Bti Contracting Inc DBA Blacktop Industries: KYTC bid record

Bti Contracting Inc DBA Blacktop Industries submitted 66 bids on Kentucky Transportation Cabinet contracts in the data, from 23 APR 2021 to 24 SEP 2026, and was the low bidder on 18 of them (27%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$8,984,088
Latest bid
24 SEP 2026
Data through
22 OCT 2026
66Bids
18Low bids
27Win rate, percent
+7.0%Median gap to the low bid when not low, 48 bids

By year

YearBidsLow bidsWin rate
202118317%
20225120%
202313431%
202414429%
20259222%
20267457%
Bti Contracting Inc DBA Blacktop Industries, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 927622%
District 1215533%
District 1010110%
Bti Contracting Inc DBA Blacktop Industries, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Fuel adjustmentDOL3333 (100%)$1.00$1.00
Asphalt adjustmentDOL3333 (100%)$1.00$1.00
Asphalt material for tackTON2922 (76%)$10.00$10.00
Pave striping-perm paint-4 inLF3217 (53%)$0.20$0.29
Temporary signsSF2515 (60%)$1.00$6.50
Asphalt pave milling & texturingTON4213 (31%)$52.50$36.50
Edgeline rumble stripsLF1911 (58%)$0.25$0.26
Dga baseTON2610 (38%)$44.25$45.00
Mobilization for mill & textLS A A1710 (59%)$2,500.00$3,500.00
Asphalt pave milling & texturingTON A A1310 (77%)$70.00$35.15
Pave striping-temp paint-4 inLF A A1210 (83%)$0.01$0.16
CL2 asph surf 0.38D PG64-22TON459 (20%)$106.70$102.95
Bti Contracting Inc DBA Blacktop Industries, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Bti Contracting Inc DBA Blacktop Industries, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
24 SEP 202626-3039ASPHALT RESURFACING VARIOUS ROADS IN MENIFEE CO2 of 2$366,519+16%
03 SEP 202626-3032ASPHALT RESURFACING KY 1090 (KY 1090)1 of 2$292,945Low, 5.0% under the second
03 SEP 202626-3033ASPHALT RESURFACING KY 650 (KY 650)1 of 2$317,763Low, 8.0% under the second
26 MAR 202626-2090ASPHALT RESURFACING GREENUP - WARNOCK ROAD (KY 2)1 of 2$968,786Low, 8.0% under the second
26 MAR 202626-2133ASPHALT RESURFACING MALONETON - SOUTH SHORE ROAD (KY 7)1 of 2$1,055,366Low, 11% under the second
26 MAR 202626-2115ASPHALT RESURFACING WEST LIBERTY - PAINTSVILLE ROAD (KY 172)2 of 2$254,839+6.0%
19 FEB 202626-2104ASPHALT RESURFACING KY 59 & KY 2 IN CARTER COUNTY2 of 2$971,886+2.0%
23 OCT 202525-3125ASPHALT RESURFACING MOORES FERRY (KY 211)2 of 2$461,382+5.0%
23 OCT 202525-3126ASPHALT RESURFACING KY 557 (KY 557)2 of 2$403,068+2.0%
23 OCT 202525-3127ASPHALT RESURFACING VARIOUS ROADS IN ROWAN CO2 of 2$195,746+6.0%
21 AUG 202525-2328ASPHALT RESURFACING FALLSBURG - WEBBVILLE ROAD (KY 1)1 of 2$457,278Low, 5.0% under the second
21 AUG 202525-3107ASPHALT RESURFACING KY 1261 (KY 1261)2 of 2$360,687+2.0%
05 JUN 202525-3055ASPHALT RESURFACING RUSH ROAD (KY 854)1 of 2$341,607Low, 11% under the second
05 JUN 202525-3046ASPHALT RESURFACING VARIOUS ROADS IN MENIFEE CO2 of 2$538,593+11%
20 MAR 202525-2104District 9ASPHALT RESURFACING CAROLINE ROAD (KY 693)2 of 2$478,298+4.0%
20 FEB 202525-3009District 9ASPHALT RESURFACING LITTLE FORK RD (KY 486)2 of 2$337,208+8.0%
12 DEC 202424-2420District 9ASPHALT RESURFACING HORTON FLATS ROAD (KY 3353)1 of 2$216,224Low, 4.0% under the second
12 DEC 202424-2419District 12ASPHALT RESURFACING ELNA ROAD (KY 3214)1 of 2$329,856Low, 3.0% under the second
12 DEC 202424-3127District 10ASPHALT RESURFACING KY 746 (KY 746)2 of 2$275,894+6.0%
14 NOV 202424-2373District 9ASPHALT RESURFACING SUMMIT ROAD (KY 716)2 of 2$318,578+8.0%
14 NOV 202424-2375District 12ASPHALT RESURFACING PAINTSVILLE - WEST LIBERTY ROAD (KY 172)2 of 2$313,886+8.0%
22 AUG 202424-3054District 9ASPHALT RESURFACING WHITES CREEK RD (KY 757)2 of 2$419,664+2.0%
25 APR 202424-2163District 12ASPHALT RESURFACING LOWER JOHN'S CREEK ROAD (KY 194)2 of 2$2,903,046+104%
25 APR 202424-2104District 12ASPHALT RESURFACING SOUTH POCAHONTAS STREET (KY 2565) (OMIT MP 3.090-3.240)2 of 2$620,408+9.0%
25 APR 202424-2106District 12ASPHALT RESURFACING PAINTSVILLE TO BLAINE ROAD (KY 201)2 of 2$1,625,0400.0%
Bti Contracting Inc DBA Blacktop Industries: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy