Nattco Inc: KYTC bid record
Nattco Inc submitted 68 bids on Kentucky Transportation Cabinet contracts in the data, from 11 DEC 2020 to 23 OCT 2025, and was the low bidder on 34 of them (50%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $15,940,714
- Latest bid
- 23 OCT 2025
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 6 | 75% |
| 2021 | 20 | 10 | 50% |
| 2022 | 17 | 8 | 47% |
| 2023 | 15 | 7 | 47% |
| 2024 | 3 | 1 | 33% |
| 2025 | 5 | 2 | 40% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 12 | 62 | 32 | 52% |
| District 9 | 1 | 0 | 0% |
| District 11 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary signs | SF | 63 | 55 (87%) | $3.50 | $6.50 | |
| Railroad rails-drilled | LF | 63 | 52 (83%) | $22.00 | $26.00 | |
| Excavation and backfill | CY | 63 | 46 (73%) | $65.00 | $75.00 | |
| Guardrail-steel W beam-S face | LF | 61 | 43 (70%) | $45.00 | $38.00 | |
| Delineator for guardrail BI directional white | EACH | 62 | 42 (68%) | $15.00 | $14.19 | |
| Guardrail end treatment type 7 | EACH | 54 | 41 (76%) | $1,650.00 | $1,610.68 | |
| Barricade-type III | EACH | 51 | 40 (78%) | $25.00 | $150.00 | |
| Remove guardrail | LF | 43 | 37 (86%) | $5.00 | $3.56 | |
| Cribbing | SF | 63 | 36 (57%) | $8.00 | $8.85 | |
| Remove guardrail end treatment | EACH | 29 | 26 (90%) | $250.00 | $265.88 | |
| Dga base | TON | 37 | 23 (62%) | $60.00 | $45.00 | |
| Guardrail terminal section no 1 | EACH | 33 | 20 (61%) | $110.00 | $85.06 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hinkle Environmental Services LLC | 68 | 32 of 68 |
| M & M Services Co Inc | 3 | 2 of 3 |
| Blue Rock LLC | 3 | 1 of 3 |
| Alan Stone Co | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 OCT 2025 | 25-2365 | FLOOD REPAIR FOR FEMA KY 343, KY 588, KY 1148, KY 1410, KY 1811, KY 2034 & KY 2035 | 2 of 3 | $1,009,417 | +4.0% | |
| 25 SEP 2025 | 25-2353 | SLIDE REPAIR KY 1087, KY 1088, KY 1410 & KY 2759 FEMA REPAIRS | 1 of 3 | $666,597 | Low, 7.0% under the second | |
| 21 AUG 2025 | 25-2326 | SLIDE REPAIR CARTER & LEWIS COUNTIES (US 60, KY 8, & KY 57) | 2 of 2 | $1,324,244 | +14% | |
| 22 MAY 2025 | 25-2240 | FLOOD REPAIR FOR FEMA FEMA FLOOD REPAIRS KY 1862, KY 3402, & KY 3410 | 1 of 3 | $1,114,495 | Low, 7.0% under the second | |
| 20 MAR 2025 | 25-2143 | District 11 | FLOOD REPAIR FOR FEMA KY 721 & KY 1102 FEMA SLIDE REPAIRS | 2 of 2 | $1,222,064 | +7.0% |
| 24 OCT 2024 | 24-2337 | District 9 | SLIDE REPAIR HILLSBORO ROAD (KY 111) | 2 of 4 | $297,754 | +21% |
| 18 JUL 2024 | 24-2256 | District 12 | SLIDE REPAIR OLD KY 80 (KY 550) | 2 of 3 | $263,087 | +42% |
| 20 JUN 2024 | 24-2244 | District 12 | SLIDE REPAIR HINDAMAN - PIPPA PASSES ROAD (KY 899) | 1 of 2 | $276,943 | Low, 13% under the second |
| 26 OCT 2023 | 23-2460 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA FLOOD REPAIR PROJECTS | 3 of 3 | $788,412 | +12% |
| 28 SEP 2023 | 23-2416 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS LAWRENCE FEMA PROJECTS | 2 of 2 | $1,029,888 | +7.0% |
| 24 AUG 2023 | 23-2400 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA FLOOD REPAIR PROJECTS | 2 of 2 | $598,941 | +1.0% |
| 24 AUG 2023 | 23-2404 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA FLOOD REPAIR PROJECTS | 2 of 2 | $869,045 | +2.0% |
| 24 AUG 2023 | 23-2409 | District 12 | FLOOD REPAIR FOR FEMA VARIUS FEMA FLOOD REPAIR PROJECTS | 1 of 2 | $754,571 | Low, 2.0% under the second |
| 24 AUG 2023 | 23-2290 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA FLOOD REPAIR PROJECTS IN LETCHER COUNTY | 1 of 2 | $1,028,389 | Low, 10% under the second |
| 20 JUL 2023 | 23-2385 | District 12 | FLOOD REPAIR FOR FEMA KY 2040 & KY 3390 | 1 of 2 | $536,862 | Low, 14% under the second |
| 22 JUN 2023 | 23-2344 | District 12 | FLOOD REPAIR FOR FEMA HARGIS ROD (KY 1409) | 1 of 2 | $242,640 | Low, 1.0% under the second |
| 22 JUN 2023 | 23-2350 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA PROJECTS IN JOHNSON COUNTY | 1 of 2 | $260,280 | Low, 6.0% under the second |
| 25 MAY 2023 | 23-2306 | District 12 | FLOOD REPAIR FOR FEMA ELM ROCK/DECOY ROAD (KY 1098) | 1 of 2 | $149,278 | Low, 23% under the second |
| 25 MAY 2023 | 23-2277 | District 12 | FLOOD REPAIR FOR FEMA THORNTON CREEK ROAD (KY 1862) | 2 of 2 | $454,708 | +6.0% |
| 25 MAY 2023 | 23-2317 | District 12 | FLOOD REPAIR FOR FEMA VARIOUS FEMA SLIDE REPAIRS IN KNOTT COUNTY | 2 of 2 | $1,063,155 | +11% |
| 27 APR 2023 | 23-2982 | District 12 | FLOOD REPAIR FOR FEMA SALT LICK CREEK ROAD (KY 2029) | 2 of 2 | $298,398 | +15% |
| 23 MAR 2023 | 23-2161 | District 12 | SLIDE REPAIR CORNETTSVILLE - ISOM ROAD | 2 of 2 | $1,323,763 | +6.0% |
| 23 MAR 2023 | 23-2140 | District 12 | SLIDE REPAIR KY 201 & KY 644 | 1 of 2 | $250,894 | Low, 14% under the second |
| 08 DEC 2022 | 22-2571 | District 12 | FLOOD REPAIR FOR FEMA BALL BRANCH ROAD (KY 1087) | 1 of 2 | $617,128 | Low, 16% under the second |
| 22 SEP 2022 | 22-2511 | District 12 | SLIDE REPAIR ISONVILLE-BLAINE ROAD (KY 32) | 1 of 2 | $502,854 | Low, 11% under the second |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.