Rame Contracting LLC: KYTC bid record

Rame Contracting LLC submitted 49 bids on Kentucky Transportation Cabinet contracts in the data, from 11 DEC 2020 to 24 SEP 2026, and was the low bidder on 29 of them (59%). When it was not low, its total sat a median +19% above the low bid.

Owner
Kentucky Transportation Cabinet
Low bid volume
$58,246,983
Latest bid
24 SEP 2026
Data through
22 OCT 2026
49Bids
29Low bids
59Win rate, percent
+19%Median gap to the low bid when not low, 20 bids

By year

YearBidsLow bidsWin rate
20203267%
202112650%
2022151173%
20236467%
2024200%
20258450%
20263267%
Rame Contracting LLC, KYTC: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 4151280%
District 56467%
District 35240%
District 15480%
District 84250%
District 24125%
District 7200%
District 911100%
Rame Contracting LLC, KYTC: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary signsSF2415 (63%)$5.16$6.50
Concrete-class ACY1610 (63%)$1,143.31$1,088.01
Clean silt trap type BEACH1110 (91%)$10.00$34.95
Remove pipeLF119 (82%)$20.00$30.00
Temp seeding and protectionSY128 (67%)$0.30$0.30
Clean silt trap type CEACH98 (89%)$10.00$32.48
Clean temp ditchLF98 (89%)$0.10$0.50
Asphalt seal coatTON137 (54%)$1,228.95$1,370.39
Steel reinforcementLB127 (58%)$1.89$1.85
Pave striping-temp paint-4 inLF117 (64%)$0.30$0.20
Temp silt fenceLF117 (64%)$3.25$3.10
Temp mulchSY117 (64%)$0.30$0.28
Rame Contracting LLC, KYTC: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Louisville Paving Company Inc135 of 13
Cleary Construction Inc82 of 8
Scotty'S Contracting & Stone LLC75 of 7
Scott and Murphy Inc75 of 7
Mac Construction & Excavating Inc40 of 4
Adams Contracting LLC40 of 4
Hinkle Construction Services LLC30 of 3
A S L Excavating Inc30 of 3
Charles Deweese Construction Inc32 of 3
The Allen Company Inc33 of 3
Rame Contracting LLC, KYTC: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
24 SEP 202626-4128ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 90 (KY 90)3 of 3$3,866,045+7.0%
21 MAY 202626-1119ASPHALT SURFACE WITH GRADE & DRAIN LAFAYETTE ROAD(KY 107)1 of 3$2,346,915Low, 4.0% under the second
23 APR 202626-4111WIDENING KY HIGHWAY 90 (KY 90)1 of 1$1,258,397Low
23 OCT 202525-1015GRADE & DRAIN WITH ASPHALT SURFACE EAST MAIN STREET(US-68)1 of 3$5,463,310Low, 17% under the second
21 AUG 202525-1114ASPHALT SURFACE WITH GRADE & DRAIN US 682 of 3$2,835,4030.0%
21 AUG 202525-4205ASPHALT SURFACE WITH GRADE & DRAIN BURGIN ROAD (KY 152)3 of 3$406,731+18%
21 AUG 202525-1019GRADE & DRAIN WITH ASPHALT SURFACE KY-55X AND KY-434 of 4$1,350,783+23%
24 APR 202525-1301District 5GRADE & DRAIN WITH ASPHALT SURFACE VANDALAY DRIVE (CS 1212) AND WEST RIDGE ROAD (CS 1213)4 of 5$3,999,365+22%
20 MAR 202525-1104District 8GRADE, DRAIN & SURFACE WITH BRIDGE NEW BURNSIDE CONNECTOR (NEW ROUTE)1 of 2$4,377,579Low, 6.0% under the second
20 FEB 202525-1303District 4GRADE & DRAIN WITH ASPHALT SURFACE KY 21541 of 3$2,871,680Low, 9.0% under the second
23 JAN 202525-4100District 9GRADE & DRAIN WITH ASPHALT SURFACE AA HIGHWAY (KY 9)1 of 3$695,225Low, 16% under the second
20 JUN 202424-1312District 4GRADE & DRAIN WITH ASPHALT SURFACE US1502 of 3$19,900,000+2.0%
21 MAR 202424-1103District 8ASPHALT SURFACE WITH GRADE & DRAIN KY 5013 of 5$560,575+12%
26 OCT 202323-4107District 8WIDENING US HIGHWAY 127 (US 127)2 of 3$3,095,759+6.0%
22 JUN 202323-1030District 1ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 60 (US 60)2 of 2$2,040,411+8.0%
25 MAY 202323-4213District 4GRADE & DRAIN BLOOMFIELD ROAD (KY 55)1 of 2$2,838,329Low, 33% under the second
23 MAR 202323-4211District 4GRADE & DRAIN BLOOMFIELD ROAD (KY 55)1 of 1$3,005,975Low
23 FEB 202323-1301District 4GRADE & DRAIN WITH ASPHALT SURFACE LORETTO ROAD (KY49)1 of 2$4,800,496Low, 4.0% under the second
23 FEB 202323-4202District 4GRADE & DRAIN WITH ASPHALT SURFACE ST MARY'S ROAD (KY 84)1 of 1$1,312,966Low
22 SEP 202222-4327District 1ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 60 (US 60)1 of 1$1,002,543Low
22 SEP 202222-1050District 1ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 60 (US 60)1 of 1$806,786Low
22 SEP 202222-1345District 2ASPHALT SURFACE WITH GRADE & DRAIN HILL BRIDGE ROAD (KY 298)2 of 2$768,852+30%
18 AUG 202222-1047District 4GRADE & DRAIN WITH ASPHALT SURFACE EDMONTON ROAD(US-68)1 of 1$6,200,799Low
21 JUL 202222-4444District 2ASPHALT REHAB WITH GRADE & DRAIN FREDERICA STREET (US 431)1 of 1$761,624Low
21 JUL 202222-4321District 1ASPHALT SURFACE WITH GRADE & DRAIN US HIGHWAY 60 (US 60)1 of 1$975,271Low
Rame Contracting LLC: latest KYTC bids in the data

How this record was read

KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.