KYTC contract 25-5398 bid tabulation

BRIDGE REPLACEMENT CR 1127. Let by Kentucky Transportation Cabinet on November 20, 2025. 3 bids received; low bid $1,389,701 by Jave LLC, +2.8% against the engineer's estimate of $1,351,547.

Owner
Kentucky Transportation Cabinet
Letting
20 NOV 2025
Pay items
37
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Jave LLC$1,389,701Low+3.0%
2Kay & Kay Contracting LLC$1,478,064+6.0%+9.0%
3Bush & Burchett Inc$2,188,166+57%+62%
KYTC contract 25-5398: bids by rank

Engineer's estimate: $1,351,547.

Bid tabulation

LinePay itemUnitQuantity1. Jave LLC2. Kay & Kay Contracting LLC3. Bush & Burchett Inc
0010Dga baseTON A A141$59.59$59.90$56.75
0020CL2 asph base 1.00D PG64-22TON A A76$300.62$286.30$286.30
0030CL2 asph surf 0.38D PG64-22TON A A27$307.81$93.15$293.15
0040Asphalt material for tack non-trackingTON A A0.12$1,050.00$1,000.00$1,000.00
0050Entrance pipe-15 inLF A A20$179.80$185.00$100.00
0060Delineator for guardrail BI directional whiteEACH A A4$13.65$13.00$13.00
0070Embankment in placeCUYD A A1,602$47.29$20.00$50.00
0080Guardrail-steel W beam-S faceLF A A12.50$33.60$32.00$32.00
0090Guardrail-steel W beam-S face ALF A A100$57.75$55.00$55.00
0100Guardrail end treatment type 7EACH A A4$2,205.00$2,100.00$2,100.00
0110Right-of-way monument type 1EACH A A7$210.00$191.26$200.00
0120Witness postEACH A A3$210.00$161.46$200.00
0130Clearing and grubbingLS A A1$38,886$51,650$250,000
0140Temporary signsSQFT A A168$7.35$16.96$20.00
0150Maintain & control trafficLS A A1$4,200.00$42,650$100,000
0160StakingLS A A1$6,510.00$10,000$24,000
0170Remove structureLS A A1$74,400$123,000$100,000
0180Erosion controlLS A A1$14,880$10,500$20,000
0190Structure granular backfillCUYD A A136.30$154.62$95.50$125.00
0200Armored edge for concreteLF A A24.90$159.96$186.00$150.00
0210Structure excav-solid rockCUYD A A66.80$239.32$370.50$150.00
0220Foundation preparationLS A A1$125,054$342,650$500,000
0230Cyclopean stone rip rapTON A A689$98.75$96.00$60.00
0240Test pilesLF A A62$163.68$148.00$300.00
0250Pre-drilling for pilesLF A A63$571.40$450.00$500.00
0260Piles-steel HP12X53LF A A153.90$155.00$135.00$125.00
0270Pile points-12 inEACH A A8$177.32$180.00$1.00
0280Concrete-class ACUYD A A176.10$1,602.08$1,200.00$1,650.00
0290Concrete-class AACUYD A A41.60$2,551.92$1,855.00$2,850.00
0300Steel reinforcementLB A A17,441$2.39$2.50$2.50
0310Steel reinforcement-epoxy coatedLB A A10,321$2.74$3.20$2.50
0320Precast PC box beam CB17-48LF A A247.30$445.16$338.00$650.00
0330Precast PC box beam CB33-48LF A A251.80$499.72$375.00$650.00
0340Concrete sealingSQFT A A5,178$2.62$2.25$3.00
0350Deep beam bridge guardrailLF A A333$220.29$185.00$185.00
0360Mobilization for concrete surf treatmentLS A A1$6,200.00$3,500.00$500.00
0370DemobilizationLS A A1$20,537$21,844$32,500
KYTC contract 25-5398: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of November 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy