KYTC contract 25-1302 bid tabulation
ASPHALT SURFACE WITH GRADE & DRAIN KY191. Let by Kentucky Transportation Cabinet on February 20, 2025, Wolfe, District 10. 6 bids received; low bid $889,565 by Frederick & May Construction Co, -37% against the engineer's estimate of $1,401,584.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 FEB 2025
- Pay items
- 80
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Frederick & May Construction Co | $889,565 | Low | -37% |
| 2 | Walker Construction & Materials LLC | $968,881 | +9.0% | -31% |
| 3 | S & M Contracting LLC | $988,810 | +11% | -29% |
| 4 | Irvine Contracting Limited Liability Company | $1,083,568 | +22% | -23% |
| 5 | Bush & Burchett Inc | $1,169,122 | +31% | -17% |
| 6 | Hinkle Construction Services LLC | $1,226,016 | +38% | -13% |
Engineer's estimate: $1,401,584.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Frederick & May Construction Co | 2. Walker Construction & Materials LLC | 3. S & M Contracting LLC | 4. Irvine Contracting Limited Liability Company | 5. Bush & Burchett Inc | 6. Hinkle Construction Services LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A | 1,246 | $39.75 | $45.00 | $39.75 | $39.75 | $39.75 | $41.85 |
| 0020 | Asphalt seal aggregate | TON A | 10 | $875.00 | $320.00 | $875.00 | $875.00 | $875.00 | $921.00 |
| 0030 | Asphalt seal coat | TON A | 1.50 | $1,550.00 | $1,320.00 | $1,550.00 | $1,550.00 | $1,550.00 | $1,630.00 |
| 0040 | CL2 asph base 1.00D PG64-22 | TON A | 588 | $156.30 | $133.00 | $156.30 | $156.30 | $156.30 | $164.00 |
| 0050 | CL2 asph surf 0.38D PG64-22 | TON A | 134 | $205.30 | $203.00 | $205.30 | $205.30 | $205.30 | $216.00 |
| 0060 | Asphalt material for tack non-tracking | TON A | 1.10 | $460.00 | $320.00 | $460.00 | $460.00 | $406.00 | $484.00 |
| 0070 | Crushed aggregate size no 2 | TON A | 750 | $35.00 | $40.00 | $35.00 | $40.00 | $80.00 | $40.00 |
| 0080 | Perforated pipe-4 in | LF A | 250 | $8.00 | $17.00 | $4.00 | $2.50 | $12.00 | $21.50 |
| 0090 | Non-perforated pipe-4 in | LF A | 50 | $8.00 | $25.00 | $10.00 | $3.50 | $12.00 | $15.50 |
| 0100 | Perf pipe headwall TY 1-4 in | EACH A | 1 | $600.00 | $1,250.00 | $1,500.00 | $875.00 | $1,500.00 | $700.00 |
| 0110 | Remove pipe | LF A | 25 | $10.00 | $8.00 | $100.00 | $10.00 | $100.00 | $30.00 |
| 0120 | Delineator for guardrail BI directional white | EACH A | 15 | $16.00 | $16.00 | $17.49 | $16.00 | $17.49 | $17.00 |
| 0130 | Barricade-type III | EACH A | 8 | $50.00 | $132.50 | $265.00 | $50.00 | $150.00 | $175.00 |
| 0140 | Remove pavement | SQYD A | 747 | $4.00 | $10.00 | $7.00 | $8.00 | $15.00 | $5.00 |
| 0150 | Temp ditch | LF A | 473 | $0.10 | $1.00 | $8.50 | $2.00 | $3.00 | $1.50 |
| 0160 | Clean temp ditch | LF A | 373 | $0.01 | $0.10 | $8.50 | $1.00 | $3.00 | $0.01 |
| 0170 | Embankment in place | CUYD A | 1,915 | $10.00 | $37.00 | $20.00 | $29.00 | $12.00 | $40.00 |
| 0180 | Water | MGAL A | 5 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $0.01 |
| 0190 | Guardrail-steel W beam-S face | LF A | 650 | $33.50 | $33.50 | $35.08 | $33.50 | $35.08 | $35.00 |
| 0200 | Guardrail terminal section no 1 | EACH A | 1 | $95.00 | $95.00 | $97.37 | $95.00 | $97.37 | $100.00 |
| 0210 | Guardrail end treatment type 1 | EACH A | 3 | $3,900.00 | $3,900.00 | $4,530.56 | $3,900.00 | $4,530.56 | $4,100.00 |
| 0220 | Right-of-way monument type 1 | EACH A | 7 | $200.00 | $150.00 | $215.70 | $150.00 | $200.00 | $285.00 |
| 0230 | Witness post | EACH A | 7 | $200.00 | $150.00 | $197.82 | $75.00 | $200.00 | $95.50 |
| 0240 | Channel lining class II | TON A | 146 | $41.00 | $50.00 | $45.00 | $45.00 | $70.00 | $50.00 |
| 0250 | Channel lining class III | TON A | 1,020 | $44.00 | $50.00 | $45.00 | $48.00 | $48.00 | $55.00 |
| 0260 | Clearing and grubbing | LS A | 1 | $13,807 | $40,000 | $30,000 | $15,000 | $25,000 | $20,400 |
| 0270 | Temporary signs | SQFT A | 200 | $13.00 | $12.72 | $12.80 | $12.75 | $15.00 | $16.00 |
| 0280 | Ditching and shouldering | LF A | 545 | $5.00 | $7.00 | $10.00 | $9.00 | $30.00 | $22.00 |
| 0290 | Edge key | LF A | 131 | $54.75 | $33.00 | $54.75 | $54.75 | $54.75 | $58.00 |
| 0300 | Fabric-geotextile class 1 | SQYD A | 1,066 | $2.00 | $2.35 | $2.00 | $2.25 | $3.75 | $3.00 |
| 0310 | Fabric-geotextile class 2 | SQYD A | 160 | $2.00 | $2.50 | $10.00 | $4.50 | $4.00 | $2.75 |
| 0320 | Maintain & control traffic | LS A | 1 | $15,000 | $16,500 | $20,000 | $18,000 | $40,000 | $80,650 |
| 0330 | Portable changeable message sign | EACH A | 3 | $3,200.00 | $2,111.00 | $2,230.00 | $2,226.00 | $1,000.00 | $3,500.00 |
| 0340 | Edgeline rumble strips | LF A | 1,058 | $4.00 | $4.00 | $5.00 | $5.00 | $4.20 | $5.25 |
| 0350 | Temp silt fence | LF A | 200 | $2.00 | $3.00 | $5.00 | $2.50 | $3.00 | $7.00 |
| 0360 | Silt trap type A | EACH A | 4 | $50.00 | $10.00 | $50.00 | $450.00 | $150.00 | $250.00 |
| 0370 | Silt trap type B | EACH A | 4 | $50.00 | $10.00 | $50.00 | $250.00 | $150.00 | $600.00 |
| 0380 | Silt trap type C | EACH A | 2 | $50.00 | $10.00 | $50.00 | $250.00 | $150.00 | $550.00 |
| 0390 | Clean silt trap type A | EACH A | 4 | $10.00 | $10.00 | $1.00 | $100.00 | $50.00 | $35.00 |
| 0400 | Clean silt trap type B | EACH A | 4 | $10.00 | $10.00 | $1.00 | $100.00 | $50.00 | $35.00 |
| 0410 | Clean silt trap type C | EACH A | 2 | $10.00 | $10.00 | $1.00 | $100.00 | $50.00 | $35.00 |
| 0420 | Staking | LS A | 1 | $6,000.00 | $8,500.00 | $10,000 | $6,000.00 | $10,000 | $20,500 |
| 0430 | Remove structure | LS A | 1 | $33,000 | $16,500 | $7,000.00 | $20,000 | $20,000 | $15,000 |
| 0440 | Erosion control blanket | SQYD A | 1,360 | $3.25 | $3.25 | $3.51 | $3.25 | $3.51 | $3.40 |
| 0450 | Temp mulch | SQYD A | 4,840 | $0.33 | $0.33 | $0.47 | $0.33 | $0.47 | $0.35 |
| 0460 | Temp seeding and protection | SQYD A | 3,630 | $0.35 | $0.35 | $0.47 | $0.35 | $0.47 | $0.37 |
| 0470 | Initial fertilizer | TON A | 0.26 | $1,500.00 | $1,500.00 | $1,369.85 | $1,500.00 | $1,369.85 | $1,580.00 |
| 0480 | Maintenance fertilizer | TON A | 0.26 | $1,600.00 | $1,600.00 | $1,369.85 | $1,600.00 | $1,369.85 | $1,680.00 |
| 0490 | Seeding and protection | SQYD A | 3,611 | $2.20 | $2.20 | $0.87 | $2.20 | $0.87 | $2.35 |
| 0500 | Agricultural limestone | TON A | 0.16 | $85.00 | $85.00 | $94.44 | $85.00 | $94.44 | $89.50 |
| 0510 | Pave striping-temp paint-6 in | LF A | 1,250 | $0.75 | $0.75 | $2.25 | $0.24 | $0.50 | $0.25 |
