Central Bridge Co LLC: KYTC bid record
Central Bridge Co LLC submitted 60 bids on Kentucky Transportation Cabinet contracts in the data, from 23 OCT 2020 to 23 APR 2026, and was the low bidder on 21 of them (35%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $26,606,155
- Latest bid
- 23 APR 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 4 | 1 | 25% |
| 2022 | 16 | 5 | 31% |
| 2023 | 19 | 10 | 53% |
| 2024 | 15 | 2 | 13% |
| 2025 | 3 | 3 | 100% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 12 | 25 | 9 | 36% |
| District 7 | 7 | 4 | 57% |
| District 11 | 7 | 2 | 29% |
| District 5 | 5 | 1 | 20% |
| District 10 | 5 | 0 | 0% |
| District 8 | 4 | 1 | 25% |
| District 6 | 3 | 2 | 67% |
| District 3 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Guardrail terminal section no 1 | EACH | 47 | 36 (77%) | $93.48 | $85.06 | |
| Steel reinforcement-epoxy coated | LB | 71 | 31 (44%) | $2.50 | $2.00 | |
| Delineator for guardrail BI directional white | EACH | 47 | 28 (60%) | $15.00 | $14.19 | |
| Guardrail-steel W beam-S face | LF | 41 | 25 (61%) | $43.84 | $38.00 | |
| Steel reinforcement | LB | 42 | 21 (50%) | $2.17 | $1.85 | |
| Guardrail end treatment type 7 | EACH | 26 | 20 (77%) | $1,850.50 | $1,610.68 | |
| Extra length guardrail post | EACH | 21 | 16 (76%) | $40.00 | $50.00 | |
| Asphalt material for tack | TON | 16 | 16 (100%) | $10.00 | $10.00 | |
| Asphalt seal aggregate | TON | 30 | 15 (50%) | $1,200.00 | $261.98 | |
| Rail system side mounted MGS | LF | 26 | 15 (58%) | $234.91 | $231.46 | |
| Maintenance fertilizer | TON | 25 | 15 (60%) | $1,500.00 | $1,248.00 | |
| Concrete-class A | CY | 77 | 14 (18%) | $1,080.00 | $1,088.01 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jave LLC | 41 | 10 of 41 |
| M & M Services Co Inc | 36 | 15 of 36 |
| Hinkle Construction Services LLC | 29 | 11 of 29 |
| Frederick & May Construction Co | 26 | 12 of 26 |
| Bush & Burchett Inc | 24 | 4 of 24 |
| Kay & Kay Contracting LLC | 21 | 12 of 21 |
| Haydon Bridge Company Inc | 14 | 0 of 14 |
| Irvine Contracting LLC | 7 | 4 of 7 |
| Boca Enterprises Inc | 7 | 2 of 7 |
| Louisville Paving Company Inc | 5 | 2 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 APR 2026 | 26-5413 | BRIDGE REPLACEMENT KY 1102 | 2 of 8 | $691,687 | +11% | |
| 19 FEB 2026 | 26-5406 | BRIDGE REPLACEMENT VARIOUS BRIDGES IN DISTRICT 12 | 2 of 4 | $2,251,587 | +16% | |
| 25 SEP 2025 | 25-5388 | BRIDGE REPLACEMENT KY 1983 | 1 of 3 | $2,241,416 | Low, 8.0% under the second | |
| 20 FEB 2025 | 25-2971 | District 12 | BRIDGE REPLACEMENT KY HWY 805 (KY 805) | 1 of 6 | $609,509 | Low, 4.0% under the second |
| 20 FEB 2025 | 25-5371 | District 5 | BRIDGE REPLACEMENT VARIOUS ROUTES IN FRANKLIN COUNTY | 1 of 3 | $4,548,989 | Low, 1.0% under the second |
| 14 NOV 2024 | 24-2943 | District 7 | BRIDGE REPLACEMENT BIRDIE ROAD (KY 395) | 5 of 9 | $822,519 | +16% |
| 24 OCT 2024 | 24-5366 | District 11 | BRIDGE REPLACEMENT KY 72 | 3 of 7 | $1,637,104 | +5.0% |
| 26 SEP 2024 | 24-5363 | District 8 | BRIDGE REPLACEMENT KY 1787 | 1 of 5 | $1,263,609 | Low, 1.0% under the second |
| 26 SEP 2024 | 24-7005 | District 12 | GRADE, DRAIN & SURFACE WITH BRIDGE SUNRISE ROAD (CR 1670) | 1 of 7 | $301,725 | Low, 32% under the second |
| 18 JUL 2024 | 24-5358 | District 6 | BRIDGE REPLACEMENT KY 491 | 6 of 8 | $881,117 | +21% |
| 18 JUL 2024 | 24-7003 | District 12 | BRIDGE REPLACEMENT SLICK ROCK ROAD (CR 1517) | 3 of 7 | $407,905 | +13% |
| 23 MAY 2024 | 24-5350 | District 11 | BRIDGE REPLACEMENT KY 225 | 4 of 7 | $605,997 | +11% |
| 25 APR 2024 | 24-2987 | District 12 | BRIDGE REPLACEMENT BLAIR BRANCH ROAD (CR 1339) | 2 of 6 | $1,052,360 | +7.0% |
| 21 MAR 2024 | 24-5340 | District 12 | BRIDGE REPLACEMENT KY 1441 | 3 of 7 | $547,674 | +14% |
| 21 MAR 2024 | 24-2979 | District 12 | BRIDGE REPLACEMENT HWY 550 (KY 550) | 2 of 7 | $352,412 | +11% |
| 21 MAR 2024 | 24-7004 | District 12 | BRIDGE REPLACEMENT SLONE BRANCH ROAD (CR 1017) | 5 of 9 | $505,693 | +7.0% |
| 22 FEB 2024 | 24-5336 | District 8 | BRIDGE REPLACEMENT VARIOUS BRIDGES IN PULASKI COUNTY | 6 of 7 | $2,395,684 | +20% |
| 25 JAN 2024 | 24-7002 | District 12 | BRIDGE REPLACEMENT HWY 317 (KY 317) | 2 of 5 | $391,701 | +19% |
| 25 JAN 2024 | 24-7000 | District 12 | BRIDGE REPLACEMENT VARIOUS ROUTES IN KNOTT COUNTY ~ 3 LOCATIONS | 3 of 7 | $1,448,762 | +29% |
| 25 JAN 2024 | 24-7001 | District 12 | BRIDGE REPLACEMENT VARIOUS ROUTES IN KNOTT COUNTY ~ 2 LOCATIONS | 3 of 6 | $1,363,129 | +23% |
| 14 DEC 2023 | 23-5310 | District 12 | BRIDGE REPLACEMENT KY 1862 | 1 of 7 | $1,099,437 | Low, 3.0% under the second |
| 26 OCT 2023 | 23-5315 | District 7 | BRIDGE REPLACEMENT KY 3369 | 3 of 5 | $691,631 | +18% |
| 26 OCT 2023 | 23-7010 | District 12 | GRADE, DRAIN & SURFACE WITH BRIDGE TRUMAN SLONE DRIVE (CR 1459) | 2 of 6 | $412,375 | +18% |
| 28 SEP 2023 | 23-5312 | District 8 | BRIDGE REPLACEMENT KY 3267 | 5 of 6 | $579,465 | +22% |
| 24 AUG 2023 | 23-5316 | District 6 | BRIDGE REPLACEMENT US 62 | 1 of 5 | $1,147,163 | Low, 5.0% under the second |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.