Kay & Kay Contracting LLC: KYTC bid record
Kay & Kay Contracting LLC submitted 62 bids on Kentucky Transportation Cabinet contracts in the data, from 24 JAN 2020 to 25 JUN 2026, and was the low bidder on 20 of them (32%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $58,235,721
- Latest bid
- 25 JUN 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 0 | 0% |
| 2021 | 9 | 2 | 22% |
| 2022 | 8 | 2 | 25% |
| 2023 | 14 | 3 | 21% |
| 2024 | 16 | 7 | 44% |
| 2025 | 5 | 4 | 80% |
| 2026 | 2 | 2 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 11 | 21 | 8 | 38% |
| District 8 | 10 | 3 | 30% |
| District 12 | 10 | 4 | 40% |
| District 5 | 4 | 1 | 25% |
| District 7 | 4 | 0 | 0% |
| District 6 | 3 | 0 | 0% |
| District 10 | 3 | 0 | 0% |
| District 4 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Guardrail terminal section no 1 | EACH | 44 | 38 (86%) | $84.47 | $85.06 | |
| Delineator for guardrail BI directional white | EACH | 48 | 36 (75%) | $14.97 | $14.19 | |
| Test piles | LF | 38 | 31 (82%) | $100.00 | $187.47 | |
| Armored edge for concrete | LF | 56 | 25 (45%) | $90.00 | $120.00 | |
| Guardrail-steel W beam-S face | LF | 42 | 25 (60%) | $40.24 | $38.00 | |
| Asphalt seal coat | TON | 38 | 23 (61%) | $2,262.68 | $1,370.39 | |
| Steel reinforcement-epoxy coated | LB | 58 | 22 (38%) | $2.00 | $2.00 | |
| Agricultural limestone | TON | 26 | 22 (85%) | $84.29 | $100.00 | |
| Asphalt material for tack | TON | 25 | 21 (84%) | $690.00 | $10.00 | |
| Asphalt seal aggregate | TON | 37 | 20 (54%) | $500.00 | $261.98 | |
| CL2 asph surf 0.38D PG64-22 | TON | 44 | 19 (43%) | $294.15 | $102.95 | |
| Pre-drilling for piles | LF | 33 | 19 (58%) | $280.00 | $388.51 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jave LLC | 34 | 16 of 34 |
| M & M Services Co Inc | 33 | 17 of 33 |
| Bush & Burchett Inc | 27 | 8 of 27 |
| Hinkle Construction Services LLC | 25 | 9 of 25 |
| Frederick & May Construction Co | 22 | 11 of 22 |
| Central Bridge Co LLC | 21 | 9 of 21 |
| Haydon Bridge Company Inc | 14 | 1 of 14 |
| Louisville Paving Company Inc | 8 | 6 of 8 |
| Irvine Contracting Limited Liability Company | 8 | 3 of 8 |
| Irvine Contracting LLC | 6 | 3 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 JUN 2026 | 26-5409 | BRIDGE SUPERSTRUCTURE REHAB KY 89 | 1 of 3 | $1,627,280 | Low, 3.0% under the second | |
| 21 MAY 2026 | 26-5414 | BRIDGE REPLACEMENT CR 1086 | 1 of 3 | $719,612 | Low, 1.0% under the second | |
| 11 DEC 2025 | 25-1037 | BRIDGE WITH GRADE, DRAIN & SURFACE CR-1169 | 1 of 5 | $1,241,796 | Low, 0.0% under the second | |
| 20 NOV 2025 | 25-5398 | BRIDGE REPLACEMENT CR 1127 | 2 of 3 | $1,478,064 | +6.0% | |
