Irvine Contracting LLC: KYTC bid record
Irvine Contracting LLC submitted 18 bids on Kentucky Transportation Cabinet contracts in the data, from 21 FEB 2020 to 23 MAR 2023, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $3,899,925
- Latest bid
- 23 MAR 2023
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 0 | 0% |
| 2021 | 4 | 2 | 50% |
| 2022 | 8 | 3 | 38% |
| 2023 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 11 | 9 | 4 | 44% |
| District 12 | 6 | 1 | 17% |
| District 10 | 2 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Concrete sealing | SF | 32 | 19 (59%) | $3.00 | $3.00 | |
| Guardrail terminal section no 1 | EACH | 24 | 15 (63%) | $64.85 | $85.06 | |
| Concrete-class AA | CY | 29 | 11 (38%) | $2,000.00 | $1,716.02 | |
| Extra length guardrail post | EACH | 15 | 11 (73%) | $31.80 | $50.00 | |
| Delineator for guardrail BI directional white | EACH | 20 | 10 (50%) | $12.00 | $14.19 | |
| Guardrail-steel W beam-S face | LF | 19 | 9 (47%) | $43.33 | $38.00 | |
| Snow fence | LF | 11 | 9 (82%) | $2.63 | $4.00 | |
| Agricultural limestone | TON | 10 | 9 (90%) | $100.00 | $100.00 | |
| Guardrail-steel W beam-S face BR | LF | 14 | 8 (57%) | $197.38 | $210.00 | |
| Guardrail end treatment type 7 | EACH | 13 | 8 (62%) | $1,674.11 | $1,610.68 | |
| Initial fertilizer | TON | 10 | 8 (80%) | $1,500.00 | $1,200.00 | |
| Temp mulch | SY | 10 | 8 (80%) | $0.25 | $0.28 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & M Services Co Inc | 13 | 10 of 13 |
| Jave LLC | 13 | 5 of 13 |
| Bush & Burchett Inc | 10 | 5 of 10 |
| Frederick & May Construction Co | 8 | 3 of 8 |
| Central Bridge Co LLC | 7 | 3 of 7 |
| Hinkle Construction Services LLC | 6 | 2 of 6 |
| Kay & Kay Contracting LLC | 6 | 3 of 6 |
| Walker Construction & Materials LLC | 3 | 2 of 3 |
| Haydon Bridge Company Inc | 2 | 0 of 2 |
| Landmark Construction LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 MAR 2023 | 23-7006 | District 12 | BRIDGE REPLACEMENT DOBSON DRIVE (CR 1387) | 4 of 4 | $711,564 | +25% |
| 08 DEC 2022 | 22-7030 | District 12 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 12 - 5 LOCATIONS | 1 of 4 | $2,200,810 | Low, 4.0% under the second |
| 17 NOV 2022 | 22-7020 | District 12 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 12 - 4 LOCATIONS | 4 of 5 | $2,691,319 | +44% |
| 20 OCT 2022 | 22-1354 | District 12 | BRIDGE WITH GRADE, DRAIN & SURFACE HAMPTON BRANCH (CR 1226) | 2 of 7 | $576,389 | +6.0% |
| 20 OCT 2022 | 22-7026 | District 12 | BRIDGE REPLACEMENT CR 1078 KNOT COUNTY & CR 1689 LETCHER COUNTY | 2 of 4 | $1,002,782 | +16% |
| 28 APR 2022 | 22-5237 | District 11 | BRIDGE REPAIRS CR 1041 | 4 of 4 | $329,135 | +67% |
| 24 MAR 2022 | 22-2973 | District 11 | BRIDGE SUPERSTRUCTURE REPLACEMENT EVARTS - DIZNEY ROAD (KY 215) | 1 of 3 | $447,364 | Low, 12% under the second |
| 27 JAN 2022 | 22-5153 | District 11 | BRIDGE REPAIRS KY 1040 | 1 of 2 | $316,425 | Low, 13% under the second |
| 27 JAN 2022 | 22-5230 | District 11 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 11 | 2 of 4 | $976,790 | +12% |
| 19 NOV 2021 | 21-5220 | District 11 | BRIDGE REPLACEMENT VARIOUS BRIDGES | 3 of 7 | $3,494,907 | +7.0% |
| 24 SEP 2021 | 21-1332 | District 11 | BRIDGE REPAIRS DOG BRANCH SCHOOL ROAD (CR 1341) | 1 of 4 | $420,107 | Low, 13% under the second |
| 19 MAR 2021 | 21-5199 | District 11 | BRIDGE SUPERSTRUCTURE REPLACEMENT US 421 | 4 of 4 | $708,255 | +129% |
| 29 JAN 2021 | 21-5152 | District 11 | BRIDGE REPLACEMENT KY 1850 | 1 of 6 | $515,220 | Low, 7.0% under the second |
| 23 OCT 2020 | 20-1014 | District 12 | BRIDGE REPLACEMENT KY-3209 | 3 of 5 | $883,051 | +9.0% |
| 23 OCT 2020 | 20-5175 | District 7 | BRIDGE REPLACEMENT KY 1984 OVER TATES CREEK | 4 of 11 | $517,709 | +27% |
| 23 OCT 2020 | 20-5177 | District 10 | BRIDGE REPLACEMENT HALL'S OLD HOME PLACE (CR 1083) | 6 of 6 | $994,267 | +41% |
| 21 FEB 2020 | 20-5158 | District 10 | BRIDGE SUPERSTRUCTURE REPLACEMENT CR 1115 | 8 of 8 | $551,595 | +120% |
| 21 FEB 2020 | 20-5159 | District 11 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICTS 8 & 11 | 3 of 4 | $1,257,141 | +30% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.