KYTC letting results, May 25, 2023
111 contracts let by Kentucky Transportation Cabinet on May 25, 2023, $96,306,647 in low bids, a median of 1 bidders per contract. On the 111 with an engineer's estimate, the low bid came in under it 57 times; median low bid -2.0% against the estimate.
- Owner
- Kentucky Transportation Cabinet
- Contracts
- 111
- Low bids, total
- $96,306,647
- Data through
- 22 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 23-2966 | BRIDGE REPAIRS SMITHSBORO ROAD (KY 15) | District 12 | 1 | Haydon Bridge Company Inc | $7,200,280 | +56% | KYTC | ||
| 23-1320 | ASPHALT PAVEMENT & ROADWAY REHAB I-471 | District 6 | 1 | Eaton Asphalt Paving Co Inc | $6,944,680 | +5.0% | KYTC | ||
| 23-4112 | GRADE & DRAIN CRANSTON ROAD (KY 377) | District 9 | 2 | Frederick & May Construction Co | $4,765,849 | $5,122,472 | +7.0% | -6.0% | KYTC |
| 23-1321 | ASPHALT SURFACE WITH GRADE & DRAIN US 62 (W STEPHEN FOSTER AVE) AND US 31E (CATHEDRAL MANOR) | District 4 | 1 | Louisville Paving Company Inc | $3,595,000 | +10% | KYTC | ||
| 23-4213 | GRADE & DRAIN BLOOMFIELD ROAD (KY 55) | District 4 | 2 | Rame Contracting LLC | $2,838,329 | $3,761,325 | +33% | +2.0% | KYTC |
| 23-1101 | BRIDGE REPLACEMENT OLD LAIR ROAD (CR 1124) | District 6 | 3 | Frederick & May Construction Co | $2,835,709 | $3,127,169 | +10% | -17% | KYTC |
| 23-4414 | ASPHALT PAVEMENT & ROADWAY REHAB KY HIGHWAY 36 (KY 36) | District 6 | 1 | Hinkle Contracting Company LLC | $2,767,433 | +18% | KYTC | ||
| 23-2283 | ASPHALT RESURFACING LEXINGTON ROAD (US 27) | District 7 | 1 | The Allen Company Inc | $2,699,028 | +10% | KYTC | ||
| 23-2967 | BRIDGE REPAIRS WESTERN KENTUCKY PARKWAY (PW 9001) | District 2 | 1 | Intech Contracting LLC | $2,442,374 | +16% | KYTC | ||
| 23-2111 | ASPHALT RESURFACING JEFFERSON COUNTY | District 5 | 4 | Louisville Paving Company Inc | $2,291,040 | $2,403,531 | +5.0% | -21% | KYTC |
| 23-2321 | CULVERT REPLACEMENT TACKY TOWN - BLEDSOE ROAD (KY 221) | District 11 | 3 | Kay & Kay Contracting LLC | $2,215,384 | $2,386,220 | +8.0% | -39% | KYTC |
| 23-2204 | ASPHALT RESURFACING CALHOUN ROAD (US 431) | District 2 | 1 | Yager Materials Corp | $2,197,820 | -2.0% | KYTC | ||
| 23-2969 | BRIDGE REPAIRS I-71 / I-75 / I-275 INTERCHANGE | District 6 | 3 | Delong Concrete LLC | $2,195,199 | $3,620,480 | +65% | -30% | KYTC |
| 23-2255 | ASPHALT RESURFACING PINEVILLE - MIDDLESBORO ROAD (US 25E) | District 11 | 1 | Hinkle Contracting Company LLC | $1,805,695 | +6.0% | KYTC | ||
| 23-2230 | ASPHALT RESURFACING OLD JACKSON-HAZARD ROAD (KY 476) | District 10 | 1 | Hinkle Contracting Company LLC | $1,653,705 | +1.0% | KYTC | ||
| 23-2017 | ASPHALT RESURFACING HUSTONVILLE ROAD (US 127) | District 7 | 1 | The Allen Company Inc | $1,583,119 | +14% | KYTC | ||
