Evers Steel Construction LLC: KYTC bid record
Evers Steel Construction LLC submitted 10 bids on Kentucky Transportation Cabinet contracts in the data, from 25 SEP 2020 to 24 OCT 2024, and was the low bidder on 1 of them (10%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $438,582
- Latest bid
- 24 OCT 2024
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2024 | 5 | 1 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 4 | 0 | 0% |
| District 6 | 4 | 0 | 0% |
| District 4 | 1 | 0 | 0% |
| District 11 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Steel repair | EACH | 42 | 18 (43%) | $130,000 | $21,000 | |
| Portable changeable message sign | EACH | 5 | 3 (60%) | $3,000.00 | $1,750.00 | |
| Retrofit | EACH | 10 | 1 (10%) | $1,850.00 | $2,850.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Intech Contracting LLC | 7 | 3 of 7 |
| M & M Services Co Inc | 6 | 4 of 6 |
| Judy C Harp Company Inc | 4 | 4 of 4 |
| Southern Road & Bridge LLC | 4 | 1 of 4 |
| Advantage Steel & Construction LLC | 2 | 1 of 2 |
| Louisville Paving Company Inc | 1 | 1 of 1 |
| Mac Construction & Excavating Inc | 1 | 0 of 1 |
| Kay & Kay Contracting LLC | 1 | 0 of 1 |
| American Contracting & Services Inc | 1 | 0 of 1 |
| C J Mahan Construction Company LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 OCT 2024 | 24-2959 | District 6 | BRIDGE STEEL REPAIRS COVINGTON-CINCINNATI ROAD (I-275) | 3 of 3 | $3,862,757 | +71% |
| 20 JUN 2024 | 24-2961 | District 6 | BRIDGE STEEL REPAIRS PRESTONVILLE - CARROLLTON ROAD (KY 42) | 2 of 5 | $216,096 | +80% |
| 20 JUN 2024 | 24-2960 | District 11 | BRIDGE STEEL REPAIRS DANIEL BOONE PARKWAY (PW9006) | 1 of 3 | $438,582 | Low, 12% under the second |
| 23 MAY 2024 | 24-2992 | District 6 | BRIDGE STEEL REPAIRS CARROL CROPPER BRIDGE (I-275) | 2 of 5 | $3,796,951 | +5.0% |
| 25 APR 2024 | 24-2988 | District 5 | BRIDGE REPAIR MISCELLANEOUS WORK I-65 KENNEDY BRIDGE | 2 of 2 | $3,044,810 | +6.0% |
| 28 SEP 2023 | 23-2993 | District 6 | BRIDGE REPAIR MISCELLANEOUS WORK TAYLOR SOUTHGATE BRIDGE (US 27) | 2 of 3 | $278,456 | +10% |
| 24 AUG 2023 | 23-2991 | District 5 | BRIDGE STEEL REPAIRS SECOND STREET (US 31) | 3 of 3 | $469,450 | +123% |
| 22 OCT 2021 | 21-2971 | District 4 | BRIDGE STEEL REPAIRS HARNED - LEICHFIELD ROAD (KY 79) | 3 of 5 | $144,950 | +50% |
| 29 JAN 2021 | 21-2601 | District 5 | BRIDGE STEEL REPAIRS US 60X (MP 0.037) - SINGING BRIDGE RETROFITS. | 2 of 4 | $177,750 | +23% |
| 25 SEP 2020 | 20-1031 | District 5 | BRIDGE REPAIRS I-65 BRIDGE AT SOUTH BROOK ST. | 4 of 9 | $173,210 | +26% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.