KYTC contract 25-1301 bid tabulation

GRADE & DRAIN WITH ASPHALT SURFACE VANDALAY DRIVE (CS 1212) AND WEST RIDGE ROAD (CS 1213). Let by Kentucky Transportation Cabinet on April 24, 2025, Franklin, District 5. 5 bids received; low bid $3,288,668 by L-M Asphalt Partners LTD D/B/A Ats Construction, -15% against the engineer's estimate of $3,880,817.

Owner
Kentucky Transportation Cabinet
Letting
24 APR 2025
Pay items
118
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1L-M Asphalt Partners LTD D/B/A Ats Construction$3,288,668Low-15%
2Louisville Paving Company Inc$3,768,356+15%-3.0%
3Cleary Construction Inc$3,865,000+18%0.0%
4Rame Contracting LLC$3,999,365+22%+3.0%
5Bluegrass Contracting Corporation$4,033,650+23%+4.0%
KYTC contract 25-1301: bids by rank

Engineer's estimate: $3,880,817.

Bid tabulation

LinePay itemUnitQuantity1. L-M Asphalt Partners LTD D/B/A Ats Construction2. Louisville Paving Company Inc3. Cleary Construction Inc4. Rame Contracting LLC5. Bluegrass Contracting Corporation
0010Crushed stone baseTON A4,227$32.50$37.00$37.00$45.00$34.00
0020Leveling & wedging PG64-22TON A249$109.00$106.00$109.00$109.00$123.00
0030CL2 asph base 1.00D PG64-22TON A3,384$89.80$89.00$89.80$89.80$101.50
0040CL2 asph surf 0.38B PG64-22TON A1,472$109.00$91.00$109.00$109.00$123.00
0050Asphalt material for tackTON A11.30$350.00$0.01$350.00$350.00$395.50
0060JPC pavement-11 inSQYD A445$157.68$157.68$157.68$157.68$176.50
0070Cem conc ent pavement-8 inSQYD A450$92.65$92.65$92.65$92.65$117.50
0080Asphalt pave milling & texturingTON A565$45.00$30.83$20.00$33.60$73.50
0090Perforated pipe-4 inLF A3,494$15.00$27.35$28.00$42.50$15.00
0100Non-perforated pipe-4 inLF A90$35.00$60.44$35.00$45.00$19.75
0110Inspect & certify edge drain systemLS A1$2,500.00$2,500.00$2,500.00$3,611.75$2,800.00
0120Cored hole drainage box con-4 inEACH A14$50.00$45.00$900.00$1,500.00$565.00
0130Standard curb and gutterLF A4,470$25.91$25.91$25.91$25.91$33.25
0140Standard curb and gutter modLF A609$30.61$30.61$30.61$30.61$47.50
0150Remove curb and gutterLF A1,593$4.68$15.20$11.82$11.11$18.00
0160Lip curb and gutterLF A716$28.84$28.84$28.84$28.84$45.75
0170Standard integral curbLF A32$38.24$38.24$38.24$38.24$30.00
0180Standard header curbLF A417$32.13$32.13$32.13$32.13$46.00
0190Island header curb type 1LF A42$39.58$39.58$39.58$39.58$46.00
0200Standard barrier median type 2SQYD A733.90$91.45$91.45$91.45$91.45$113.50
0210Standard barrier median type 4SQYD A373.30$82.16$82.16$82.16$82.16$95.00
0220Mountable median type 2SQYD A47$138.31$138.31$138.31$138.31$95.00
0230Mountable median type 4SQYD A6.60$115.07$1,507.06$104.61$115.07$95.00
0240Barricade-type IIEACH A7$497.61$50.00$50.00$200.00$218.00
0250Barricade-type IIIEACH A19$505.71$100.00$100.00$250.00$218.00
0260Remove concrete islandSQYD A105$35.47$76.86$30.00$50.00$37.75
0270Remove pavementSQYD A6,124$10.00$8.09$10.00$9.65$9.25
0280Temp ditchLF A2,007$1.00$2.51$1.00$0.15$2.75
0290Clean temp ditchLF A1,004$0.01$2.51$0.10$0.15$1.50
0300Embankment in placeCUYD A32,027$18.00$30.50$24.50$23.75$23.25
