KYTC contract 25-1012 bid tabulation
GRADE, DRAIN & SURFACE WITH BRIDGE NEW ROUTE. Let by Kentucky Transportation Cabinet on December 11, 2025. 2 bids received; low bid $15,543,899 by Jim Smith Contracting Company LLC, +0.1% against the engineer's estimate of $15,532,248.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 11 DEC 2025
- Pay items
- 125
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $15,543,899 | Low | 0.0% |
| 2 | Cleary Construction Inc | $22,290,000 | +43% | +44% |
Engineer's estimate: $15,532,248.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC | 2. Cleary Construction Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 13,863 | $34.00 | $34.00 |
| 0020 | Cement stabilized roadbed | SQYD A A | 18,877 | $5.65 | $6.25 |
| 0030 | Asphalt seal aggregate | TON A A | 113 | $95.65 | $115.00 |
| 0040 | Asphalt seal coat | TON A A | 13 | $1,042.00 | $1,100.00 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 602 | $105.00 | $125.00 |
| 0060 | CL2 asph base 1.00D PG64-22 | TON A A | 931 | $90.00 | $95.00 |
| 0070 | CL3 asph base 1.00D PG64-22 | TON A A | 4,836 | $90.00 | $95.00 |
| 0080 | CL2 asph surf 0.38D PG64-22 | TON A A | 483 | $105.00 | $98.00 |
| 0090 | CL3 asph surf 0.50D PG64-22 | TON A A | 1,468 | $105.00 | $98.00 |
| 0100 | Asphalt material for tack | TON A A | 16 | $900.00 | $200.00 |
| 0105 | Asphalt curing seal | TON A A | 18.90 | $750.00 | $845.00 |
| 0110 | JPC pavement-8 in | SQYD A A | 3,255 | $98.78 | $110.64 |
| 0120 | Cement | TON A A | 415 | $245.00 | $245.00 |
| 0130 | Mobilization for mill & text | LS A A | 1 | $3,500.00 | $3,500.00 |
| 0140 | Asphalt pave milling & texturing | TON A A | 10 | $400.00 | $100.00 |
| 0145 | Sand for blotter | TON A A | 47.20 | $95.87 | $50.00 |
| 0150 | Joint adhesive | LF A A | 13,981 | $0.75 | $0.75 |
| 0160 | Longitudinal edge key | LF A A | 2,060 | $10.00 | $4.00 |
| 0170 | Longitudinal saw cut | LF A A | 2,430 | $6.14 | $2.00 |
| 0180 | Drainage blanket-embankment | CUYD A A | 3,100 | $66.38 | $65.00 |
| 0190 | Crushed aggregate size no 2 | TON A A | 4 | $98.52 | $500.00 |
| 0200 | Crushed aggregate size no 23 | TON A A | 1,900 | $32.90 | $39.00 |
| 0210 | Perforated pipe-4 in | LF A A | 273 | $15.72 | $23.69 |
| 0220 | Non-perforated pipe-4 in | LF A A | 40 | $36.25 | $34.02 |
| 0230 | Inspect & certify edge drain system | LS A A | 1 | $2,500.00 | $2,500.00 |
| 0240 | Perf pipe headwall TY 3-4 in | EACH A A | 4 | $1,754.15 | $1,504.96 |
| 0250 | Flume inlet type 2 | EACH A A | 9 | $7,125.00 | $4,722.66 |
| 0260 | Delineator for guardrail BI directional white | EACH A A | 92 | $13.73 | $13.73 |
| 0270 | Temp ditch | LF A A | 4,243 | $0.40 | $1.00 |
| 0280 | Clean temp ditch | LF A A | 2,122 | $0.18 | $0.01 |
| 0290 | Embankment in place | CUYD A A | 351,990 | $11.93 | $28.00 |
| 0300 | Water | MGAL A A | 50 | $118.00 | $0.01 |
| 0310 | Guardrail-steel W beam-S face | LF A A | 4,200 | $27.09 | $27.09 |
| 0320 | Guardrail terminal section no 1 | EACH A A | 1 | $86.11 | $86.11 |
| 0330 | Guardrail end treatment type 1 | EACH A A | 3 | $3,403.83 | $3,403.83 |
| 0340 | Guardrail end treatment type 2A | EACH A A | 4 | $1,795.72 | $1,795.72 |
