KYTC contract 25-1302 bid tabulation

ASPHALT SURFACE WITH GRADE & DRAIN KY191. Let by Kentucky Transportation Cabinet on February 20, 2025, Wolfe, District 10. 6 bids received; low bid $889,565 by Frederick & May Construction Co, -37% against the engineer's estimate of $1,401,584.

Owner
Kentucky Transportation Cabinet
Letting
20 FEB 2025
Pay items
80
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Frederick & May Construction Co$889,565Low-37%
2Walker Construction & Materials LLC$968,881+9.0%-31%
3S & M Contracting LLC$988,810+11%-29%
4Irvine Contracting Limited Liability Company$1,083,568+22%-23%
5Bush & Burchett Inc$1,169,122+31%-17%
6Hinkle Construction Services LLC$1,226,016+38%-13%
KYTC contract 25-1302: bids by rank

Engineer's estimate: $1,401,584.

Bid tabulation

LinePay itemUnitQuantity1. Frederick & May Construction Co2. Walker Construction & Materials LLC3. S & M Contracting LLC4. Irvine Contracting Limited Liability Company5. Bush & Burchett Inc6. Hinkle Construction Services LLC
0010Crushed stone baseTON A1,246$39.75$45.00$39.75$39.75$39.75$41.85
0020Asphalt seal aggregateTON A10$875.00$320.00$875.00$875.00$875.00$921.00
0030Asphalt seal coatTON A1.50$1,550.00$1,320.00$1,550.00$1,550.00$1,550.00$1,630.00
0040CL2 asph base 1.00D PG64-22TON A588$156.30$133.00$156.30$156.30$156.30$164.00
0050CL2 asph surf 0.38D PG64-22TON A134$205.30$203.00$205.30$205.30$205.30$216.00
0060Asphalt material for tack non-trackingTON A1.10$460.00$320.00$460.00$460.00$406.00$484.00
0070Crushed aggregate size no 2TON A750$35.00$40.00$35.00$40.00$80.00$40.00
0080Perforated pipe-4 inLF A250$8.00$17.00$4.00$2.50$12.00$21.50
0090Non-perforated pipe-4 inLF A50$8.00$25.00$10.00$3.50$12.00$15.50
0100Perf pipe headwall TY 1-4 inEACH A1$600.00$1,250.00$1,500.00$875.00$1,500.00$700.00
0110Remove pipeLF A25$10.00$8.00$100.00$10.00$100.00$30.00
0120Delineator for guardrail BI directional whiteEACH A15$16.00$16.00$17.49$16.00$17.49$17.00
0130Barricade-type IIIEACH A8$50.00$132.50$265.00$50.00$150.00$175.00
0140Remove pavementSQYD A747$4.00$10.00$7.00$8.00$15.00$5.00
0150Temp ditchLF A473$0.10$1.00$8.50$2.00$3.00$1.50
0160Clean temp ditchLF A373$0.01$0.10$8.50$1.00$3.00$0.01
0170Embankment in placeCUYD A1,915$10.00$37.00$20.00$29.00$12.00$40.00
0180WaterMGAL A5$1.00$1.00$1.00$1.00$1.00$0.01
0190Guardrail-steel W beam-S faceLF A650$33.50$33.50$35.08$33.50$35.08$35.00
0200Guardrail terminal section no 1EACH A1$95.00$95.00$97.37$95.00$97.37$100.00
0210Guardrail end treatment type 1EACH A3$3,900.00$3,900.00$4,530.56$3,900.00$4,530.56$4,100.00
0220Right-of-way monument type 1EACH A7$200.00$150.00$215.70$150.00$200.00$285.00
0230Witness postEACH A7$200.00$150.00$197.82$75.00$200.00$95.50
0240Channel lining class IITON A146$41.00$50.00$45.00$45.00$70.00$50.00
0250Channel lining class IIITON A1,020$44.00$50.00$45.00$48.00$48.00$55.00
0260Clearing and grubbingLS A1$13,807$40,000$30,000$15,000$25,000$20,400
0270Temporary signsSQFT A200$13.00$12.72$12.80$12.75$15.00$16.00
0280Ditching and shoulderingLF A545$5.00$7.00$10.00$9.00$30.00$22.00
0290Edge keyLF A131$54.75$33.00$54.75$54.75$54.75$58.00
0300Fabric-geotextile class 1SQYD A1,066$2.00$2.35$2.00$2.25$3.75$3.00
0310Fabric-geotextile class 2SQYD A160$2.00$2.50$10.00$4.50$4.00$2.75
0320Maintain & control trafficLS A1$15,000$16,500$20,000$18,000$40,000$80,650
0330Portable changeable message signEACH A3$3,200.00$2,111.00$2,230.00$2,226.00$1,000.00$3,500.00
0340Edgeline rumble stripsLF A1,058$4.00$4.00$5.00$5.00$4.20$5.25
