Hinkle Environmental Services LLC: KYTC bid record
Hinkle Environmental Services LLC submitted 82 bids on Kentucky Transportation Cabinet contracts in the data, from 24 JAN 2020 to 23 OCT 2025, and was the low bidder on 40 of them (49%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $34,427,429
- Latest bid
- 23 OCT 2025
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 13 | 5 | 38% |
| 2021 | 22 | 12 | 55% |
| 2022 | 19 | 11 | 58% |
| 2023 | 18 | 8 | 44% |
| 2024 | 4 | 1 | 25% |
| 2025 | 6 | 3 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 12 | 66 | 33 | 50% |
| District 5 | 4 | 2 | 50% |
| District 3 | 2 | 2 | 100% |
| District 10 | 1 | 0 | 0% |
| District 2 | 1 | 0 | 0% |
| District 8 | 1 | 0 | 0% |
| District 9 | 1 | 0 | 0% |
| District 11 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Delineator for guardrail BI directional white | EACH | 67 | 61 (91%) | $15.00 | $14.19 | |
| Guardrail-steel W beam-S face | LF | 62 | 57 (92%) | $42.50 | $38.00 | |
| Guardrail end treatment type 7 | EACH | 57 | 52 (91%) | $1,575.26 | $1,610.68 | |
| Cribbing | SF | 68 | 35 (51%) | $8.00 | $8.85 | |
| Remove guardrail | LF | 47 | 34 (72%) | $5.00 | $3.56 | |
| Fabric-geotextile class 1 | SY | 42 | 34 (81%) | $3.00 | $3.00 | |
| Guardrail terminal section no 1 | EACH | 37 | 33 (89%) | $100.00 | $85.06 | |
| Fabric-geotextile class 2 | SY | 29 | 25 (86%) | $2.00 | $2.75 | |
| Excavation and backfill | CY | 66 | 24 (36%) | $75.00 | $75.00 | |
| Remove guardrail end treatment | EACH | 29 | 24 (83%) | $250.00 | $265.88 | |
| Dga base | TON | 42 | 18 (43%) | $60.00 | $45.00 | |
| Remove & reset guardrail | LF | 23 | 18 (78%) | $15.00 | $20.86 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Nattco Inc | 68 | 36 of 68 |
| Mac Construction & Excavating Inc | 3 | 2 of 3 |
| M & M Services Co Inc | 3 | 2 of 3 |
| Blue Rock LLC | 3 | 1 of 3 |
| Scotty'S Contracting & Stone LLC | 2 | 0 of 2 |
| Frederick & May Construction Co | 1 | 1 of 1 |
| Walker Construction & Materials LLC | 1 | 1 of 1 |
| Crown Contracting & Paving LLC | 1 | 1 of 1 |
| Knight Construction & Excavating Inc | 1 | 1 of 1 |
| Yager Materials Corp | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 OCT 2025 | 25-2365 | FLOOD REPAIR FOR FEMA KY 343, KY 588, KY 1148, KY 1410, KY 1811, KY 2034 & KY 2035 | 3 of 3 | $1,065,459 | +10% | |
| 25 SEP 2025 | 25-2353 | SLIDE REPAIR KY 1087, KY 1088, KY 1410 & KY 2759 FEMA REPAIRS | 2 of 3 | $714,499 | +7.0% | |
| 21 AUG 2025 | 25-4204 | GRADE & DRAIN WITH ASPHALT SURFACE WARSAW ROAD (KY 467) | 1 of 2 | $3,498,645 | Low, 34% under the second | |
| 21 AUG 2025 | 25-2326 | SLIDE REPAIR CARTER & LEWIS COUNTIES (US 60, KY 8, & KY 57) | 1 of 2 | $1,164,959 | Low, 14% under the second | |