0310Remove guardrailLF A347$5.00$5.45$5.00$5.45$6.25
0320Witness postEACH A8$50.00$156.85$156.85$156.85$177.00
0330Clearing and grubbingLS A1$50,000$25,890$95,000$18,200$62,000
0340Temporary signsSQFT A276$10.60$5.00$5.00$9.00$12.00
0350Edge keyLF A507$30.00$1.25$2.00$30.00$34.00
0360Maintain & control trafficLS A1$165,000$135,000$163,000$242,500$146,000
0370Mobilization for mill & textLS A1$3,000.00$1,500.00$4,500.00$1,500.00$3,400.00
0380Temp silt fenceLF A2,007$3.00$2.50$3.00$3.50$3.00
0390Silt trap type AEACH A7$350.00$1,973.86$315.00$325.00$300.00
0400Silt trap type BEACH A7$150.00$1,156.53$150.00$325.00$300.00
0410Silt trap type CEACH A7$150.00$262.54$345.00$195.00$300.00
0420Clean silt trap type AEACH A7$50.00$152.89$1.00$25.00$70.00
0430Clean silt trap type BEACH A7$50.00$152.89$1.00$25.00$70.00
0440Clean silt trap type CEACH A7$50.00$198.94$1.00$25.00$70.00
0450Sidewalk-4 in concreteSQYD A2,370$50.66$50.66$50.66$50.66$85.00
0460StakingLS A1$35,000$41,065$100,000$38,000$85,000
0470Remove structureLS A1$5,000.00$5,000.00$20,000$10,000$5,600.00
0480Adjust water valveEACH A3$100.00$175.00$2,341.47$575.00$250.00
0490Remove lightingLS A1$1,500.00$1,500.00$1,500.00$1,500.00$1,700.00
0500Erosion control blanketSQYD A3,597$2.90$2.69$2.90$2.69$3.00
0510Temp mulchSQYD A23,050$0.33$0.37$0.33$0.37$0.40
0520Temp seeding and protectionSQYD A17,279$0.35$0.39$0.35$0.39$0.40
0530Initial fertilizerTON A0.90$1,500.00$1,250.00$1,500.00$1,250.00$1,400.00
0540Maintenance fertilizerTON A0.50$1,600.00$1,250.00$1,600.00$1,250.00$1,400.00
0550Seeding and protectionSQYD A16,698$0.73$0.70$0.73$0.70$0.80
0560SoddingSQYD A2,956$14.00$12.00$14.00$12.00$13.50
0570Agricultural limestoneTON A10.40$85.00$73.96$85.00$73.96$83.50
0580Pave striping-temp paint-6 inLF A2,163$0.35$0.35$0.35$0.35$0.40
0590Pave striping-thermo-6 in WLF A9,660$1.25$1.25$1.25$1.25$1.50
0600Pave striping-thermo-6 in YLF A7,410$1.25$1.25$1.25$1.25$1.50
0610Pave striping-thermo-12 in WLF A935$4.50$4.50$4.50$4.50$5.00
0620Pave marking-thermo X-walk-6 inLF A655$3.50$3.50$3.50$3.50$4.00
0630Pave marking-thermo stop bar-24INLF A92$10.00$10.00$10.00$10.00$11.25
0640Pave marking-thermo cross-hatchSQFT A7,565$4.50$4.50$4.50$4.50$5.00
0650Pave marking-thermo STR arrowEACH A3$100.00$100.00$100.00$100.00$113.00
0660Pave marking-thermo curv arrowEACH A26$120.00$120.00$120.00$120.00$135.50
0670Pave marking-thermo comb arrowEACH A11$125.00$125.00$125.00$125.00$141.00
0680Pave marking-thermo onlyEACH A2$275.00$275.00$275.00$275.00$310.50
0690Fuel adjustmentDOLL A17,721$1.00$1.00$1.00$1.00$1.00
0700Asphalt adjustmentDOLL A39,897$1.00$1.00$1.00$1.00$1.00
0710W fire hydrant relocateEACH A1$2,500.00$3,826.49$7,500.00$6,000.00$8,000.00
0720S manhole abandon/removeEACH A3$2,000.00$2,682.93$1,500.00$1,550.00$1,825.00
0730S manhole adjust to gradeEACH A2$2,000.00$2,407.72$1,100.00$2,060.00$1,450.00
0740Saw cutLF A2,646$3.00$1.00$2.50$4.00$2.25
0750Longitudinal edge keyLF A1,674$9.00$9.50$10.00$15.00$10.25
0760Pave mark thermo cone cap-solid yellowSQFT A70$7.00$7.00$7.00$7.00$8.00