0350Temp silt fenceLF A200$2.00$3.00$5.00$2.50$3.00$7.00
0360Silt trap type AEACH A4$50.00$10.00$50.00$450.00$150.00$250.00
0370Silt trap type BEACH A4$50.00$10.00$50.00$250.00$150.00$600.00
0380Silt trap type CEACH A2$50.00$10.00$50.00$250.00$150.00$550.00
0390Clean silt trap type AEACH A4$10.00$10.00$1.00$100.00$50.00$35.00
0400Clean silt trap type BEACH A4$10.00$10.00$1.00$100.00$50.00$35.00
0410Clean silt trap type CEACH A2$10.00$10.00$1.00$100.00$50.00$35.00
0420StakingLS A1$6,000.00$8,500.00$10,000$6,000.00$10,000$20,500
0430Remove structureLS A1$33,000$16,500$7,000.00$20,000$20,000$15,000
0440Erosion control blanketSQYD A1,360$3.25$3.25$3.51$3.25$3.51$3.40
0450Temp mulchSQYD A4,840$0.33$0.33$0.47$0.33$0.47$0.35
0460Temp seeding and protectionSQYD A3,630$0.35$0.35$0.47$0.35$0.47$0.37
0470Initial fertilizerTON A0.26$1,500.00$1,500.00$1,369.85$1,500.00$1,369.85$1,580.00
0480Maintenance fertilizerTON A0.26$1,600.00$1,600.00$1,369.85$1,600.00$1,369.85$1,680.00
0490Seeding and protectionSQYD A3,611$2.20$2.20$0.87$2.20$0.87$2.35
0500Agricultural limestoneTON A0.16$85.00$85.00$94.44$85.00$94.44$89.50
0510Pave striping-temp paint-6 inLF A1,250$0.75$0.75$2.25$0.24$0.50$0.25
0520Pave striping-perm paint-6 inLF A1,506$0.75$0.75$2.25$0.28$0.50$0.30
0530Pave striping-thermo-6 in WLF A1,400$3.00$3.00$4.25$1.50$3.00$1.55
0540Pave striping-thermo-6 in YLF A1,400$3.00$3.00$4.25$2.04$3.00$1.60
0550Pave marking-thermo stop bar-24INLF A16$12.00$12.00$20.00$12.00$12.00$12.50
0560Fuel adjustmentDOLL A6,572$1.00$1.00$1.00$1.00$1.00$1.00
0570Asphalt adjustmentDOLL A16,506$1.00$1.00$1.00$1.00$1.00$1.00
0580Joint adhesiveLF A131$30.00$30.00$30.00$30.00$30.00$31.00
0590Object marker TY 3EACH A3$110.00$110.00$67.56$110.00$67.56$115.00
0600Sawcut pavementLF A302$4.00$2.00$10.00$3.00$10.00$5.00
0610Water blasting existing stripeLF A3,300$1.00$1.00$1.45$0.76$1.00$0.80
0620Entrance pipe-18 inLF A48$55.00$75.00$100.00$40.00$75.00$105.00
0630Structure excav-solid rockCUYD A13$100.00$150.00$200.00$300.00$100.00$58.00
0640Foundation preparationLS A1$26,000$34,000$30,000$62,890$75,000$59,000
0650Concrete-class ACUYD A259.40$660.00$725.00$755.00$915.00$1,000.00$900.00
0660Steel reinforcementLB A45,942$1.60$1.25$1.50$1.45$1.75$2.00
0670SBM alum sheet signs .080 inSQFT A186$40.00$40.00$49.90$40.00$40.00$42.00
0680Steel post type 2LF A306$30.00$30.00$34.59$30.00$30.00$31.50
0690Steel post mile markersEACH A2$400.00$400.00$453.76$400.00$400.00$421.00
0700Remove signEACH A36$100.00$100.00$99.48$100.00$100.00$105.00
0710Barcode sign inventoryEACH A49$40.00$40.00$49.74$40.00$40.00$42.00
0720W encasement steel open cut range 3LF A108$275.00$154.00$127.00$385.75$160.00$276.00
0730W flush hydrant assemblyEACH A1$7,600.00$6,400.00$11,000$11,100$5,000.00$9,525.00
0740W meter adjustEACH A1$1,200.00$1,200.00$1,000.00$1,615.00$675.00$920.00
0750W pipe ductile iron 08 inchLF A125$55.00$91.20$150.00$125.15$155.00$118.00
0760W pipe PVC 08 inchLF A727$39.00$55.00$70.00$80.20$85.00$74.50
0770W serv PE/PLST long side 3/4 inEACH A1$2,500.00$2,000.00$5,000.00$1,810.00$5,765.00$3,780.00
0780W tie-in 08 inchEACH A3$5,000.00$4,000.00$3,500.00$4,150.00$3,500.00$4,760.00
0790W valve 08 inchEACH A4$2,830.00$3,500.00$3,000.00$3,885.00$3,000.00$4,000.00
0800DemobilizationLS A1$13,147$14,769$14,300$17,000$17,000$18,000
KYTC contract 25-1302: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of February 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way