| 22 MAY 2025 | 25-2240 | FLOOD REPAIR FOR FEMA FEMA FLOOD REPAIRS KY 1862, KY 3402, & KY 3410 | 2 of 3 | $1,189,602 | +7.0% | |
| 20 MAR 2025 | 25-2143 | District 11 | FLOOD REPAIR FOR FEMA KY 721 & KY 1102 FEMA SLIDE REPAIRS | 1 of 2 | $1,137,239 | Low, 7.0% under the second |
| 24 OCT 2024 | 24-2337 | District 9 | SLIDE REPAIR HILLSBORO ROAD (KY 111) | 3 of 4 | $307,815 | +25% |
| 18 JUL 2024 | 24-2256 | District 12 | SLIDE REPAIR OLD KY 80 (KY 550) | 1 of 3 | $184,932 | Low, 42% under the second |
| 20 JUN 2024 | 24-2244 | District 12 | SLIDE REPAIR HINDAMAN - PIPPA PASSES ROAD (KY 899) | 2 of 2 | $311,923 | +13% |
| 21 MAR 2024 | 24-1103 | District 8 | ASPHALT SURFACE WITH GRADE & DRAIN KY 501 | 5 of 5 | $786,487 | +58% |
| 26 OCT 2023 | 23-2460 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA FLOOD REPAIR PROJECTS | 2 of 3 | $759,479 | +8.0% |
| 28 SEP 2023 | 23-2416 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS LAWRENCE FEMA PROJECTS | 1 of 2 | $959,634 | Low, 7.0% under the second |
| 24 AUG 2023 | 23-2400 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA FLOOD REPAIR PROJECTS | 1 of 2 | $592,031 | Low, 1.0% under the second |
| 24 AUG 2023 | 23-2404 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA FLOOD REPAIR PROJECTS | 1 of 2 | $856,164 | Low, 2.0% under the second |
| 24 AUG 2023 | 23-2409 | District 12 | FLOOD REPAIR FOR FEMA VARIUS FEMA FLOOD REPAIR PROJECTS | 2 of 2 | $771,724 | +2.0% |
| 24 AUG 2023 | 23-2290 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA FLOOD REPAIR PROJECTS IN LETCHER COUNTY | 2 of 2 | $1,128,259 | +10% |
| 20 JUL 2023 | 23-4305 | District 5 | ASPHALT PAVEMENT & ROADWAY REHAB BALD KNOB ROAD (US 421) | 2 of 2 | $3,961,674 | +16% |
| 20 JUL 2023 | 23-2385 | District 12 | FLOOD REPAIR FOR FEMA KY 2040 & KY 3390 | 2 of 2 | $614,176 | +14% |
| 22 JUN 2023 | 23-2344 | District 12 | FLOOD REPAIR FOR FEMA HARGIS ROD (KY 1409) | 2 of 2 | $246,221 | +1.0% |
| 22 JUN 2023 | 23-2350 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA PROJECTS IN JOHNSON COUNTY | 2 of 2 | $276,777 | +6.0% |
| 25 MAY 2023 | 23-2306 | District 12 | FLOOD REPAIR FOR FEMA ELM ROCK/DECOY ROAD (KY 1098) | 2 of 2 | $183,973 | +23% |
| 25 MAY 2023 | 23-2277 | District 12 | FLOOD REPAIR FOR FEMA THORNTON CREEK ROAD (KY 1862) | 1 of 2 | $429,233 | Low, 6.0% under the second |
| 25 MAY 2023 | 23-2317 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA SLIDE REPAIRS IN KNOTT COUNTY | 1 of 2 | $961,648 | Low, 11% under the second |
| 27 APR 2023 | 23-2982 | District 12 | FLOOD REPAIR FOR FEMA SALT LICK CREEK ROAD (KY 2029) | 1 of 2 | $259,768 | Low, 15% under the second |
| 23 MAR 2023 | 23-4303 | District 5 | ASPHALT PAVEMENT & ROADWAY REHAB BALD KNOB ROAD (US 421) | 2 of 2 | $4,252,837 | +6.0% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.