KYTC contract 25-1029 bid tabulation
PAVEMENT (WITH ALTERNATES) I-24. Let by Kentucky Transportation Cabinet on October 23, 2025. 1 bid received; low bid $34,120,981 by Jim Smith Contracting Company LLC, -29% against the engineer's estimate of $47,796,539.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 OCT 2025
- Pay items
- 109
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $34,120,981 | Low | -29% |
Engineer's estimate: $47,796,539.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC |
|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 157,147 | $33.50 |
| 0020 | Cement stabilized roadbed | SQYD A A | 243,861 | $2.80 |
| 0030 | Crushed aggregate size no 57 | TON A A | 100 | $45.00 |
| 0040 | Crushed aggregate size no 2 | TON A A | 350 | $35.95 |
| 0050 | Asphalt seal aggregate | TON A A | 1,918 | $86.75 |
| 0060 | Asphalt seal coat | TON A A | 230 | $267.73 |
| 0070 | Leveling & wedging PG64-22 | TON A A | 86 | $200.00 |
| 0080 | CL3 asph base 1.00D PG64-22 | TON A A | 21,150 | $88.00 |
| 0090 | CL4 asph base 1.00D PG64-22 | TON A A | 63,730 | $81.00 |
| 0100 | CL4 asph base 1.00D PG76-22 | TON A A | 29,017 | $89.00 |
| 0110 | CL3 asph surf 0.50D PG64-22 | TON A A | 5,158 | $105.00 |
| 0120 | CL4 asph surf 0.50A PG76-22 | TON A A | 14,826 | $125.00 |
| 0130 | Asphalt material for tack | TON A A | 407 | $700.00 |
| 0140 | Asphalt curing seal | TON A A | 488 | $800.00 |
| 0150 | Perforated pipe edge drain-6 in | LF A A | 105,153 | $9.25 |
| 0160 | Non-perforated pipe-6 in | LF A A | 3,788 | $23.60 |
| 0170 | Inspect & certify edge drain system | LS A A | 1 | $4,240.35 |
| 0180 | Inspect & certify edge drain system | LS A A | 1 | $43,598 |
| 0190 | Perf pipe headwall TY 1-6 in | EACH A A | 16 | $662.00 |
| 0200 | Perf pipe headwall TY 2-6 in | EACH A A | 6 | $678.00 |
| 0210 | Perf pipe headwall TY 3-6 in | EACH A A | 10 | $609.00 |
| 0220 | Perf pipe headwall TY 4-6 in | EACH A A | 318 | $591.95 |
| 0230 | Delineator for guardrail mono directional white | EACH A A | 168 | $15.78 |
| 0240 | Delineator for guardrail mono directional yello | EACH A A | 24 | $15.78 |
| 0250 | Relocate temp conc barrier | LF A A | 22,500 | $14.54 |
| 0260 | Barricade-type III | EACH A A | 26 | $400.00 |
| 0270 | Remove PCC pavement | SQYD A A | 237,608 | $11.75 |
| 0280 | Guardrail-steel W beam-S face | LF A A | 8,963 | $28.24 |
| 0290 | Guardrail end treatment type 1 | EACH A A | 1 | $3,532.73 |
| 0300 | Guardrail end treatment type 2M | EACH A A | 9 | $1,899.86 |
| 0310 | Remove guardrail con to BR end | EACH A A | 11 | $192.50 |
| 0320 | Guardrail end treatment type 3 | EACH A A | 6 | $1,914.47 |
| 0330 | Remove guardrail | LF A A | 9,030 | $3.71 |
| 0340 | Cement | TON A A | 4,741 | $230.00 |
| 0350 | Temporary signs | SQFT A A | 2,500 | $16.85 |
| 0360 | Maintain & control traffic | LS A A | 1 | $90,000 |
| 0370 | Maintain & control traffic | LS A A | 1 | $380,000 |
| 0380 | Truck mounted attenuator | EACH A A | 2 | $90,000 |
| 0390 | Crossover | LS A A | 1 | $105,000 |
| 0400 | Crossover | LS A A | 1 | $115,000 |
| 0410 | Crossover | LS A A | 1 | $75,000 |
| 0420 | Crossover | LS A A | 1 | $80,000 |
| 0430 | Portable changeable message sign | EACH A A | 4 | $21,000 |
| 0440 | Asphalt pave milling & texturing | TON A A | 707 | $65.00 |
| 0450 | Edgeline rumble strips | LF A A | 165,172 | $0.17 |
| 0460 | Temp silt fence | LF A A | 2,000 | $2.24 |
| 0470 | Sand for blotter | TON A A | 975 | $40.00 |
| 0480 | Silt trap type C | EACH A A | 8 | $150.00 |
| 0490 | Clean silt trap type C | EACH A A | 8 | $60.00 |
| 0500 | Staking | LS A A | 1 | $40,000 |
| 0510 | Staking | LS A A | 1 | $200,000 |
| 0520 | Relocate crash cushion | EACH A A | 4 | $3,451.16 |
| 0530 | Conc barrier wall type 9T | LF A A | 30,850 | $18.20 |
| 0540 | Temp seeding and protection | SQYD A A | 2,000 | $0.43 |
| 0550 | Initial fertilizer | TON A A | 0.20 | $1,383.47 |
| 0560 | Maintenance fertilizer | TON A A | 0.20 | $1,383.47 |
| 0570 | Seeding and protection | SQYD A A | 2,000 | $0.95 |
| 0580 | Agricultural limestone | TON A A | 1.40 | $95.72 |
| 0590 | Pave striping-temp paint-6 in | LF A A | 258,868 | $0.08 |
| 0600 | Pave striping-thermo-6 in W | LF A A | 56,092 | $0.75 |
| 0610 | Pave striping-thermo-6 in Y | LF A A | 44,141 | $0.75 |
| 0620 | Pave striping-thermo-12 in W | LF A A | 150 | $1.50 |
| 0630 | Pave striping-dur TY 1-6 in W | LF A A | 90,964 | $7.75 |
| 0640 | Pave striping-dur TY 1-6 in Y | LF A A | 72,460 | $7.75 |
| 0650 | Pavement marker TY iva-MW temp | EACH A A | 173 | $4.10 |
| 0660 | Pavement marker TY iva-MY temp | EACH A A | 173 | $4.10 |
| 0670 | Inlaid pavement marker-B W/R | EACH A A | 704 | $18.50 |
| 0680 | Crash cushion TY 6 class T TL3 | EACH A A | 4 | $6,182.88 |
| 0690 | Pavement adjustment | LS A A | 1 | $200,839 |
| 0700 | Pavement adjustment | LS A A | 1 | $2,961,983 |
| 0710 | Joint adhesive | LF A A | 56,275 | $0.50 |
| 0720 | Object marker TY 3 | EACH A A | 1 | $37.72 |
| 0730 | Law enforcement officer | HOUR A A | 1,200 | $105.00 |
| 0740 | Guardrail thrie beam | LF A A | 625 | $75.74 |
| 0750 | Water blasting existing stripe | LF A A | 258,868 | $0.35 |
| 0760 | High tension cable-rope barrier | LF A A | 600 | $15.00 |
| 0770 | End anchors | EACH A A | 2 | $13,163 |
| 0780 | Remove cable guardrail barrier system | LF A A | 337 | $2.86 |
| 0790 | Pave mount infrared temp equipment | SF A A | 2,180,136 | $0.02 |
| 0800 | Thrie beam guardrail transition TL-3 | EACH A A | 7 | $2,851.83 |
| 0810 | Portable queue warning alert system | MONT A A | 24 | $1,370.00 |
| 0820 | Queue warning PCMS | MONT A A | 180 | $500.00 |
| 0830 | Queue warning portable radar sensors | MONT A A | 180 | $0.01 |
| 0840 | Mobilization for concrete surf treatment | LS A A | 1 | $1,703.68 |
| 0850 | Thrie beam bullnose terminal | EACH A A | 6 | $26,222 |
| 0860 | Connected arrow panel | MONT A A | 45 | $684.96 |
| 0870 | Electronic delivery MGMT system - agg | LS A A | 1 | $2,200.00 |
| 0880 | Electronic delivery MGMT system - agg | LS A A | 1 | $2,200.00 |
| 1720 | Remove concrete masonry | CUYD A A | 15 | $600.00 |
| 1730 | Structure excavation-common | CUYD A A | 17 | $200.00 |
| 1740 | Concrete-class A | CUYD A A | 27 | $1,250.00 |
| 1750 | Steel reinforcement | LB A A | 1,583 | $2.25 |
| 1760 | Concrete sealing | SQFT A A | 1,488 | $3.00 |
| 1770 | Remove concrete masonry | CUYD A A | 15 | $600.00 |
| 1780 | Structure excavation-common | CUYD A A | 16 | $200.00 |
| 1790 | Concrete-class A | CUYD A A | 27 | $1,250.00 |
| 1800 | Steel reinforcement | LB A A | 1,583 | $2.25 |
| 1810 | Concrete sealing | SQFT A A | 1,474 | $3.00 |
| 1820 | Conduit-1 1/4 in | LF A A | 30 | $1.85 |
| 1830 | Conduit-2 in | LF A A | 10 | $3.15 |
| 1840 | Trenching and backfilling | LF A A | 35 | $18.75 |
| 1850 | Loop wire | LF A A | 800 | $2.15 |
| 1860 | Loop saw slot and fill | LF A A | 150 | $32.25 |
| 1870 | Galvanized steel cabinet | EACH A A | 1 | $950.00 |
| 1880 | Wood post | EACH A A | 2 | $495.00 |
| 1890 | Electrical junction box type A | EACH A A | 1 | $1,875.00 |
| 1900 | Trainee payment reimbursement | HOUR A A | 1,400 | $1.00 |
| 1910 | Mobilization | LS A A | 1 | $1,453,400 |
| 1920 | Demobilization | LS A A | 1 | $436,050 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.