| 05 JUN 2025 | 25-2986 | BRIDGE SUPERSTRUCTURE REPLACEMENT KY 217 (HWY 217) | 1 of 6 | $367,311 | Low, 8.0% under the second | |
| 24 APR 2025 | 25-5380 | District 11 | BRIDGE REPLACEMENT OTTER CREEK ROAD (CR 1160) | 1 of 5 | $216,487 | Low, 62% under the second |
| 24 APR 2025 | 25-2985 | District 11 | BRIDGE REPLACEMENT STATE HWY 687 (KY 687) | 1 of 4 | $825,463 | Low, 10% under the second |
| 24 OCT 2024 | 24-5366 | District 11 | BRIDGE REPLACEMENT KY 72 | 1 of 7 | $1,553,751 | Low, 1.0% under the second |
| 24 OCT 2024 | 24-1015 | District 8 | SLIDE REPAIR BURNSIDE - WHITLEY CITY ROAD (US-27) | 3 of 5 | $4,999,095 | +71% |
| 24 OCT 2024 | 24-1317 | District 11 | CULVERT REPLACEMENT KY 522 | 6 of 6 | $1,570,748 | +112% |
| 26 SEP 2024 | 24-5363 | District 8 | BRIDGE REPLACEMENT KY 1787 | 5 of 5 | $1,576,687 | +25% |
| 18 JUL 2024 | 24-5359 | District 10 | BRIDGE REPLACEMENT RICHMOND-IRVINE ROAD (KY 52) | 6 of 6 | $6,750,734 | +129% |
| 18 JUL 2024 | 24-7003 | District 12 | BRIDGE REPLACEMENT SLICK ROCK ROAD (CR 1517) | 1 of 7 | $360,178 | Low, 11% under the second |
| 23 MAY 2024 | 24-5350 | District 11 | BRIDGE REPLACEMENT KY 225 | 5 of 7 | $608,113 | +11% |
| 25 APR 2024 | 24-2987 | District 12 | BRIDGE REPLACEMENT BLAIR BRANCH ROAD (CR 1339) | 1 of 6 | $981,455 | Low, 7.0% under the second |
| 21 MAR 2024 | 24-5339 | District 11 | BRIDGE REPLACEMENT KY 840 | 1 of 6 | $632,176 | Low, 13% under the second |
| 21 MAR 2024 | 24-7004 | District 12 | BRIDGE REPLACEMENT SLONE BRANCH ROAD (CR 1017) | 3 of 9 | $488,830 | +4.0% |
| 22 FEB 2024 | 24-5336 | District 8 | BRIDGE REPLACEMENT VARIOUS BRIDGES IN PULASKI COUNTY | 2 of 7 | $2,021,002 | +1.0% |
| 25 JAN 2024 | 24-5331 | District 11 | BRIDGE REPLACEMENT KY 2007 OVER CUMBERLAND RIVER | 1 of 2 | $3,137,409 | Low, 42% under the second |
| 25 JAN 2024 | 24-2973 | District 8 | BRIDGE SUPERSTRUCTURE REHAB SOMERSET-NANCY ROAD (KY 80) | 1 of 3 | $7,120,650 | Low, 16% under the second |
| 25 JAN 2024 | 24-7002 | District 12 | BRIDGE REPLACEMENT HWY 317 (KY 317) | 3 of 5 | $438,783 | +33% |
| 25 JAN 2024 | 24-7000 | District 12 | BRIDGE REPLACEMENT VARIOUS ROUTES IN KNOTT COUNTY ~ 3 LOCATIONS | 6 of 7 | $1,701,057 | +52% |
| 25 JAN 2024 | 24-7001 | District 12 | BRIDGE REPLACEMENT VARIOUS ROUTES IN KNOTT COUNTY ~ 2 LOCATIONS | 1 of 6 | $1,109,208 | Low, 11% under the second |
| 14 DEC 2023 | 23-5329 | District 5 | BRIDGE SUPERSTRUCTURE REPLACEMENT KY 12 | 3 of 4 | $737,856 | +24% |
| 14 DEC 2023 | 23-5326 | District 5 | BRIDGE REPLACEMENT KY 1060 | 5 of 8 | $1,427,553 | +24% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.