Irvine Contracting Limited Liability Company: KYTC bid record
Irvine Contracting Limited Liability Company submitted 14 bids on Kentucky Transportation Cabinet contracts in the data, from 26 OCT 2023 to 21 AUG 2025, and was the low bidder on 4 of them (29%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $4,807,498
- Latest bid
- 21 AUG 2025
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 2 | 1 | 50% |
| 2024 | 4 | 1 | 25% |
| 2025 | 8 | 2 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 11 | 7 | 2 | 29% |
| District 12 | 2 | 0 | 0% |
| District 10 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Guardrail-steel W beam-S face | LF | 5 | 4 (80%) | $42.00 | $38.00 | |
| Guardrail terminal section no 1 | EACH | 6 | 3 (50%) | $118.50 | $85.06 | |
| Concrete-class AA | CY | 5 | 3 (60%) | $1,200.00 | $1,716.02 | |
| Delineator for guardrail BI directional white | EACH | 6 | 2 (33%) | $18.90 | $14.19 | |
| Asphalt seal coat | TON | 5 | 2 (40%) | $3,200.00 | $1,370.39 | |
| Concrete sealing | SF | 5 | 2 (40%) | $2.83 | $3.00 | |
| Concrete-class A | CY | 6 | 1 (17%) | $989.50 | $1,088.01 | |
| Dga base | TON | 5 | 1 (20%) | $48.25 | $45.00 | |
| Armored edge for concrete | LF | 5 | 1 (20%) | $105.00 | $120.00 | |
| Asphalt seal aggregate | TON | 5 | 1 (20%) | $710.25 | $261.98 | |
| Test piles | LF | 5 | 1 (20%) | $175.00 | $187.47 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & M Services Co Inc | 11 | 5 of 11 |
| Bush & Burchett Inc | 10 | 3 of 10 |
| Jave LLC | 9 | 3 of 9 |
| Hinkle Construction Services LLC | 9 | 1 of 9 |
| Kay & Kay Contracting LLC | 8 | 5 of 8 |
| Frederick & May Construction Co | 7 | 4 of 7 |
| Central Bridge Co LLC | 4 | 3 of 4 |
| Haydon Bridge Company Inc | 2 | 0 of 2 |
| Boca Enterprises Inc | 2 | 1 of 2 |
| Walker Construction & Materials LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 21 AUG 2025 | 25-5386 | BRIDGE REPLACEMENT CS 1041 | 1 of 3 | $2,436,560 | Low, 18% under the second | |
| 21 AUG 2025 | 25-2988 | BRIDGE REPLACEMENT STATE HWY 3630 (KY 3630) | 1 of 7 | $648,801 | Low, 10% under the second | |
| 24 JUL 2025 | 25-5384 | BRIDGE SUPERSTRUCTURE REPLACEMENT CR 1385 | 4 of 4 | $415,710 | +9.0% | |
| 05 JUN 2025 | 25-2986 | BRIDGE SUPERSTRUCTURE REPLACEMENT KY 217 (HWY 217) | 2 of 6 | $397,546 | +8.0% | |
| 24 APR 2025 | 25-5380 | District 11 | BRIDGE REPLACEMENT OTTER CREEK ROAD (CR 1160) | 2 of 5 | $351,019 | +62% |
| 24 APR 2025 | 25-2985 | District 11 | BRIDGE REPLACEMENT STATE HWY 687 (KY 687) | 2 of 4 | $905,869 | +10% |
| 20 FEB 2025 | 25-2971 | District 12 | BRIDGE REPLACEMENT KY HWY 805 (KY 805) | 4 of 6 | $717,091 | +18% |
| 20 FEB 2025 | 25-1302 | District 10 | ASPHALT SURFACE WITH GRADE & DRAIN KY191 | 4 of 6 | $1,083,568 | +22% |
| 24 OCT 2024 | 24-5366 | District 11 | BRIDGE REPLACEMENT KY 72 | 4 of 7 | $1,720,551 | +11% |
| 24 OCT 2024 | 24-1317 | District 11 | CULVERT REPLACEMENT KY 522 | 5 of 6 | $1,090,070 | +47% |
| 23 MAY 2024 | 24-5350 | District 11 | BRIDGE REPLACEMENT KY 225 | 1 of 7 | $546,813 | Low, 6.0% under the second |
| 21 MAR 2024 | 24-5339 | District 11 | BRIDGE REPLACEMENT KY 840 | 6 of 6 | $756,079 | +20% |
| 26 OCT 2023 | 23-5307 | District 11 | BRIDGE REPLACEMENT CR 1414 | 1 of 6 | $1,175,323 | Low, 4.0% under the second |
| 26 OCT 2023 | 23-7010 | District 12 | GRADE, DRAIN & SURFACE WITH BRIDGE TRUMAN SLONE DRIVE (CR 1459) | 4 of 6 | $470,119 | +34% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.