KYTC contract 26-5412 bid tabulation
BRIDGE REPAIRS KY 56. Let by Kentucky Transportation Cabinet on April 23, 2026. 5 bids received; low bid $505,868 by Intech Contracting LLC, +1.0% against the engineer's estimate of $500,779.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 APR 2026
- Pay items
- 19
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Intech Contracting LLC | $505,868 | Low | +1.0% |
| 2 | American Contracting & Services Inc | $548,268 | +8.0% | +9.0% |
| 3 | Judy C Harp Company Inc | $592,358 | +17% | +18% |
| 4 | Hall Contracting of Kentucky Inc | $810,000 | +60% | +62% |
| 5 | M & M Services Co Inc | $1,757,012 | +247% | +251% |
Engineer's estimate: $500,779.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Intech Contracting LLC | 2. American Contracting & Services Inc | 3. Judy C Harp Company Inc | 4. Hall Contracting of Kentucky Inc | 5. M & M Services Co Inc |
|---|---|---|---|---|---|---|---|---|
| 0010 | Barricade-type III | EACH A A | 2 | $750.00 | $500.00 | $300.00 | $200.00 | $300.00 |
| 0020 | Clearing and grubbing | LS A A | 1 | $5,500.00 | $10,000 | $1,500.00 | $50,000 | $35,000 |
| 0030 | Temporary signs | SQFT A A | 84 | $15.00 | $50.00 | $50.00 | $20.00 | $15.00 |
| 0040 | Maintain & control traffic | LS A A | 1 | $83,000 | $15,000 | $20,000 | $100,000 | $95,000 |
| 0050 | Lane closure | EACH A A | 1 | $2,500.00 | $7,500.00 | $7,500.00 | $3,000.00 | $15,000 |
| 0060 | Staking | LS A A | 1 | $500.00 | $7,000.00 | $2,000.00 | $10,000 | $6,900.00 |
| 0070 | Temp signal 2 phase | EACH A A | 2 | $2,500.00 | $6,500.00 | $3,500.00 | $4,000.00 | $8,500.00 |
| 0080 | Pave striping-temp paint-4 in | LF A A | 2,000 | $1.00 | $1.00 | $0.75 | $0.75 | $2.00 |
| 0090 | Erosion control | LS A A | 1 | $500.00 | $8,000.00 | $2,850.00 | $35,000 | $9,800.00 |
| 0100 | Jack & support bridge span | LS A A | 1 | $55,000 | $72,000 | $190,000 | $200,000 | $175,000 |
| 0110 | Bearing replacement | EACH A A | 2 | $43,500 | $30,000 | $55,000 | $30,000 | $265,000 |
| 0120 | Concrete patching repair | SQFT A A | 120 | $379.00 | $450.00 | $350.00 | $350.00 | $650.00 |
| 0130 | Pave mark temp paint stop bar-24 in | LF A A | 24 | $10.00 | $50.00 | $25.00 | $25.00 | $25.00 |
| 0140 | Epoxy injection crack repair | LF A A | 200 | $55.00 | $80.00 | $68.00 | $215.00 | $190.00 |
| 0150 | Steel repair | EACH A A | 1 | $73,000 | $55,000 | $21,000 | $40,000 | $80,000 |
| 0160 | Steel repair | EACH A A | 2 | $2,000.00 | $10,000 | $10,000 | $7,000.00 | $90,000 |
| 0170 | Steel repair | EACH A A | 6 | $12,000 | $20,000 | $12,000 | $11,000 | $55,000 |
| 0180 | Concrete coating | SQFT A A | 6,114 | $8.00 | $12.00 | $11.00 | $20.00 | $22.00 |
| 0190 | Demobilization | LS A A | 1 | $7,475.88 | $9,000.00 | $8,754.06 | $12,540 | $26,344 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.