KYTC contract 25-2971 bid tabulation

BRIDGE REPLACEMENT KY HWY 805 (KY 805). Let by Kentucky Transportation Cabinet on February 20, 2025, Letcher, District 12. 6 bids received; low bid $609,509 by Central Bridge Co LLC, -3.3% against the engineer's estimate of $630,464.

Owner
Kentucky Transportation Cabinet
Letting
20 FEB 2025
Pay items
25
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Central Bridge Co LLC$609,509Low-3.0%
2Frederick & May Construction Co$633,980+4.0%+1.0%
3Bush & Burchett Inc$655,980+8.0%+4.0%
4Irvine Contracting Limited Liability Company$717,091+18%+14%
5Jave LLC$732,689+20%+16%
6Hinkle Construction Services LLC$749,541+23%+19%
KYTC contract 25-2971: bids by rank

Engineer's estimate: $630,464.

Bid tabulation

LinePay itemUnitQuantity1. Central Bridge Co LLC2. Frederick & May Construction Co3. Bush & Burchett Inc4. Irvine Contracting Limited Liability Company5. Jave LLC6. Hinkle Construction Services LLC
0010Dga baseTON A197$69.00$82.85$82.85$82.85$85.34$87.00
0020CL2 asph base 1.00D PG64-22TON A243$269.80$269.80$269.80$269.80$277.89$284.00
0030CL2 asph surf 0.38D PG64-22TON A39$311.50$311.50$311.50$311.50$320.85$328.00
0040Delineator for guardrail BI directional whiteEACH A8$15.00$15.00$15.00$15.00$15.45$15.80
0050Fence-4 FT chain linkLF A93$75.00$60.00$75.00$20.00$87.75$67.00
0060Guardrail-steel W beam-S faceLF A212.50$60.00$67.50$67.50$67.50$69.53$72.00
0070Guardrail terminal section no 1EACH A3$200.00$110.00$110.00$110.00$113.30$116.00
0080Guardrail end treatment type 1EACH A1$5,000.00$4,500.00$4,500.00$4,500.00$4,635.00$4,735.00
0090Channel lining class IITON A146$75.00$50.00$60.00$67.00$78.39$64.00
0100Temporary signsSQFT A200$18.00$21.00$25.00$18.00$12.88$20.00
0110Edge keyLF A40$54.40$54.40$54.40$54.40$56.03$57.00
0120Maintain & control trafficLS A1$25,000$38,085$60,000$50,510$40,704$108,000
0125Portable changeable message signEACH A3$2,900.00$4,240.00$1,000.00$2,968.00$2,292.78$3,365.00
0130StakingLS A1$10,000$6,500.00$5,000.00$5,000.00$5,850.00$4,040.00
0140Remove structureLS A1$30,000$61,277$40,000$45,458$41,041$25,100
0145Temp signal multi phaseEACH A1$15,000$30,000$20,000$18,700$18,540$21,085
0150Remove & relocate signsEACH A2$1,000.00$100.00$1,000.00$375.00$877.50$2,275.00
0160Erosion controlLS A1$8,500.00$5,000.00$15,000$9,000.00$7,956.00$9,910.00
0170Segmental retaining wallSQFT A50$100.00$25.00$50.00$150.00$87.75$150.00
0180Waterproofing membraneSQYD A135$50.00$30.00$50.00$55.00$58.50$46.00
0190Foundation preparationLS A1$45,000$25,100$50,000$110,000$59,257$80,000
0200Concrete-class ACUYD A237.80$975.00$945.86$1,000.00$967.00$1,244.88$1,042.00
0210Steel reinforcementLB A18,157$2.10$2.08$1.75$2.06$2.21$1.80
0220Steel reinforcement-epoxy coatedLB A20,525$2.00$2.20$1.75$2.18$2.45$1.95
0230DemobilizationLS A1$9,050.00$9,370.00$10,000$11,000$10,828$11,250
KYTC contract 25-2971: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of February 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy