steel reinforcement | LB A A | 4,330 | $1.74 | $2.90 | $2.90 | $3.00 |
| 0290 | Steel reinforcement-epoxy coated | LB A A | 11,300 | $1.95 | $3.25 | $2.27 | $3.00 |
| 0300 | Precast PC box beam CB21-48 | LF A A | 672 | $364.22 | $400.00 | $345.96 | $475.00 |
| 0310 | Erosion control | LS A A | 1 | $6,000.00 | $3,500.00 | $8,580.00 | $7,500.00 |
| 0320 | G/R steel W beam-S face (7 FT post) | LF A A | 100 | $45.92 | $50.00 | $46.84 | $45.92 |
| 0330 | Concrete sealing | SQFT A A | 5,500 | $2.70 | $3.00 | $2.93 | $2.00 |
| 0340 | Rail system side mounted MGS | LF A A | 225 | $286.22 | $285.00 | $285.09 | $275.50 |
| 0350 | Mobilization for concrete surf treatment | LS A A | 1 | $3,176.30 | $1,400.00 | $3,850.00 | $1,500.00 |
| 0360 | Mobilization | LS A A | 1 | $56,336 | $12,000 | $61,570 | $71,200 |
| 0370 | Demobilization | LS A A | 1 | $16,902 | $18,001 | $18,620 | $30,145 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.