KYTC contract 26-4512 bid tabulation
ASPHALT PAVEMENT & ROADWAY REHAB BENTON ROAD (US 68). Let by Kentucky Transportation Cabinet on May 21, 2026. 1 bid received; low bid $3,631,783 by Jim Smith Contracting Company LLC, +1.0% against the engineer's estimate of $3,594,423.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 21 MAY 2026
- Pay items
- 104
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jim Smith Contracting Company LLC | $3,631,783 | Low | +1.0% |
Engineer's estimate: $3,594,423.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jim Smith Contracting Company LLC |
|---|---|---|---|---|
| 0010 | Dga base | TON A A | 283 | $70.00 |
| 0020 | Asphalt seal aggregate | TON A A | 27.54 | $274.50 |
| 0030 | Asphalt seal coat | TON A A | 3.32 | $1,300.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 34 | $120.00 |
| 0050 | CL3 asph base 1.00D PG76-22 | TON A A | 1,537 | $120.00 |
| 0060 | CL2 asph surf 0.50D PG64-22 | TON A A | 255 | $115.00 |
| 0070 | CL3 asph surf 0.50B PG76-22 | TON A A | 2,692 | $120.00 |
| 0080 | Asphalt material for tack | TON A A | 16.40 | $675.00 |
| 0090 | Mobilization for mill & text | LS A A | 1 | $5,000.00 |
| 0100 | Asphalt pave milling & texturing | TON A A | 3,275 | $20.00 |
| 0110 | Fiber reinforcement for HMA | TON A A | 3,762 | $7.50 |
| 0120 | Island curb and gutter | LF A A | 3,566 | $110.00 |
| 0130 | Standard header curb | LF A A | 2,723 | $110.00 |
| 0140 | Island header curb type 2 | LF A A | 978 | $110.00 |
| 0150 | Remove curb | LF A A | 377 | $30.00 |
| 0160 | Mountable median type 3 | SQYD A A | 157 | $465.00 |
| 0170 | Delineator for G/R mono directional white | EACH A A | 10 | $15.11 |
| 0180 | Delineator for G/R mono directional yellow | EACH A A | 12 | $15.11 |
| 0190 | Barricade-type III | EACH A A | 8 | $350.00 |
| 0200 | Remove pavement | SQYD A A | 4,914 | $14.00 |
| 0210 | Temp ditch | LF A A | 2,074 | $0.44 |
| 0220 | Clean temp ditch | LF A A | 1,037 | $0.20 |
| 0230 | Embankment in place | CUYD A A | 5,439 | $40.00 |
| 0240 | G/R-W beam-S face TL-3 | LF A A | 462.50 | $34.67 |
| 0250 | G/R end treatment type 1 | EACH A A | 2 | $3,592.86 |
| 0260 | Remove G/R | LF A A | 1,287.50 | $3.51 |
| 0270 | Temporary signs | SQFT A A | 500 | $32.00 |
| 0280 | Maintain & control traffic | LS A A | 1 | $180,000 |
| 0290 | Truck mounted attenuator | EACH A A | 4 | $12,000 |
| 0300 | Portable changeable message sign | EACH A A | 2 | $4,000.00 |
| 0310 | Edgeline rumble strips | LF A A | 7,615 | $0.95 |
| 0320 | Temp silt fence | LF A A | 2,074 | $2.00 |
| 0330 | Silt trap type B | EACH A A | 3 | $200.00 |
| 0340 | Silt trap type C | EACH A A | 15 | $200.00 |
| 0350 | Clean silt trap type B | EACH A A | 3 | $75.00 |
| 0360 | Clean silt trap type C | EACH A A | 15 | $75.00 |
| 0370 | Staking | LS A A | 1 | $135,000 |
| 0380 | Arrow panel | EACH A A | 2 | $3,500.00 |
| 0390 | Erosion control blanket | SQYD A A | 5,290 | $3.50 |
| 0400 | Temp mulch | SQYD A A | 17,747 | $0.40 |
| 0410 | Temp seeding and protection | SQYD A A | 13,310 | $0.45 |
| 0420 | Initial fertilizer | TON A A | 0.60 | $1,200.00 |
| 0430 | Maintenance fertilizer | TON A A | 0.40 | $1,200.00 |
| 0440 | Seeding and protection | SQYD A A | 5,009 | $0.84 |
| 0450 | Sodding | SQYD A A | 1,419 | $7.28 |
| 0460 | Agricultural limestone | TON A A | 7 | $950.00 |
| 0470 | Topsoil furnished and placed | CUYD A A | 1,092 | $85.00 |
| 0480 | Pave striping-temp paint-6 in | LF A A | 1,000 | $0.10 |