| 0520 | Pave striping-perm paint-6 in | LF A | 1,506 | $0.75 | $0.75 | $2.25 | $0.28 | $0.50 | $0.30 |
| 0530 | Pave striping-thermo-6 in W | LF A | 1,400 | $3.00 | $3.00 | $4.25 | $1.50 | $3.00 | $1.55 |
| 0540 | Pave striping-thermo-6 in Y | LF A | 1,400 | $3.00 | $3.00 | $4.25 | $2.04 | $3.00 | $1.60 |
| 0550 | Pave marking-thermo stop bar-24IN | LF A | 16 | $12.00 | $12.00 | $20.00 | $12.00 | $12.00 | $12.50 |
| 0560 | Fuel adjustment | DOLL A | 6,572 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0570 | Asphalt adjustment | DOLL A | 16,506 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0580 | Joint adhesive | LF A | 131 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $31.00 |
| 0590 | Object marker TY 3 | EACH A | 3 | $110.00 | $110.00 | $67.56 | $110.00 | $67.56 | $115.00 |
| 0600 | Sawcut pavement | LF A | 302 | $4.00 | $2.00 | $10.00 | $3.00 | $10.00 | $5.00 |
| 0610 | Water blasting existing stripe | LF A | 3,300 | $1.00 | $1.00 | $1.45 | $0.76 | $1.00 | $0.80 |
| 0620 | Entrance pipe-18 in | LF A | 48 | $55.00 | $75.00 | $100.00 | $40.00 | $75.00 | $105.00 |
| 0630 | Structure excav-solid rock | CUYD A | 13 | $100.00 | $150.00 | $200.00 | $300.00 | $100.00 | $58.00 |
| 0640 | Foundation preparation | LS A | 1 | $26,000 | $34,000 | $30,000 | $62,890 | $75,000 | $59,000 |
| 0650 | Concrete-class A | CUYD A | 259.40 | $660.00 | $725.00 | $755.00 | $915.00 | $1,000.00 | $900.00 |
| 0660 | Steel reinforcement | LB A | 45,942 | $1.60 | $1.25 | $1.50 | $1.45 | $1.75 | $2.00 |
| 0670 | SBM alum sheet signs .080 in | SQFT A | 186 | $40.00 | $40.00 | $49.90 | $40.00 | $40.00 | $42.00 |
| 0680 | Steel post type 2 | LF A | 306 | $30.00 | $30.00 | $34.59 | $30.00 | $30.00 | $31.50 |
| 0690 | Steel post mile markers | EACH A | 2 | $400.00 | $400.00 | $453.76 | $400.00 | $400.00 | $421.00 |
| 0700 | Remove sign | EACH A | 36 | $100.00 | $100.00 | $99.48 | $100.00 | $100.00 | $105.00 |
| 0710 | Barcode sign inventory | EACH A | 49 | $40.00 | $40.00 | $49.74 | $40.00 | $40.00 | $42.00 |
| 0720 | W encasement steel open cut range 3 | LF A | 108 | $275.00 | $154.00 | $127.00 | $385.75 | $160.00 | $276.00 |
| 0730 | W flush hydrant assembly | EACH A | 1 | $7,600.00 | $6,400.00 | $11,000 | $11,100 | $5,000.00 | $9,525.00 |
| 0740 | W meter adjust | EACH A | 1 | $1,200.00 | $1,200.00 | $1,000.00 | $1,615.00 | $675.00 | $920.00 |
| 0750 | W pipe ductile iron 08 inch | LF A | 125 | $55.00 | $91.20 | $150.00 | $125.15 | $155.00 | $118.00 |
| 0760 | W pipe PVC 08 inch | LF A | 727 | $39.00 | $55.00 | $70.00 | $80.20 | $85.00 | $74.50 |
| 0770 | W serv PE/PLST long side 3/4 in | EACH A | 1 | $2,500.00 | $2,000.00 | $5,000.00 | $1,810.00 | $5,765.00 | $3,780.00 |
| 0780 | W tie-in 08 inch | EACH A | 3 | $5,000.00 | $4,000.00 | $3,500.00 | $4,150.00 | $3,500.00 | $4,760.00 |
| 0790 | W valve 08 inch | EACH A | 4 | $2,830.00 | $3,500.00 | $3,000.00 | $3,885.00 | $3,000.00 | $4,000.00 |
| 0800 | Demobilization | LS A | 1 | $13,147 | $14,769 | $14,300 | $17,000 | $17,000 | $18,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of February 20, 2025. Compiled by Mirage Metrics.