KYTC contract 25-5371 bid tabulation

BRIDGE REPLACEMENT VARIOUS ROUTES IN FRANKLIN COUNTY. Let by Kentucky Transportation Cabinet on February 20, 2025, Franklin, District 5. 3 bids received; low bid $4,548,989 by Central Bridge Co LLC, -14% against the engineer's estimate of $5,275,202.

Owner
Kentucky Transportation Cabinet
Letting
20 FEB 2025
Pay items
105
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Central Bridge Co LLC$4,548,989Low-14%
2Galusha Contracting LLC$4,586,101+1.0%-13%
3Hinkle Construction Services LLC$5,966,750+31%+13%
KYTC contract 25-5371: bids by rank

Engineer's estimate: $5,275,202.

Bid tabulation

LinePay itemUnitQuantity1. Central Bridge Co LLC2. Galusha Contracting LLC3. Hinkle Construction Services LLC
0010Dga baseTON A2,583$27.00$37.00$40.00
0020Asphalt seal aggregateTON A22$300.00$312.00$315.00
0030Asphalt seal coatTON A3$1,000.00$1,040.00$1,060.00
0040CL2 asph base 1.00D PG64-22TON A1,054$98.00$101.92$104.00
0050CL2 asph surf 0.38D PG64-22TON A161$169.25$176.02$179.00
0060Asphalt material for tackTON A3$750.00$780.00$794.00
0070Entrance pipe-15 inLF A40$100.00$45.00$80.00
0080Culvert pipe-48 inLF A64$200.00$200.00$360.00
0090Pipe culvert headwall-48 inEACH A1$2,500.00$5,500.00$3,356.00
0100Delineator for guardrail BI directional whiteEACH A10$16.19$16.96$15.85
0110Embankment in placeCUYD A12,293$17.00$10.00$40.00
0120Structure granular backfillCUYD A243$100.00$80.00$108.00
0130Special embankmentCUYD A4,388$15.00$15.00$42.00
0140Guardrail-steel W beam-S faceLF A1,212.50$32.22$33.35$28.00
0150Guardrail terminal section no 1EACH A3$73.59$76.17$90.00
0160Guardrail end treatment type 1EACH A3$4,029.40$4,170.43$4,020.00
0170Channel lining class IITON A1,065$40.00$52.00$49.00
0180Clearing and grubbingLS A1$15,000$25,000$15,875
0190Edge keyLF A34$30.00$31.20$31.75
0200Fabric-geotextile class 1SQYD A2,030$1.60$3.00$3.20
0210Fabric-geotextile class 2SQYD A4,363$1.50$2.50$2.25
0220Maintain & control trafficLS A1$8,500.00$34,300$68,500
0230Portable changeable message signEACH A2$900.00$4,500.00$10,375
0240Settlement platformEACH A2$2,000.00$2,100.00$2,925.00
0250StakingLS A1$4,000.00$12,000$15,600
0260Remove structureLS A1$135,000$110,000$116,820
0270Conc barrier wall type 9TLF A100$1.00$80.00$104.00
0280Armored edge for concreteLF A50$125.00$88.00$66.00
0290Steel pipe-2 1/2 inLF A68.25$80.00$80.00$58.00
0300Steel pipe-4 inLF A57.75$95.00$105.00$93.00
0310Pave striping-thermo-4 in WLF A1,790$2.25$2.50$2.35
0320Pave striping-thermo-4 in YLF A1,790$2.25$2.50$2.35
0330Pave striping-dur TY 1-4 in WLF A460$8.00$8.00$8.50
0340Pave striping-dur TY 1-4 in YLF A460$8.00$8.00$8.50
0350Foundation preparationLS A1$70,000$270,000$990,000
0360Cyclopean stone rip rapTON A2,286$56.50$57.00$58.00
0370Test pilesLF A180$163.50$140.00$100.00
0380Piles-steel HP12X53LF A1,152$80.00$75.00$110.00
0390Pile points-12 inEACH A16$175.00$175.00$182.00
0400Concrete-class ACUYD A169$1,390.00$1,257.00$1,830.00
0410Concrete-class AACUYD A208$1,155.00$1,195.00$1,040.00
0420Steel reinforcementLB A25,651$2.00$1.78$1.45
0430Steel reinforcement-epoxy coatedLB A45,714$1.90$1.68$1.50
0440Precast PC box beam SB42LF A1,367$536.00$515.00$482.00
0450Crash cushion TY VI class BT TL3EACH A2$2,500.00$7,245.00$5,820.00
0460Rock soundingsLF A210$85.00$62.00$58.20
0470Rock coringsLF A94$210.00$98.00$94.15