| 0490 | Pave striping-thermo-6 in W | LF A A | 13,699 | $0.70 |
| 0500 | Pave striping-thermo-6 in Y | LF A A | 9,318 | $0.70 |
| 0510 | Pave striping-thermo-12 in W | LF A A | 2,134 | $1.25 |
| 0520 | Pave striping-thermo-12 in Y | LF A A | 105 | $1.25 |
| 0530 | Pave striping-dur TY 1-6 in W | LF A A | 575 | $5.25 |
| 0540 | Pave striping-dur TY 1-6 in Y | LF A A | 460 | $5.25 |
| 0550 | Pave marking-thermo stop bar-24IN | LF A A | 46 | $6.75 |
| 0560 | Pave marking-thermo cross-hatch | SQFT A A | 648 | $1.85 |
| 0570 | Pave marking-thermo curv arrow | EACH A A | 14 | $45.00 |
| 0580 | Pave marking-thermo comb arrow | EACH A A | 3 | $85.00 |
| 0590 | Pave marking-thermo only | EACH A A | 3 | $190.00 |
| 0600 | Pave marking-thermo merge arrow | EACH A A | 2 | $190.00 |
| 0610 | Inlaid pavement marker-MW | EACH A A | 66 | $17.00 |
| 0620 | Inlaid pavement marker-MY | EACH A A | 4 | $17.00 |
| 0630 | Inlaid pavement marker-by | EACH A A | 11 | $17.00 |
| 0640 | Inlaid pavement marker-B W/R | EACH A A | 32 | $17.00 |
| 0650 | Concrete-class A | CUYD A A | 1.13 | $2,400.00 |
| 0660 | Fuel adjustment | DOLL A A | 7,058 | $1.00 |
| 0670 | Asphalt adjustment | DOLL A A | 17,728 | $1.00 |
| 0680 | Sawcut pavement | LF A A | 8,397 | $2.25 |
| 0690 | Shoulder milling/trenching | SQYD A A | 2,425 | $16.50 |
| 0700 | Remove traffic island | SQYD A A | 1,242 | $90.00 |
| 0710 | Pave marking-thermo yield bar-36 in | LF A A | 88 | $9.75 |
| 0720 | Water blasting existing stripe | LF A A | 1,035 | $0.50 |
| 0730 | Pavement marking-thermo letters | EACH A A | 36 | $42.50 |
| 0740 | Stamped concrete | SQYD A A | 713 | $295.00 |
| 0750 | Pave mark-thermo-yield | EACH A A | 8 | $195.00 |
| 0760 | Roundabout arrow | EACH A A | 10 | $250.00 |
| 0770 | Roundabout arrow | EACH A A | 8 | $250.00 |
| 0780 | Concrete island | SQYD A A | 162 | $235.00 |
| 0790 | Pave mark thermo chevron | SQFT A A | 142 | $1.70 |
| 0800 | Pave marking-thermo elong route shield | EACH A A | 8 | $1,300.00 |
| 0810 | Thrie beam G/R transition TL-3 | EACH A A | 6 | $3,857.68 |
| 0820 | Thrie beam bullnose terminal | EACH A A | 2 | $25,457 |
| 0830 | Modified thrie beam (bullnose) | LF A A | 435 | $74.51 |
| 0840 | Culvert pipe-18 in | LF A A | 6 | $295.00 |
| 0850 | Remove pipe | LF A A | 16 | $10.00 |
| 0860 | Curb box inlet type A | EACH A A | 1 | $12,900 |
| 0870 | Remove curb & gutter box inlet | EACH A A | 2 | $2,500.00 |
| 0880 | SBM alum sheet signs .080 in | SQFT A A | 294.50 | $46.99 |
| 0890 | SBM alum sheet signs .125 in | SQFT A A | 104.37 | $48.64 |
| 0900 | Steel post type 1 | LF A A | 642 | $28.36 |
| 0910 | Class A concrete for signs | CUYD A A | 1.25 | $3,614.53 |
| 0920 | Remove sign | EACH A A | 56 | $95.24 |
| 0930 | GMSS type D | EACH A A | 5 | $554.42 |
| 0940 | GMSS type D | EACH A A | 3 | $488.44 |
| 0950 | Barcode sign inventory | EACH A A | 84 | $47.62 |
| 0960 | Conduit-3 in | LF A A | 2,460 | $24.50 |
| 0970 | Marker | EACH A A | 12 | $616.00 |
| 0980 | Trenching and backfilling | LF A A | 11,788 | $13.50 |
| 0990 | Cable-no. 6/3C ducted | LF A A | 8,810 | $7.45 |
| 1000 | Cable-no. 4/3C ducted | LF A A | 6,074 | $8.75 |
| 1010 | Remove lighting | LS A A | 1 | $45,000 |
| 1020 | EC directional bore | LF A A | 2,346 | $16.55 |
| 1030 | Electrical junction box type A | EACH A A | 17 | $1,750.00 |
| 1040 | Demobilization | LS A A | 1 | $53,675 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 21, 2026. Compiled by Mirage Metrics.