| 0350 | Right-of-way monument type 1 | EACH A A | 58 | $140.00 | $145.46 |
| 0360 | Witness post | EACH A A | 58 | $125.00 | $128.24 |
| 0370 | Channel lining class II | TON A A | 185 | $38.00 | $65.00 |
| 0380 | Channel lining class III | TON A A | 683 | $34.00 | $70.00 |
| 0390 | Clearing and grubbing | LS A A | 1 | $575,000 | $185,000 |
| 0400 | Temporary signs | SQFT A A | 500 | $13.58 | $6.00 |
| 0410 | Edge key | LF A A | 61 | $89.79 | $65.00 |
| 0420 | Fabric-geotextile class 1 | SQYD A A | 18,750 | $2.05 | $2.50 |
| 0430 | Fabric-geotextile class 2 | SQYD A A | 3,570 | $1.73 | $2.75 |
| 0440 | Maintain & control traffic | LS A A | 1 | $80,000 | $165,000 |
| 0450 | Portable changeable message sign | EACH A A | 2 | $2,500.00 | $9,646.00 |
| 0460 | Edgeline rumble strips | LF A A | 2,062 | $2.12 | $1.90 |
| 0470 | Temp silt fence | LF A A | 4,243 | $2.15 | $2.11 |
| 0480 | Silt trap type A | EACH A A | 9 | $125.00 | $290.00 |
| 0490 | Silt trap type B | EACH A A | 9 | $125.00 | $155.00 |
| 0500 | Silt trap type C | EACH A A | 9 | $125.00 | $280.00 |
| 0510 | Clean silt trap type A | EACH A A | 9 | $50.00 | $1.00 |
| 0520 | Clean silt trap type B | EACH A A | 9 | $50.00 | $1.00 |
| 0530 | Clean silt trap type C | EACH A A | 9 | $50.00 | $1.00 |
| 0540 | Staking | LS A A | 1 | $100,000 | $120,000 |
| 0550 | Prefabricated wick drain | LF A A | 85,200 | $31.19 | $30.07 |
| 0560 | Temp signal 2 phase | EACH A A | 3 | $1,500.00 | $40,000 |
| 0570 | Erosion control blanket | SQYD A A | 11,641 | $3.75 | $1.73 |
| 0580 | Temp mulch | SQYD A A | 83,345 | $0.40 | $0.28 |
| 0590 | Temp seeding and protection | SQYD A A | 62,509 | $0.48 | $0.34 |
| 0600 | Initial fertilizer | TON A A | 3 | $1,400.00 | $1,032.00 |
| 0610 | Maintenance fertilizer | TON A A | 4 | $1,400.00 | $1,032.00 |
| 0620 | Seeding and protection | SQYD A A | 64,393 | $0.65 | $0.54 |
| 0630 | Agricultural limestone | TON A A | 78 | $900.00 | $99.00 |
| 0640 | Flexible delineator post-B/W | EACH A A | 75 | $69.78 | $69.78 |
| 0650 | Pave striping-thermo-6 in W | LF A A | 21,165 | $0.75 | $1.00 |
| 0660 | Pave striping-thermo-6 in Y | LF A A | 12,717 | $0.75 | $1.00 |
| 0670 | Pave striping-thermo-12 in W | LF A A | 250 | $1.00 | $1.50 |
| 0680 | Pave striping-temp rem tape-B | LF A A | 2,400 | $2.00 | $1.50 |
| 0690 | Pave striping-temp rem tape-W | LF A A | 2,400 | $2.00 | $1.50 |
| 0700 | Pave striping-temp rem tape-Y | LF A A | 2,400 | $2.00 | $1.50 |
| 0710 | Pave striping-dur TY 1-6 in W | LF A A | 624 | $10.00 | $7.50 |
| 0720 | Pave striping-dur TY 1-6 in Y | LF A A | 624 | $10.00 | $7.50 |
| 0730 | Pave marking-thermo stop bar-24IN | LF A A | 24 | $4.00 | $10.00 |
| 0740 | Pave marking-thermo curv arrow | EACH A A | 9 | $70.00 | $90.00 |
| 0750 | Pave marking-thermo only | EACH A A | 2 | $250.00 | $100.00 |
| 0760 | Inlaid pavement marker-MW | EACH A A | 25 | $20.00 | $22.50 |
| 0770 | Inlaid pavement marker-by | EACH A A | 109 | $20.00 | $22.50 |
| 0780 | Fuel adjustment | DOLL A A | 81,694 | $1.00 | $1.00 |
| 0790 | Asphalt adjustment | DOLL A A | 32,536 | $1.00 | $1.00 |
