Rame Contracting LLC: KYTC bid record
Rame Contracting LLC submitted 49 bids on Kentucky Transportation Cabinet contracts in the data, from 11 DEC 2020 to 24 SEP 2026, and was the low bidder on 29 of them (59%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $58,246,983
- Latest bid
- 24 SEP 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 2 | 67% |
| 2021 | 12 | 6 | 50% |
| 2022 | 15 | 11 | 73% |
| 2023 | 6 | 4 | 67% |
| 2024 | 2 | 0 | 0% |
| 2025 | 8 | 4 | 50% |
| 2026 | 3 | 2 | 67% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 15 | 12 | 80% |
| District 5 | 6 | 4 | 67% |
| District 3 | 5 | 2 | 40% |
| District 1 | 5 | 4 | 80% |
| District 8 | 4 | 2 | 50% |
| District 2 | 4 | 1 | 25% |
| District 7 | 2 | 0 | 0% |
| District 9 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary signs | SF | 24 | 15 (63%) | $5.16 | $6.50 | |
| Concrete-class A | CY | 16 | 10 (63%) | $1,143.31 | $1,088.01 | |
| Clean silt trap type B | EACH | 11 | 10 (91%) | $10.00 | $34.95 | |
| Remove pipe | LF | 11 | 9 (82%) | $20.00 | $30.00 | |
| Temp seeding and protection | SY | 12 | 8 (67%) | $0.30 | $0.30 | |
| Clean silt trap type C | EACH | 9 | 8 (89%) | $10.00 | $32.48 | |
| Clean temp ditch | LF | 9 | 8 (89%) | $0.10 | $0.50 | |
| Asphalt seal coat | TON | 13 | 7 (54%) | $1,228.95 | $1,370.39 | |
| Steel reinforcement | LB | 12 | 7 (58%) | $1.89 | $1.85 | |
| Pave striping-temp paint-4 in | LF | 11 | 7 (64%) | $0.30 | $0.20 | |
| Temp silt fence | LF | 11 | 7 (64%) | $3.25 | $3.10 | |
| Temp mulch | SY | 11 | 7 (64%) | $0.30 | $0.28 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Louisville Paving Company Inc | 13 | 5 of 13 |
| Cleary Construction Inc | 8 | 2 of 8 |
| Scotty'S Contracting & Stone LLC | 7 | 5 of 7 |
| Scott and Murphy Inc | 7 | 5 of 7 |
| Mac Construction & Excavating Inc | 4 | 0 of 4 |
| Adams Contracting LLC | 4 | 0 of 4 |
| Hinkle Construction Services LLC | 3 | 0 of 3 |
| A S L Excavating Inc | 3 | 0 of 3 |
| Charles Deweese Construction Inc | 3 | 2 of 3 |
| The Allen Company Inc | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 SEP 2026 | 26-4128 | ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 90 (KY 90) | 3 of 3 | $3,866,045 | +7.0% | |
| 21 MAY 2026 | 26-1119 | ASPHALT SURFACE WITH GRADE & DRAIN LAFAYETTE ROAD(KY 107) | 1 of 3 | $2,346,915 | Low, 4.0% under the second | |
| 23 APR 2026 | 26-4111 | WIDENING KY HIGHWAY 90 (KY 90) | 1 of 1 | $1,258,397 | Low | |
| 23 OCT 2025 | 25-1015 | GRADE & DRAIN WITH ASPHALT SURFACE EAST MAIN STREET(US-68) | 1 of 3 | $5,463,310 | Low, 17% under the second | |
| 21 AUG 2025 | 25-1114 | ASPHALT SURFACE WITH GRADE & DRAIN US 68 | 2 of 3 | $2,835,403 | 0.0% | |
| 21 AUG 2025 | 25-4205 | ASPHALT SURFACE WITH GRADE & DRAIN BURGIN ROAD (KY 152) | 3 of 3 | $406,731 | +18% | |
| 21 AUG 2025 | 25-1019 | GRADE & DRAIN WITH ASPHALT SURFACE KY-55X AND KY-43 | 4 of 4 | $1,350,783 | +23% | |
| 24 APR 2025 | 25-1301 | District 5 | GRADE & DRAIN WITH ASPHALT SURFACE VANDALAY DRIVE (CS 1212) AND WEST RIDGE ROAD (CS 1213) | 4 of 5 | $3,999,365 | +22% |
| 20 MAR 2025 | 25-1104 | District 8 | GRADE, DRAIN & SURFACE WITH BRIDGE NEW BURNSIDE CONNECTOR (NEW ROUTE) | 1 of 2 | $4,377,579 | Low, 6.0% under the second |
| 20 FEB 2025 | 25-1303 | District 4 | GRADE & DRAIN WITH ASPHALT SURFACE KY 2154 | 1 of 3 | $2,871,680 | Low, 9.0% under the second |
| 23 JAN 2025 | 25-4100 | District 9 | GRADE & DRAIN WITH ASPHALT SURFACE AA HIGHWAY (KY 9) | 1 of 3 | $695,225 | Low, 16% under the second |
| 20 JUN 2024 | 24-1312 | District 4 | GRADE & DRAIN WITH ASPHALT SURFACE US150 | 2 of 3 | $19,900,000 | +2.0% |
| 21 MAR 2024 | 24-1103 | District 8 | ASPHALT SURFACE WITH GRADE & DRAIN KY 501 | 3 of 5 | $560,575 | +12% |
| 26 OCT 2023 | 23-4107 | District 8 | WIDENING US HIGHWAY 127 (US 127) | 2 of 3 | $3,095,759 | +6.0% |
| 22 JUN 2023 | 23-1030 | District 1 | ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 60 (US 60) | 2 of 2 | $2,040,411 | +8.0% |
| 25 MAY 2023 | 23-4213 | District 4 | GRADE & DRAIN BLOOMFIELD ROAD (KY 55) | 1 of 2 | $2,838,329 | Low, 33% under the second |
| 23 MAR 2023 | 23-4211 | District 4 | GRADE & DRAIN BLOOMFIELD ROAD (KY 55) | 1 of 1 | $3,005,975 | Low |
| 23 FEB 2023 | 23-1301 | District 4 | GRADE & DRAIN WITH ASPHALT SURFACE LORETTO ROAD (KY49) | 1 of 2 | $4,800,496 | Low, 4.0% under the second |
| 23 FEB 2023 | 23-4202 | District 4 | GRADE & DRAIN WITH ASPHALT SURFACE ST MARY'S ROAD (KY 84) | 1 of 1 | $1,312,966 | Low |
| 22 SEP 2022 | 22-4327 | District 1 | ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 60 (US 60) | 1 of 1 | $1,002,543 | Low |
| 22 SEP 2022 | 22-1050 | District 1 | ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 60 (US 60) | 1 of 1 | $806,786 | Low |
| 22 SEP 2022 | 22-1345 | District 2 | ASPHALT SURFACE WITH GRADE & DRAIN HILL BRIDGE ROAD (KY 298) | 2 of 2 | $768,852 | +30% |
| 18 AUG 2022 | 22-1047 | District 4 | GRADE & DRAIN WITH ASPHALT SURFACE EDMONTON ROAD(US-68) | 1 of 1 | $6,200,799 | Low |
| 21 JUL 2022 | 22-4444 | District 2 | ASPHALT REHAB WITH GRADE & DRAIN FREDERICA STREET (US 431) | 1 of 1 | $761,624 | Low |
| 21 JUL 2022 | 22-4321 | District 1 | ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 60 (US 60) | 1 of 1 | $975,271 | Low |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.