| 23-5404 | BRIDGE REPLACEMENT VARIOUS ROUTES IN DISTRICT 1 | District 1 | 1 | Jim Smith Contracting Company LLC | $1,499,724 | -18% | KYTC | ||
| 23-4207 | ASPHALT PAVEMENT & ROADWAY REHAB US HIGHWAY 421 (US 421) | District 11 | 1 | The Allen Company Inc | $1,289,801 | +3.0% | KYTC | ||
| 23-2227 | ASPHALT RESURFACING LIVERMORE ROAD (KY 136) | District 2 | 1 | Scotty'S Contracting & Stone LLC | $1,225,817 | +4.0% | KYTC | ||
| 23-2242 | ASPHALT RESURFACING HYDEN - HARLAN ROAD (US 421) | District 11 | 1 | Mountain Enterprises Inc | $1,224,992 | +8.0% | KYTC | ||
| 23-2218 | ASPHALT RESURFACING JOE PRATHER HIGHWAY (KY 313) | District 4 | 2 | Louisville Paving Company Inc | $1,192,173 | $1,429,027 | +20% | -22% | KYTC |
| 23-1102 | ASPHALT SURFACE WITH GRADE & DRAIN KY 1 | District 9 | 2 | Mountain Enterprises Inc | $1,093,905 | $1,241,325 | +13% | +16% | KYTC |
| 23-2239 | ASPHALT RESURFACING MCKEE TO SAND GAP ROAD (US 421) | District 11 | 1 | The Allen Company Inc | $992,615 | +10% | KYTC | ||
| 23-2235 | ASPHALT RESURFACING CANEY TO INDEX ROAD (KY 191) | District 10 | 1 | Hinkle Contracting Company LLC | $989,316 | +3.0% | KYTC | ||
| 23-2030 | ASPHALT RESURFACING FORT CAMPBELL BLVD (US 41A) | District 2 | 1 | Rogers Group Inc | $981,091 | +7.0% | KYTC | ||
| 23-2317 | FLOOD REPAIR FOR FEMA VARIOUS FEMA SLIDE REPAIRS IN KNOTT COUNTY | District 12 | 2 | Hinkle Environmental Services LLC | $961,648 | $1,063,155 | +11% | -13% | KYTC |
| 23-2296 | ASPHALT RESURFACING LEGRANDE HIGHWAY (KY 218) | District 4 | 1 | Scotty'S Contracting & Stone LLC | $900,492 | +9.0% | KYTC | ||
| 23-2978 | BRIDGE WITH GRADE, DRAIN & SURFACE WARNER RIDGE ROAD (KY 3281) | District 8 | 2 | Jave LLC | $898,314 | $910,707 | +1.0% | +7.0% | KYTC |
| 23-2229 | ASPHALT RESURFACING HAZARD BUISNESS ROUTE (KY 15X) | District 10 | 1 | Mountain Enterprises Inc | $888,603 | +4.0% | KYTC | ||
| 23-2219 | ASPHALT RESURFACING BLACK OAK - QUINCY ROAD (KY 8) | District 9 | 2 | Eaton Asphalt Paving Co Inc | $850,407 | $861,566 | +1.0% | -10% | KYTC |
| 23-2326 | ASPHALT RESURFACING TURKEY CREEK ROAD (KY 908) | District 12 | 1 | Mountain Enterprises Inc | $846,183 | -2.0% | KYTC | ||
| 23-4013 | SIGNS VARIOUS ROUTES IN DISTRICT 3 | District 3 | 2 | George B Stone Co LLC | $805,132 | $1,123,949 | +40% | -32% | KYTC |
| 23-2246 | ASPHALT RESURFACING DAVE COWENS DR./FAIRLFIELD AVE (KY 8X) | District 6 | 2 | Eaton Asphalt Paving Co Inc | $792,216 | $995,124 | +26% | -10% | KYTC |
| 23-2323 | ASPHALT RESURFACING JAMESTOWN - COLUMBIA ROAD (KY 55) | District 8 | 1 | Gaddie-Shamrock LLC | $771,871 | +7.0% | KYTC | ||
| 23-2325 | ASPHALT RESURFACING HAYDEN TO HARLAN ROAD (US 421) | District 11 | 1 | Mountain Enterprises Inc | $767,043 | +7.0% | KYTC | ||
