Judy C Harp Company Inc: KYTC bid record
Judy C Harp Company Inc submitted 14 bids on Kentucky Transportation Cabinet contracts in the data, from 21 FEB 2020 to 23 JUL 2026, and was the low bidder on 5 of them (36%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $1,877,801
- Latest bid
- 23 JUL 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 0 | 0% |
| 2021 | 2 | 1 | 50% |
| 2023 | 2 | 2 | 100% |
| 2024 | 3 | 1 | 33% |
| 2025 | 2 | 0 | 0% |
| 2026 | 2 | 1 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 3 | 2 | 67% |
| District 7 | 3 | 1 | 33% |
| District 1 | 2 | 0 | 0% |
| District 11 | 1 | 0 | 0% |
| District 4 | 1 | 0 | 0% |
| District 6 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Retrofit | EACH | 10 | 9 (90%) | $1,477.50 | $2,850.00 | |
| Steel repair | EACH | 19 | 6 (32%) | $10,000 | $21,000 | |
| Portable changeable message sign | EACH | 6 | 1 (17%) | $3,250.00 | $1,750.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Intech Contracting LLC | 12 | 5 of 12 |
| M & M Services Co Inc | 8 | 3 of 8 |
| Evers Steel Construction LLC | 4 | 0 of 4 |
| Hall Contracting of Kentucky Inc | 4 | 2 of 4 |
| American Contracting & Services Inc | 3 | 1 of 3 |
| Delong Concrete LLC | 3 | 1 of 3 |
| Kay & Kay Contracting LLC | 2 | 1 of 2 |
| Louisville Paving Company Inc | 2 | 1 of 2 |
| Jave LLC | 2 | 0 of 2 |
| Mac Construction & Excavating Inc | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 JUL 2026 | 26-2905 | BRIDGE REPAIRS US 31W (S DIXIE HIGHWAY) | 1 of 4 | $658,014 | Low, 12% under the second | |
| 23 APR 2026 | 26-5412 | BRIDGE REPAIRS KY 56 | 3 of 5 | $592,358 | +17% | |
| 21 AUG 2025 | 25-2981 | BRIDGE SUPERSTRUCTURE REPLACEMENT SOUTH PROPERTY ROAD (KY 573) | 3 of 5 | $371,776 | +14% | |
| 23 JAN 2025 | 25-2961 | District 7 | BRIDGE REPAIRS CARY MILL ROAD (CR 1213) | 3 of 6 | $122,982 | +17% |
| 12 DEC 2024 | 24-2945 | District 7 | BRIDGE BEARING REPAIR WINCHESTER ROAD (KY 89) | 3 of 5 | $110,331 | +23% |
| 24 OCT 2024 | 24-2956 | District 1 | BRIDGE STEEL REPAIRS CERULEAN ROAD (KY 124) | 2 of 3 | $266,836 | +7.0% |
| 20 JUN 2024 | 24-2961 | District 6 | BRIDGE STEEL REPAIRS PRESTONVILLE - CARROLLTON ROAD (KY 42) | 1 of 5 | $119,897 | Low, 80% under the second |
| 24 AUG 2023 | 23-2991 | District 5 | BRIDGE STEEL REPAIRS SECOND STREET (US 31) | 1 of 3 | $210,663 | Low, 117% under the second |
| 20 JUL 2023 | 23-5314 | District 7 | BRIDGE REPAIRS HYATT ROAD OVER CROOKED CREEK | 1 of 3 | $744,919 | Low, 16% under the second |
| 20 AUG 2021 | 21-2972 | District 1 | BRIDGE STEEL REPAIRS PADUCAH - EDDYVILLE ROAD (US 62) | 2 of 2 | $77,155 | +39% |
| 29 JAN 2021 | 21-2601 | District 5 | BRIDGE STEEL REPAIRS US 60X (MP 0.037) - SINGING BRIDGE RETROFITS. | 1 of 4 | $144,308 | Low, 23% under the second |
| 20 NOV 2020 | 20-5188 | District 4 | BRIDGE SUPERSTRUCTURE REPLACEMENT WATSON SCHOOL ROAD | 7 of 10 | $236,460 | +33% |
| 25 SEP 2020 | 20-1031 | District 5 | BRIDGE REPAIRS I-65 BRIDGE AT SOUTH BROOK ST. | 2 of 9 | $155,295 | +13% |
| 21 FEB 2020 | 20-2902 | District 11 | BRIDGE STEEL REPAIRS I-75 OVER LYNN CAMP CREEK MP 27.92 | 3 of 3 | $1,166,660 | +160% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.