KYTC contract 26-2133 bid tabulation
ASPHALT RESURFACING MALONETON - SOUTH SHORE ROAD (KY 7). Let by Kentucky Transportation Cabinet on March 26, 2026. 2 bids received; low bid $1,055,366 by Bti Contracting Inc DBA Blacktop Industries, -14% against the engineer's estimate of $1,223,869.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 26 MAR 2026
- Pay items
- 31
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Bti Contracting Inc DBA Blacktop Industries | $1,055,366 | Low | -14% |
| 2 | Mountain Enterprises Inc | $1,169,888 | +11% | -4.0% |
Engineer's estimate: $1,223,869.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bti Contracting Inc DBA Blacktop Industries | 2. Mountain Enterprises Inc |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 455 | $53.00 | $68.50 |
| 0020 | Leveling & wedging PG64-22 | TON A A | 915 | $108.50 | $116.25 |
| 0030 | CL2 asph base 0.75D PG64-22 | TON A A | 325 | $105.00 | $151.25 |
| 0040 | CL2 asph surf 0.38D PG64-22 | TON A A | 6,355 | $108.50 | $116.25 |
| 0050 | Asphalt material for tack | TON A A | 58 | $10.00 | $10.00 |
| 0060 | Temporary signs | SQFT A A | 365 | $0.01 | $0.01 |
| 0070 | Maintain & control traffic | LS A A | 1 | $16,750 | $22,250 |
| 0080 | Portable changeable message sign | EACH A A | 2 | $750.00 | $1,350.00 |
| 0090 | Mobilization for mill & text | LS A A | 1 | $2,500.00 | $3,000.00 |
| 0100 | Asphalt pave milling & texturing | TON A A | 920 | $43.43 | $54.10 |
| 0110 | Edgeline rumble strips | LF A A | 60,200 | $0.28 | $0.28 |
| 0120 | Sidewalk-4 in concrete | SQYD A A | 47 | $106.50 | $324.25 |
| 0130 | Arrow panel | EACH A A | 2 | $500.00 | $1,100.00 |
| 0140 | Pave striping-temp paint-4 in | LF A A | 50,000 | $0.01 | $0.07 |
| 0150 | Pave striping-perm paint-6 in | LF A A | 150,000 | $0.22 | $0.22 |
| 0160 | Pave striping-dur TY 1-6 in W | LF A A | 360 | $8.00 | $8.00 |
| 0170 | Pave striping-dur TY 1-6 in Y | LF A A | 360 | $8.00 | $8.00 |
| 0180 | Pave marking-thermo R 6 FT | EACH A A | 2 | $125.00 | $125.00 |
| 0190 | Pave marking-R/R xbucks 16 in | LF A A | 40 | $8.00 | $8.00 |
| 0200 | Pave marking-thermo X-walk-12 in | LF A A | 345 | $6.00 | $6.00 |
| 0210 | Pave marking-thermo stop bar-24IN | LF A A | 174 | $10.00 | $10.00 |
| 0220 | Fuel adjustment | DOLL A A | 11,822 | $1.00 | $1.00 |
| 0230 | Asphalt adjustment | DOLL A A | 29,693 | $1.00 | $1.00 |
| 0240 | Detectable warnings | SQFT A A | 48 | $50.00 | $89.50 |
| 0250 | Detectable warnings | SQFT A A | 8 | $50.00 | $181.75 |
| 0260 | Pave mark TY 1 tape X-walk-6 in | LF A A | 414 | $10.00 | $10.00 |
| 0270 | Pave mark TY 1 tape cross-hatch | SQFT A A | 500 | $24.00 | $24.00 |
| 0280 | Pave mark TY 1 tape stop bar-24 in | LF A A | 90 | $40.00 | $40.00 |
| 0290 | Pave mark TY 1 tape R/R X bucks-16 in | LF A A | 40 | $35.00 | $35.00 |
| 0300 | Electronic delivery MGMT system - agg | LS A A | 1 | $100.00 | $100.00 |
| 0310 | Demobilization | LS A A | 1 | $14,985 | $16,680 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of March 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.