| 23-2236 | ASPHALT RESURFACING WEST LIBERTY - STAFFORDSVILLE ROAD (KY 172) | District 10 | 1 | Hinkle Contracting Company LLC | $717,782 | +10% | KYTC | ||
| 23-3048 | ASPHALT RESURFACING VARIOUS ROADS IN CARTER COUNTY | District 9 | 1 | Mountain Enterprises Inc | $709,848 | 0.0% | KYTC | ||
| 23-2226 | ASPHALT RESURFACING ROCKPORT TO MCHENRY ROAD (US 62) | District 2 | 1 | Scotty'S Contracting & Stone LLC | $699,772 | +3.0% | KYTC | ||
| 23-2142 | ASPHALT RESURFACING BUTLER TO CALDWELL ROAD (KY 177) | District 6 | 2 | Mago Construction Company LLC | $680,478 | $722,460 | +6.0% | -6.0% | KYTC |
| 23-2144 | ASPHALT RESURFACING STANTON ROAD (KY 11) | District 10 | 2 | Hinkle Contracting Company LLC | $664,078 | $677,515 | +2.0% | -13% | KYTC |
| 23-2256 | ASPHALT RESURFACING CUMBERLAND FALLS HIGHWAY (US 25W) | District 11 | 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $648,843 | -15% | KYTC | ||
| 23-3041 | ASPHALT RESURFACING GOTT HYDRO ROAD (KY 1297) | District 3 | 1 | Scotty'S Contracting & Stone LLC | $632,889 | -6.0% | KYTC | ||
| 23-2300 | ASPHALT RESURFACING HODGENVILLE ROAD (KY 61) | District 4 | 1 | Haydon Materials LLC | $632,084 | -5.0% | KYTC | ||
| 23-1028 | ASPHALT SURFACE WITH GRADE & DRAIN KY-11 | District 10 | 1 | Hinkle Contracting Company LLC | $624,612 | +19% | KYTC | ||
| 23-3045 | ASPHALT RESURFACING VARIOUS PROJECTS IN PERRY COUNTY | District 10 | 1 | Mountain Enterprises Inc | $583,141 | +5.0% | KYTC | ||
| 23-2224 | ASPHALT RESURFACING WEBBS TO GREENSBURG ROAD (KY 88) | District 4 | 1 | Haydon Materials LLC | $580,771 | +1.0% | KYTC | ||
| 23-3039 | ASPHALT RESURFACING VARIOUS ROUTES IN BREATHITT COUNTY | District 10 | 1 | Hinkle Contracting Company LLC | $580,499 | +7.0% | KYTC | ||
| 23-7008 | BRIDGE REPLACEMENT OAKFIELD BRANCH (CR 1910) | District 12 | 3 | Central Bridge Co LLC | $579,642 | $631,005 | +9.0% | -7.0% | KYTC |
| 23-3037 | ASPHALT RESURFACING VARIOUS ROADS IN BRACKEN CO | District 6 | 3 | Mago Construction Company LLC | $568,722 | $569,717 | 0.0% | -3.0% | KYTC |
| 23-2222 | ASPHALT RESURFACING MAIN STREET (KY 259) | District 4 | 1 | Mago Construction Company LLC | $535,881 | -12% | KYTC | ||
| 23-2322 | ASPHALT RESURFACING JAMESTOWN - COLUMBIA ROAD (KY 55) | District 8 | 1 | Gaddie-Shamrock LLC | $523,827 | +6.0% | KYTC | ||
| 23-2251 | ASPHALT RESURFACING LEXINGTON ROAD (KY 34) | District 7 | 1 | The Allen Company Inc | $521,027 | +18% | KYTC | ||
| 23-5306 | BRIDGE SUPERSTRUCTURE REPLACEMENT KY 1861 SUNNYSIDE ROAD | District 5 | 5 | Louisville Paving Company Inc | $518,000 | $525,658 | +1.0% | -2.0% | KYTC |
| 23-3047 | ASPHALT RESURFACING VARIOUS ROADS IN LEWIS COUNTY | District 9 | 2 | H G Mays Corporation | $510,254 | $520,250 | +2.0% | -12% | KYTC |
| 23-2250 | ASPHALT RESURFACING GREEN ROAD (KY 11) | District 11 | 2 | L-M Asphalt Partners LTD D/B/A Ats Construction | $509,936 | $524,664 | +3.0% | -3.0% | KYTC |