0480Erosion controlLS A1$6,500.00$13,000$9,415.00
0490Drilled shaft-66 in (common)LF A210$1,670.00$1,583.00$1,675.00
0500Drilled shaft-60 in (solid rock)LF A40$2,715.00$2,597.00$1,675.00
0510Concrete sealingSQFT A11,584$2.35$1.65$1.65
0520Rail system side mounted MGSLF A462$248.75$257.46$250.00
0530Mobilization for concrete surf treatmentLS A1$2,500.00$250.00$1,700.00
0540Dga baseTON A78$27.00$47.00$76.00
0550Asphalt seal aggregateTON A3.54$300.00$312.00$318.00
0560Asphalt seal coatTON A0.42$1,000.00$1,040.00$1,060.00
0570CL2 asph base 1.00D PG64-22TON A92$275.00$286.00$290.00
0580CL2 asph surf 0.38D PG64-22TON A13$385.00$400.40$410.00
0590Asphalt material for tackTON A0.23$750.00$780.00$794.00
0600Culvert pipe-21 inLF A40$120.00$110.00$109.00
0610Pipe culvert headwall-21 inEACH A1$3,500.00$2,400.00$2,342.00
0620Remove pipeLF A4$190.00$100.00$218.00
0630Junction box-modEACH A1$3,600.00$4,500.00$3,200.00
0640Delineator for guardrail BI directional whiteEACH A10$16.19$16.76$15.85
0650Barricade-type IIIEACH A4$100.00$300.00$155.00
0660Roadway excavationCUYD A388$32.00$35.00$60.00
0670Granular embankmentCUYD A190$32.00$80.00$114.00
0680Structure granular backfillCUYD A376$95.00$80.00$102.00
0690Guardrail-steel W beam-S faceLF A121.30$33.34$34.51$28.00
0700Guardrail terminal section no 1EACH A1$73.59$76.17$89.95
0710Guardrail end treatment type 1EACH A3$4,029.40$4,170.43$4,021.29
0720Remove guardrailLF A290$3.23$3.34$4.25
0730Extra length guardrail postEACH A50$53.29$55.46$127.00
0740Clearing and grubbingLS A1$10,000$8,500.00$14,075
0750Temporary signsSQFT A318$18.00$5.00$9.00
0760Edge keyLF A44$30.00$31.20$31.75
0770Fabric-geotextile class 2 for pipeSQYD A62$2.00$2.00$2.00
0780Retaining wall-gabionCUYD A36$560.00$200.00$490.00
0790Maintain & control trafficLS A1$15,000$23,000$3,340.00
0800Portable changeable message signEACH A2$900.00$1,500.00$2,600.00
0810StakingLS A1$5,000.00$9,500.00$3,875.00
0820Remove structureLS A1$53,500$35,000$44,445
0830Armored edge for concreteLF A48$125.00$88.00$70.00
0840Steel post type 1LF A29$32.03$33.15$70.00
0850Pave striping-perm paint-4 inLF A310$0.85$0.85$0.90
0860Pave striping-dur TY 1-4 in YLF A526$8.00$8.00$8.50
0870Structure excav-solid rockCUYD A17$265.00$150.00$176.00
0880Foundation preparationLS A1$30,000$70,000$30,300
0890Cyclopean stone rip rapTON A255$80.00$72.00$85.00
0900Test pilesLF A49$275.00$310.00$140.00
0910Pre-drilling for pilesLF A220$440.00$466.00$390.00
0920Piles-steel HP14X89LF A390$155.00$137.20$148.00
0930Concrete-class ACUYD A170.90$1,065.00$915.00$885.00
0940Steel reinforcement-epoxy coatedLB A17,317$2.00$1.61$1.50
0950Precast PC box beam CB33-48LF A504$451.00$420.00$465.00
0960Object marker TY 3EACH A3$280.67$590.49$100.00
0970Remove-store and reinstall signEACH A1$985.23$1,019.71$2,080.00
0975CSL testing (4 tubes)EACH A4$2,500.00$1,000.00$5,725.00
0980Erosion controlLS A1$9,000.00$8,500.00$6,500.00
0990Concrete sealingSQFT A5,600$2.70$1.65$1.70
1000Rail system side mounted MGSLF A168$248.75$257.46$240.00
1010Concrete-class AA - ICCUYD A71.90$1,625.00$1,272.00$1,650.00
1020Mobilization for concrete surf treatmentLS A1$2,500.00$250.00$1,365.00
1030MobilizationLS A1$213,400$215,291$260,000
1040DemobilizationLS A1$64,500$65,000$84,999
KYTC contract 25-5371: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of February 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy