Bluegrass Contracting Corporation: KYTC bid record
Bluegrass Contracting Corporation submitted 54 bids on Kentucky Transportation Cabinet contracts in the data, from 25 SEP 2020 to 24 SEP 2026, and was the low bidder on 27 of them (50%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $38,430,768
- Latest bid
- 24 SEP 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 0 | 0% |
| 2021 | 14 | 7 | 50% |
| 2022 | 8 | 4 | 50% |
| 2023 | 4 | 4 | 100% |
| 2024 | 4 | 4 | 100% |
| 2025 | 17 | 6 | 35% |
| 2026 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 9 | 5 | 56% |
| District 4 | 7 | 2 | 29% |
| District 11 | 5 | 4 | 80% |
| District 9 | 4 | 2 | 50% |
| District 3 | 4 | 3 | 75% |
| District 8 | 2 | 1 | 50% |
| District 10 | 2 | 1 | 50% |
| District 12 | 1 | 0 | 0% |
| District 6 | 1 | 0 | 0% |
| District 7 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Maintain & control traffic | LS A A | 21 | 17 (81%) | $16,550 | $10,625 | |
| Demobilization | LS A A | 16 | 9 (56%) | $15,069 | $10,682 | |
| Staking | LS A A | 17 | 8 (47%) | $7,680.00 | $10,000 | |
| Arrow panel | EACH | 14 | 8 (57%) | $1,790.00 | $580.00 | |
| Portable changeable message sign | EACH | 20 | 7 (35%) | $2,599.00 | $1,750.00 | |
| Fuel adjustment | DOL | 7 | 7 (100%) | $1.00 | $1.00 | |
| Portable changeable message sign | EACH A A | 15 | 5 (33%) | $1,675.00 | $1,707.88 | |
| Dga base | TON | 14 | 5 (36%) | $47.00 | $45.00 | |
| Crushed stone base | TON | 10 | 5 (50%) | $42.75 | $40.00 | |
| Fabric-geotextile class 2 | SY | 10 | 5 (50%) | $2.27 | $2.75 | |
| Dga base | TON A A | 10 | 5 (50%) | $44.00 | $52.07 | |
| Roadway excavation | CY | 9 | 5 (56%) | $48.50 | $40.69 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| The Harper Company DBA the W L Harper Co | 14 | 3 of 14 |
| Hinkle Construction Services LLC | 9 | 1 of 9 |
| Mountain Enterprises Inc | 8 | 6 of 8 |
| Louisville Paving Company Inc | 7 | 6 of 7 |
| Scott and Murphy Inc | 6 | 3 of 6 |
| Mac Construction & Excavating Inc | 5 | 1 of 5 |
| Hall Contracting of Kentucky Inc | 5 | 0 of 5 |
| E & B Paving LLC | 3 | 0 of 3 |
| Walker Construction & Materials LLC | 3 | 2 of 3 |
| Frederick & May Construction Co | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 SEP 2026 | 26-4128 | ASPHALT SURFACE WITH GRADE & DRAIN KY HIGHWAY 90 (KY 90) | 1 of 3 | $3,619,935 | Low, 5.0% under the second | |
| 25 JUN 2026 | 26-1126 | JPC PAVEMENT I-75 NB REST AREA TRUCK PARKING EXPANSION - SCOTT | 3 of 4 | $7,840,260 | +15% | |
| 25 JUN 2026 | 26-1127 | JPC PAVEMENT I-75 NB REST AREA TRUCK PARKING EXPANSION - WHITLEY CO. | 2 of 3 | $2,379,534 | +9.0% | |
| 26 MAR 2026 | 26-2154 | JPC PAVEMENT INTERSECTION OF US 127B, US 127 AND ALTON ROAD (US 127B) | 1 of 2 | $1,743,550 | Low, 7.0% under the second | |
| 20 NOV 2025 | 25-2341 | JPC PAVEMENT INLAY WINSTON AVE/DECOURSEY AVE (KY 16) | 1 of 3 | $248,410 | Low, 37% under the second | |
| 23 OCT 2025 | 25-2343 | JPC PAVEMENT BLACKBURN AVENUE (KY 168) | 2 of 5 | $442,520 | +1.0% | |
| 23 OCT 2025 | 25-2349 | JPC PAVEMENT SEATON AVENUE (US 23) | 2 of 5 | $1,499,225 | +1.0% | |
| 23 OCT 2025 | 25-2350 | JPC PAVEMENT HAL ROGERS PARKWAY (HR 9006) | 2 of 3 | $2,156,526 | +7.0% | |
| 25 SEP 2025 | 25-2339 | JPC PAVEMENT JACKSON - CAMPTON ROAD (KY 15) | 1 of 4 | $465,530 | Low, 2.0% under the second | |
| 25 SEP 2025 | 25-2340 | JPC PAVEMENT MILLERS CREEK ROAD (KY 1571) | 1 of 4 | $133,265 | Low, 32% under the second | |
| 25 SEP 2025 | 25-2337 | JPC PAVEMENT PRESTONSBURG STREET (US 460) | 2 of 4 | $336,206 | +2.0% | |
| 25 SEP 2025 | 25-2317 | JPC PAVEMENT SCOTTSVILLE ROAD (US 231) | 1 of 3 | $316,025 | Low, 3.0% under the second | |
| 21 AUG 2025 | 25-2316 | JPC PAVEMENT REPAIRS FRANKLIN AND SHELBY COUNTIES (US 127 & KY 55) | 1 of 4 | $2,056,071 | Low, 16% under the second | |
| 24 JUL 2025 | 25-2247 | JPC PAVEMENT REPAIRS - DIAMOND GRINDING OWENSBORO ROAD (US 60 EASTBOUND ONLY) | 2 of 6 | $6,278,345 | +7.0% | |
| 24 JUL 2025 | 25-2257 | WIDENING MT. STERLING ROAD (US 460) | 3 of 3 | $235,590 | +61% | |
| 05 JUN 2025 | 25-1314 | JPC PAVEMENT REPAIRS - DIAMOND GRINDING KY 22 | 1 of 1 | $1,045,960 | Low | |
| 05 JUN 2025 | 25-1901 | GRADE & DRAIN WITH ASPHALT SURFACE TURN LANES AT AA HIGHWAY (KY 9) & KY 709 INTERSECTION | 3 of 3 | $539,885 | +20% | |
| 22 MAY 2025 | 25-1311 | AIRPORT CONSTRUCTION CAPITAL CITY AIRPORT | 3 of 3 | $1,344,370 | +54% | |
| 24 APR 2025 | 25-1301 | District 5 | GRADE & DRAIN WITH ASPHALT SURFACE VANDALAY DRIVE (CS 1212) AND WEST RIDGE ROAD (CS 1213) | 5 of 5 | $4,033,650 | +23% |
| 20 FEB 2025 | 25-1303 | District 4 | GRADE & DRAIN WITH ASPHALT SURFACE KY 2154 | 3 of 3 | $3,399,910 | +18% |
| 23 JAN 2025 | 25-1101 | District 10 | GRADE & DRAIN WITH ASPHALT SURFACE KY 191/US 460 IMPROVEMENTS | 2 of 2 | $1,173,640 | +21% |
| 18 JUL 2024 | 24-2268 | District 9 | GRADE & DRAIN US 62/KY 9 INTERSECTION | 1 of 3 | $3,370,110 | Low |
| 18 JUL 2024 | 24-3038 | District 4 | JPC PAVEMENT BATTLETOWN RD (KY 228) | 1 of 3 | $294,852 | Low, 21% under the second |
| 21 MAR 2024 | 24-2126 | District 5 | JPC PAVEMENT OUTER LOOP (KY 1065) | 1 of 5 | $3,357,350 | Low, 1.0% under the second |
| 25 JAN 2024 | 24-2261 | District 3 | JPC PAVEMENT REPAIRS - DIAMOND GRINDING SCOTTSVILLE ROAD (KY 100) | 1 of 3 | $837,080 | Low, 11% under the second |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.