| 23-2241 | ASPHALT RESURFACING CUMBERLAND GAP PARKWAY (US 25E) | District 11 | 2 | L-M Asphalt Partners LTD D/B/A Ats Construction | $499,274 | $509,765 | +2.0% | +9.0% | KYTC |
| 23-2071 | ASPHALT RESURFACING DAN RIDGE ROAD (KY 1693) | District 10 | 2 | Walker Construction & Materials LLC | $497,596 | $648,372 | +30% | -6.0% | KYTC |
| 23-3042 | ASPHALT RESURFACING VARIOUS ROADS IN BREATHITT CO | District 10 | 1 | Hinkle Contracting Company LLC | $495,966 | +9.0% | KYTC | ||
| 23-2203 | ASPHALT RESURFACING LIBERTY CHURCH ROAD (KY 2718) | District 2 | 1 | Scotty'S Contracting & Stone LLC | $494,852 | +3.0% | KYTC | ||
| 23-3043 | ASPHALT RESURFACING VARIOUS ROADS IN LEE COUNTY | District 10 | 1 | Hinkle Contracting Company LLC | $479,355 | +6.0% | KYTC | ||
| 23-2225 | ASPHALT RESURFACING JACKSON - CAMPTON - STANTON ROAD (KY 15) | District 10 | 2 | Hinkle Contracting Company LLC | $474,900 | $502,888 | +6.0% | -2.0% | KYTC |
| 23-2220 | ASPHALT RESURFACING GARVIN RIDGE ROAD (KY 2078) | District 9 | 2 | Bti Contracting Inc DBA Blacktop Industries | $461,640 | $475,740 | +3.0% | -8.0% | KYTC |
| 23-2214 | ASPHALT RESURFACING FRYMIRE TO PAYNEVILLE ROAD (KY 376) | District 4 | 4 of 5 | E & B Paving LLC | $459,503 | $462,006 | +1.0% | -19% | KYTC |
| 23-2231 | ASPHALT RESURFACING LINCOLN PARK ROAD (KY 528) | District 4 | 1 | Haydon Materials LLC | $454,656 | -11% | KYTC | ||
| 23-2210 | ASPHALT RESURFACING JAMESTOWN-RUSSELL SPRINGS ROAD (US 127) | District 8 | 1 | Gaddie-Shamrock LLC | $438,016 | +5.0% | KYTC | ||
| 23-2228 | ASPHALT RESURFACING GLOMAR - HAZARD ROAD (KY 451) | District 10 | 1 | Mountain Enterprises Inc | $432,483 | +4.0% | KYTC | ||
| 23-2277 | FLOOD REPAIR FOR FEMA THORNTON CREEK ROAD (KY 1862) | District 12 | 2 | Hinkle Environmental Services LLC | $429,233 | $454,708 | +6.0% | -9.0% | KYTC |
| 23-2276 | ASPHALT RESURFACING HARDMONEY TO SYMSONIA ROAD (KY 348) | District 1 | 1 | Jim Smith Contracting Company LLC | $411,626 | -2.0% | KYTC | ||
| 23-2234 | ASPHALT RESURFACING N MAIN STREET (US 68) | District 4 | 1 | Haydon Materials LLC | $407,202 | -3.0% | KYTC | ||
| 23-2252 | ASPHALT RESURFACING IRONWORKS ROAD (KY 15) | District 7 | 1 | The Allen Company Inc | $384,005 | 0.0% | KYTC | ||
| 23-2324 | ASPHALT RESURFACING CHAVIES - BUCKHORN ROAD (KY 28) | District 10 | 1 | Mountain Enterprises Inc | $378,486 | +8.0% | KYTC | ||
| 23-1027 | ASPHALT RESURFACING KY-11/KY-498 INTERSECTON | District 10 | 1 | Hinkle Contracting Company LLC | $377,028 | +28% | KYTC | ||
| 23-2063 | ASPHALT RESURFACING SALYERSVILLE - PAINTSVILLE ROAD (KY 40) | District 12 | 2 | Mountain Enterprises Inc | $337,119 | $354,585 | +5.0% | -1.0% | KYTC |
| 23-2253 | ASPHALT RESURFACING OLD OAKLAND ROAD (KY 165) | District 6 | 3 | Mago Construction Company LLC | $329,337 | $340,991 | +4.0% | -13% | KYTC |
| 23-2217 | ASPHALT RESURFACING BURKESVILLE - CELINA ROAD (KY 61) | District 8 | 1 | Gaddie-Shamrock LLC | $321,290 | +1.0% | KYTC | ||
| 23-2215 | ASPHALT RESURFACING GLASGOW - MARROWBONE ROAD (KY 90) | District 8 | 1 | Gaddie-Shamrock LLC | $308,835 | +9.0% | KYTC | ||
| 23-2238 | ASPHALT RESURFACING IRVINE BYPASS (KY 499) | District 10 | 1 | Hinkle Contracting Company LLC | $288,649 | +5.0% | KYTC | ||
| 23-2295 | ASPHALT RESURFACING HAMMONSVILLE ROAD (KY 357) | District 4 | 1 | Scotty'S Contracting & Stone LLC | $279,730 | +1.0% | KYTC | ||
| 23-2266 | ASPHALT RESURFACING WINCHESTER ROAD (KY 186) | District 11 | 1 | Hinkle Contracting Company LLC | $270,079 | +15% | KYTC | ||
| 23-2243 | ASPHALT RESURFACING LEESTOWN ROAD (US 421) | District 5 | 2 | H G Mays Corporation | $266,550 | $336,120 | +26% | -34% | KYTC |
| 23-2245 | ASPHALT RESURFACING OLD LAWRENCEBURG ROAD (KY 420) | District 5 | 2 | H G Mays Corporation | $262,340 | $305,849 | +17% | -17% | KYTC |
| 23-3044 | ASPHALT RESURFACING KY 1261 (KY 1261) | District 10 | 1 | Hinkle Contracting Company LLC | $255,401 | +9.0% | KYTC | ||
| 23-4703 | HIGH FRICTION SURFACE VARIOUS ROUTES IN BATH AND MONTGOMERY COUNTIES | District 7 | 3 | Deangelo Contracting Services LLC | $247,021 | $248,248 | 0.0% | -34% | KYTC |
| 23-2081 | ASPHALT RESURFACING OLD MAYFIELD ROAD (KY 994) | District 1 | 1 | Jim Smith Contracting Company LLC | $246,043 | -5.0% | KYTC | ||
| 23-2275 | ASPHALT RESURFACING LEBANON CHURCH ROAD (KY 1288) | District 1 | 1 | Jim Smith Contracting Company LLC | $244,443 | -6.0% | KYTC | ||
| 23-3046 | ASPHALT RESURFACING VARIOUS ROADS IN OWSLEY COUNTY | District 10 | 1 | Hinkle Contracting Company LLC | $241,733 | +4.0% | KYTC | ||
| 23-2291 | ASPHALT RESURFACING TAYLORSVILLE LAKE STATE PARK - SETTLER'S TRACE | District 5 | 3 | Louisville Paving Company Inc | $240,575 | $261,044 | +9.0% | -30% | KYTC |
| 23-4108 | HIGH FRICTION SURFACE KY HIGHWAY 90 (KY 90) | District 8 | 3 | The Truesdell Corporation | $239,239 | $246,044 | +3.0% | -30% | KYTC |
| 23-2316 | ASPHALT RESURFACING TAYLORSVILLE ROAD (KY 55) | District 4 | 1 | Mago Construction Company LLC | $223,438 | -18% | KYTC | ||
| 23-4706 | HIGH FRICTION SURFACE VARIOUS ROUTES IN DISTRICT 7 | District 7 | 3 | The Truesdell Corporation | $208,208 | $219,756 | +6.0% | -21% | KYTC |
| 23-4705 | HIGH FRICTION SURFACE INTERSTATE 75 RAMPS 711 & 331 | District 7 | 3 | The Truesdell Corporation | $205,205 | $209,868 | +2.0% | -8.0% | KYTC |
| 23-2261 | ASPHALT RESURFACING FARMERS - SHARKEY ROAD (KY 801) | District 9 | 1 | Hinkle Contracting Company LLC | $204,816 | +4.0% | KYTC | ||
| 23-2274 | ASPHALT RESURFACING CUBA TO MAYFIELD ROAD (KY 303) | District 1 | 1 | Jim Smith Contracting Company LLC | $197,772 | -2.0% | KYTC | ||
| 23-2327 | PIPE REPLACEMENT S. L. ROGER WELLS BLVD. (US 31E) | District 3 | 1 | Scotty'S Contracting & Stone LLC | $164,628 | -8.0% | KYTC | ||
| 23-2306 | FLOOD REPAIR FOR FEMA ELM ROCK/DECOY ROAD (KY 1098) | District 12 | 2 | Nattco Inc | $149,278 | $183,973 | +23% | +1.0% | KYTC |
| 23-2223 | ASPHALT RESURFACING IRVINE - BEATTYVILLE - JACKSON ROAD (KY 52) | District 10 | 1 | Hinkle Contracting Company LLC | $148,345 | -17% | KYTC | ||
| 23-2304 | ASPHALT RESURFACING LOWER MCINTOSH ROAD (KY 3425) | District 11 | 1 | Mountain Enterprises Inc | $138,172 | +13% | KYTC | ||
| 23-4408 | HIGH FRICTION SURFACE HUNTERTOWN ROAD (CR 1100) | District 7 | 3 | A & A Safety Inc | $137,631 | $141,905 | +3.0% | -5.0% | KYTC |
| 23-2301 | ASPHALT RESURFACING BRADSFORDVILLE ROAD (KY 49) | District 4 | 1 | Haydon Materials LLC | $137,047 | +3.0% | KYTC | ||
| 23-2267 | ASPHALT RESURFACING HWY 1150 (KY 1150) | District 8 | 1 | The Allen Company Inc | $136,721 | +27% | KYTC | ||
| 23-2289 | ASPHALT RESURFACING BID EDDY ROAD (KY 1263) | District 5 | 2 | H G Mays Corporation | $135,091 | $153,857 | +14% | -21% | KYTC |
| 23-2216 | ASPHALT RESURFACING KINGSWOOD ORCH LANE (KY 232) | District 4 | 1 | Mago Construction Company LLC | $132,497 | 0.0% | KYTC | ||
| 23-2258 | ASPHALT RESURFACING FULTON ROAD (US 45) | District 1 | 1 | Jim Smith Contracting Company LLC | $131,099 | -11% | KYTC | ||
| 23-2232 | ASPHALT RESURFACING CALVARY ROAD (KY 208) | District 4 | 1 | Haydon Materials LLC | $129,745 | -6.0% | KYTC | ||
| 23-2302 | ASPHALT RESURFACING SOUTH MAIN STREET (KY 2344) | District 7 | 1 | The Allen Company Inc | $129,163 | -14% | KYTC | ||
| 23-4704 | HIGH FRICTION SURFACE FRANKFORT RD (US 460) | District 7 | 2 | Deangelo Contracting Services LLC | $123,339 | $148,148 | +20% | +40% | KYTC |
| 23-4707 | HIGH FRICTION SURFACE BEREA ROAD (US 25) | District 7 | 3 | A & A Safety Inc | $120,993 | $148,148 | +22% | -12% | KYTC |
| 23-2310 | ASPHALT RESURFACING SOUTHEASTERN PARKWAY (KY 2117) | District 2 | 1 | Yager Materials Corp | $114,738 | -9.0% | KYTC | ||
| 23-2237 | ASPHALT RESURFACING DENNISTON ROAD (US 460) | District 10 | 1 | Walker Construction & Materials LLC | $96,387 | -5.0% | KYTC | ||
| 23-2257 | ASPHALT RESURFACING MURPHYSVILLE - WASHINGTON ROAD (US 62) | District 9 | 2 | Eaton Asphalt Paving Co Inc | $94,991 | $97,742 | +3.0% | -22% | KYTC |
| 23-2303 | ASPHALT RESURFACING LAKE LINVILLE ROAD (KY 2793) | District 8 | 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $69,071 | -11% | KYTC |
Gap is the second bid over the low bid. Where a contract shows fewer bids than KYTC received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.