| 0800 | Object marker TY 3 | EACH A A | 3 | $28.37 | $28.37 |
| 0810 | Centerline rumble strips | LF A A | 1,030 | $2.25 | $2.25 |
| 0820 | Concrete wedge curb | LF A A | 2,870 | $16.30 | $10.63 |
| 0830 | Pave mark thermo chevron | SQFT A A | 662 | $3.00 | $5.00 |
| 0840 | Thrie beam guardrail transition TL-2 | EACH A A | 4 | $5,853.13 | $5,445.63 |
| 0850 | Electronic delivery MGMT system - agg | LS A A | 1 | $2,949.99 | $1.00 |
| 0860 | Entrance pipe-15 in | LF A A | 304 | $51.40 | $95.00 |
| 0870 | Entrance pipe-18 in | LF A A | 88 | $61.00 | $120.00 |
| 0880 | Culvert pipe-18 in | LF A A | 317 | $87.61 | $135.00 |
| 0890 | Culvert pipe-24 in | LF A A | 53 | $110.30 | $225.00 |
| 0900 | Culvert pipe-30 in | LF A A | 188 | $133.29 | $120.00 |
| 0910 | Pipe culvert headwall-30 in | EACH A A | 2 | $3,877.57 | $3,750.00 |
| 0920 | Sloped box outlet type 1-18 in | EACH A A | 9 | $3,514.94 | $3,500.00 |
| 0930 | Sloped box outlet type 1-24 in | EACH A A | 2 | $4,149.86 | $5,000.00 |
| 0940 | S & F box inlet-outlet-18 in | EACH A A | 1 | $3,325.80 | $4,500.00 |
| 0950 | Junction box | EACH A A | 1 | $2,632.67 | $3,500.00 |
| 0960 | Fabric-geotextile class 2 for pipe | SQYD A A | 2,407 | $2.00 | $2.00 |
| 0970 | Pipe culvert headwall-54 in | EACH A A | 2 | $7,983.46 | $10,000 |
| 0980 | Steel encasement pipe | LF A A | 309 | $752.94 | $765.00 |
| 0985 | Granular embankment | CUYD A A | 465 | $60.00 | $90.00 |
| 0990 | Structure granular backfill | CUYD A A | 251 | $78.44 | $90.00 |
| 1000 | Settlement platform | EACH A A | 2 | $14,491 | $2,500.00 |
| 1010 | Armored edge for concrete | LF A A | 264 | $94.25 | $125.00 |
| 1020 | Steel pipe-2 1/2 in | LF A A | 84 | $75.20 | $40.00 |
| 1030 | Steel pipe-4 in | LF A A | 84 | $94.76 | $50.00 |
| 1040 | Foundation preparation | LS A A | 1 | $28,706 | $135,000 |
| 1050 | Crushed aggregate slope prot | TON A A | 463 | $44.03 | $60.00 |
| 1060 | Test piles | LF A A | 340 | $347.11 | $500.00 |
| 1070 | Piles-steel HP14X89 | LF A A | 5,572 | $105.06 | $125.00 |
| 1080 | Concrete-class A | CUYD A A | 277 | $1,126.18 | $1,275.00 |
| 1090 | Concrete-class AA | CUYD A A | 433 | $1,242.46 | $1,250.00 |
| 1100 | Steel reinforcement | LB A A | 55,360 | $1.93 | $2.55 |
| 1110 | Steel reinforcement-epoxy coated | LB A A | 125,420 | $1.93 | $2.15 |
| 1120 | Approach slab | SQYD A A | 200 | $573.35 | $850.00 |
| 1130 | Precast PC I beam type 5 | LF A A | 1,407 | $636.64 | $995.00 |
| 1140 | Concrete sealing | SQFT A A | 27,350 | $2.35 | $2.00 |
| 1150 | Protective fence | LF A A | 540 | $102.00 | $195.00 |
| 1160 | Rail system single slope - 40 in | LF A A | 572 | $108.59 | $165.00 |
| 1170 | Mobilization for concrete surf treatment | LS A A | 1 | $2,088.58 | $950.00 |
| 1180 | Foundation preparation | LS A A | 1 | $40,180 | $25,000 |
| 1190 | Concrete-class A | CUYD A A | 211 | $1,186.00 | $975.00 |
| 1200 | Steel reinforcement | LB A A | 32,487 | $1.60 | $1.65 |
| 1210 | Mobilization | LS A A | 1 | $724,397 | $1,035,000 |
| 1220 | Demobilization | LS A A | 1 | $217,320 | $313,975 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of December 11, 2025. Compiled by Mirage Metrics.