0770Pave marking-thermo yield bar-36 inLF A60$35.00$35.00$35.00$35.00$39.50
0780Water blasting existing stripeLF A470$4.30$4.30$4.30$4.30$4.75
0790Detectable warningsSQFT A533$46.16$46.16$46.16$46.19$44.50
0800High friction surface treatmentSQYD A1,333$30.00$28.52$28.52$50.60$32.25
0810Pave mark-thermo-X-walk-24 inLF A980$10.00$10.00$10.00$10.00$11.25
0820Remove light poleEACH A2$1,000.00$1,000.00$1,000.00$1,000.00$1,150.00
0830Roundabout arrowEACH A2$500.00$500.00$500.00$500.00$565.00
0840Island curb and gutter(modified)LF A84$156.22$56.73$56.37$56.73$49.50
0850R/W monument type 3EACH A32$150.00$174.73$174.73$375.43$197.50
0860Utility coordinationLS A1$10,000$25,000$40,000$18,500$11,400
0870Storm sewer pipe-12 inLF A16$70.00$185.00$145.00$115.00$200.00
0880Storm sewer pipe-15 inLF A29$75.00$200.00$225.00$122.00$220.00
0890Storm sewer pipe-18 inLF A2,355$85.00$118.00$102.00$170.25$155.00
0900Storm sewer pipe-30 inLF A55$140.00$175.00$215.00$235.00$325.00
0910Pipe culvert headwall-30 inEACH A1$2,750.00$2,700.00$3,500.00$3,250.00$3,000.00
0920Remove pipeLF A126$20.00$99.91$50.00$20.00$30.00
0930Plug pipeEACH A1$1,250.00$2,848.81$1,500.00$3,200.00$1,875.00
0940Curb box inlet type AEACH A7$7,250.00$5,100.00$9,000.00$6,000.00$6,500.00
0950Curb box inlet type BEACH A17$7,200.00$4,210.00$10,500$6,250.00$6,200.00
0960Drop box inlet type 3EACH A2$6,750.00$9,100.00$10,000$10,250$4,500.00
0970Drop box inlet type 4EACH A1$7,800.00$12,800$8,500.00$14,500$5,750.00
0980Drop box inlet type 16GEACH A1$6,000.00$8,200.00$4,500.00$10,050$4,500.00
0990Drop box inlet type 16SEACH A1$7,300.00$9,200.00$6,850.00$12,640$6,000.00
1000Cap curb box inletEACH A3$1,300.00$2,800.00$2,000.00$1,600.00$1,750.00
1010Remove inletEACH A2$750.00$2,800.00$950.00$150.00$1,000.00
1020Manhole type AEACH A2$5,300.00$4,210.00$4,500.00$3,890.00$6,700.00
1030Channel lining class IITON A18$45.00$304.59$95.00$96.00$106.50
1040Fabric-geotextile class 1SQYD A36$1.38$19.44$8.00$12.50$10.00
1050Fabric-geotextile class 2 for pipeSQYD A3,563$2.00$2.00$2.00$2.00$2.00
1060SafeloadingCUYD A8$250.00$622.46$405.00$850.00$400.00
1070Cored hole drainage box con- 18 inEACH A1$300.00$400.00$2,000.00$1,725.00$1,400.00
1080Pipeline inspectionLF A2,454$2.33$2.35$2.35$2.35$2.75
1090SBM alum sheet signs .080 inSQFT A516$37.00$39.66$37.00$39.66$44.75
1100Steel post type 1LF A656$29.00$28.45$29.00$28.45$32.25
1110GMSS type DEACH A6$350.00$801.35$350.00$801.35$905.50
1120Barcode sign inventoryEACH A93$35.00$29.26$35.00$29.26$33.00
1130Electrical junction box type BEACH A20$1,250.00$1,250.00$1,250.00$1,250.00$1,400.00
1140Trenching and backfillingLF A2,876$6.00$6.00$6.00$6.00$6.75
1150PVC conduit-1 1/4 in-schedule 80LF A2,266$5.00$5.00$5.00$5.00$5.75
1160PVC conduit-2 in-schedule 80LF A610$6.50$6.50$6.50$6.50$7.25
1170MobilizationLS A1$150,000$169,000$176,000$185,000$186,500
1180DemobilizationLS A1$46,500$53,000$54,431$56,000$56,007
KYTC contract 25-1301: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of April 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy