KYTC contract 25-5388 bid tabulation
BRIDGE REPLACEMENT KY 1983. Let by Kentucky Transportation Cabinet on September 25, 2025. 3 bids received; low bid $2,241,416 by Central Bridge Co LLC, -11% against the engineer's estimate of $2,527,491.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 SEP 2025
- Pay items
- 58
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Central Bridge Co LLC | $2,241,416 | Low | -11% |
| 2 | Haydon Bridge Company Inc | $2,417,485 | +8.0% | -4.0% |
| 3 | Hall Contracting of Kentucky Inc | $2,799,000 | +25% | +11% |
Engineer's estimate: $2,527,491.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Central Bridge Co LLC | 2. Haydon Bridge Company Inc | 3. Hall Contracting of Kentucky Inc |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 1,446 | $42.75 | $47.00 | $42.75 |
| 0020 | Traffic bound base | TON A A | 32 | $70.00 | $95.00 | $50.00 |
| 0030 | Asphalt seal aggregate | TON A A | 12 | $450.00 | $450.00 | $450.00 |
| 0040 | Asphalt seal coat | TON A A | 2 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 120 | $175.00 | $190.00 | $175.00 |
| 0060 | CL2 asph base 1.00D PG64-22 | TON A A | 600 | $145.00 | $150.00 | $145.00 |
| 0070 | CL2 asph surf 0.38D PG64-22 | TON A A | 115 | $175.00 | $190.00 | $175.00 |
| 0080 | Asphalt material for tack | TON A A | 2 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0090 | Delineator for guardrail BI directional white | EACH A A | 24 | $16.19 | $17.50 | $16.20 |
| 0100 | Granular embankment | CUYD A A | 1,583 | $51.50 | $47.50 | $88.00 |
| 0110 | Embankment in place | CUYD A A | 1,934 | $48.00 | $21.00 | $116.00 |
| 0120 | Fence-temp | LF A A | 223 | $24.60 | $27.00 | $24.60 |
| 0130 | Fence-woven wire type 1 | LF A A | 806 | $9.41 | $9.95 | $9.50 |
| 0140 | Remove fence | LF A A | 569 | $6.55 | $7.00 | $6.60 |
| 0150 | Guardrail terminal section no 1 | EACH A A | 2 | $95.13 | $100.00 | $95.20 |
| 0160 | Guardrail end treatment type 7 | EACH A A | 2 | $1,858.48 | $2,000.00 | $1,860.50 |
| 0170 | Remove guardrail | LF A A | 416 | $4.55 | $5.00 | $4.60 |
| 0180 | Guardrail end treatment type 4A | EACH A A | 2 | $3,863.84 | $4,150.00 | $3,864.90 |
| 0190 | Channel lining class II | TON A A | 740 | $53.50 | $55.00 | $53.00 |
| 0200 | Clearing and grubbing | LS A A | 1 | $13,500 | $150,000 | $100,000 |
| 0210 | Concrete-class B | CUYD A A | 168 | $790.00 | $1,150.00 | $790.00 |
| 0220 | Edge key | LF A A | 36 | $45.00 | $60.00 | $45.00 |
| 0230 | Fabric-geotextile class 1 | SQYD A A | 1,184 | $3.10 | $5.00 | $1.70 |
| 0240 | Fabric-geotextile class 2 | SQYD A A | 1,024 | $4.00 | $5.00 | $5.00 |
| 0250 | Maintain & control traffic | LS A A | 1 | $17,000 | $25,000 | $130,000 |
| 0260 | Portable changeable message sign | EACH A A | 2 | $4,000.00 | $3,000.00 | $5,000.00 |
| 0270 | Sidewalk-4 in concrete | SQYD A A | 9 | $515.00 | $295.00 | $225.00 |
| 0280 | Staking | LS A A | 1 | $5,000.00 | $20,000 | $60,000 |
| 0290 | Remove structure | LS A A | 1 | $80,000 | $225,000 | $225,000 |
| 0300 | Erosion control blanket | SQYD A A | 96 | $3.25 | $3.50 | $3.25 |
| 0305 | Pave striping-perm paint-4 in | LF A A | 1,204 | $0.65 | $0.70 | $0.90 |
| 0306 | Pave striping-dur TY 1-4 in Y | LF A A | 236 | $9.00 | $15.00 | $10.00 |
| 0308 | Structure excav-solid rock | CUYD A A | 102.80 | $115.00 | $115.00 | $190.00 |
| 0310 | Erosion control | LS A A | 1 | $16,000 | $15,000 | $50,000 |
| 0320 | G/R steel W beam-S face (7 FT post) | LF A A | 562.50 | $36.80 | $40.00 | $36.80 |
| 0330 | Thrie beam guardrail transition TL-2 | EACH A A | 4 | $1,740.78 | $2,500.00 | $5,000.00 |
| 0340 | Electronic delivery MGMT system - agg | LS A A | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0350 | Entrance pipe-15 in | LF A A | 48 | $91.00 | $95.00 | $54.00 |
| 0360 | Storm sewer pipe-15 in | LF A A | 12 | $185.00 | $115.00 | $74.00 |
| 0370 | Sloped box outlet type 1-15 in | EACH A A | 1 | $3,640.00 | $2,750.00 | $1,910.00 |
| 0380 | Curb box inlet type B | EACH A A | 1 | $8,575.00 | $10,500 | $4,580.00 |
| 0390 | Curb box inlet type F | EACH A A | 1 | $8,485.00 | $4,950.00 | $3,420.00 |
| 0400 | Flume inlet type 2 | EACH A A | 2 | $8,825.00 | $9,750.00 | $6,650.00 |
| 0410 | Structure granular backfill | CUYD A A | 638.40 | $80.00 | $74.50 | $87.00 |
| 0415 | Armored edge for concrete | LF A A | 47 | $130.00 | $120.00 | $100.00 |
| 0420 | Foundation preparation | LS A A | 1 | $70,000 | $75,000 | $50,000 |
| 0430 | Crushed aggregate slope prot | TON A A | 130 | $110.00 | $68.00 | $70.00 |
| 0440 | Concrete-class A | CUYD A A | 155.10 | $1,025.00 | $1,150.00 | $1,200.00 |
| 0450 | Concrete-class AA | CUYD A A | 87.30 | $2,065.00 | $1,950.00 | $2,300.00 |
| 0460 | Steel reinforcement-epoxy coated | LB A A | 45,723 | $2.00 | $2.29 | $2.20 |
| 0470 | Structural steel | LS A A | 1 | $607,500 | $415,000 | $465,000 |
| 0480 | Shear connectors | LS A A | 1 | $21,060 | $22,000 | $15,800 |
| 0490 | Concrete sealing | SQFT A A | 5,980 | $1.85 | $1.50 | $1.70 |
| 0500 | Chain link fence | LF A A | 232 | $94.00 | $150.00 | $120.00 |
| 0510 | Rail system single slope - 40 in | LF A A | 236 | $185.00 | $195.00 | $210.00 |
| 0520 | Mobilization for concrete surf treatment | LS A A | 1 | $2,250.00 | $750.00 | $4,000.00 |
| 0530 | Mobilization | LS A A | 1 | $105,200 | $113,000 | $131,399 |
| 0540 | Demobilization | LS A A | 1 | $31,570 | $34,281 | $39,567 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.